1.

Which requirements are the foundation from which quality is measured?

a)

Hardware

b)

Software

c)

Programmers

d)

None of the mentioned

2.

Which of the following is not a SQA plan for a project?

a)

evaluations to be performed

b)

audits and reviews to be performed

c)

amount of technical work

d)

documents to be produced by the SQA group

3.

Degree to which design specifications are followed in manufacturing the product is called

a)

Quality Control

b)

Quality of conformance

c)

Quality Assurance

d)

None of the mentioned

4.

Which of the following is not included in External failure costs?

a)

testing

b)

help line support

c)

warranty work

d)

complaint resolution

5.

Which of the following is not an appraisal cost in SQA?

a)

inter-process inspection

b)

maintenance

c)

quality planning

d)

testing

6.

The primary objective of formal technical reviews is to find _________ during the process so that they do not become defects after release of the software.

a)

errors

b)

equivalent faults

c)

failure cause

d)

none of the mentioned

7.

What is not included in prevention costs?

a)

quality planning

b)

formal technical reviews

c)

test equipment

d)

equipment calibration and maintenance

8.

Software quality assurance consists of the auditing and reporting functions of management.

a)

False

b)

True

9.

ISO 9001 is not concerned with ____________ of quality records.

a)

collection

b)

maintenance

c)

verification

d)

dis-positioning

10.

_______ states that, where appropriate, adequate statistical techniques are identified and used to verify the acceptability of process capability and product characteristics.

a)

ISO 9000-4

b)

All of the mentioned

c)

ISO 9001

d)

CMM

11.

Software quality assurance consists of which function of management.

a)

reporting functions

b)

auditing functions

c)

none of the these

d)

all of the above

12.

Select the people who identify the document and verifies the correctness of the software…

a)

Project manager

b)

SQA team

c)

Project team

d)

All of the mentioned

13.

which level of testing is used to identifying the defects …

a)

Acceptance testing

b)

Integration testing

c)

System Testing

d)

Unit testing

14.

In which phase the defect is less costly…

a)

Coding

b)

Design

c)

Requirements Gathering

d)

Implementation

15.

What happened if an expected result is not specified then

a)

we cannot run the test

b)

we cannot automate the user input values

c)

it may be difficult to determine if the test has passed or failed

d)

it may difficult to repeat the test

16.

McCall Factor model can be classified into

a)

3

b)

4

c)

11

d)

5

17.

How many factors are there in McCall factor Model?

a)

11

b)

3

c)

4

d)

5

18.

_______________ is the process used to determine whether a system or component is suitable for operational use.

a)

Verification

b)

Validation

c)

Qualification

d)

none of the these

19.

_________________ is the process of evaluating products of a development phase to find out whether they meet the specified requirements

a)

Verification

b)

Validation

c)

Qualification

d)

None of these

20.

_____________ is the process of evaluating software at the end of the development process to determine whether software meets the customer expectations and requirements.

a)

Validation

b)

Verification

c)

Qualification

d)

None of these

21.

How many students have confident to get pass in all the subjects?

a)

Yes

b)

No

c)

Maybe