WorksheetsRisk Management
Total questions: 10
Worksheet time: 8mins
(BLANK) is the process of identifying, assessing, and controlling risks arising from operational factors and making decisions that balance risk cost with mission benefits.
Risk decision
Risk management
Assessing hazards
operational planning
A (blank) is a commander, leader, or individual's determination to accept or not accept the risk(s) associated with an action he or she will take or will direct others to take.
Risk decision
Risk tolerance
Risk management
Risk control
Risk tolerance is the level of risk the responsible commander is willing to accept.
True
False
In risk management, a condition with the potential to cause injury, illness, or death of personnel; damage to or loss of equipment or property, or mission degradation is a:
accidental loss
potential loss
hazard
risk
Select the correct order of the five steps in deliberate Risk Management:
Assess the hazards, Identify the hazards, Develop controls and make risk decisions, Supervise and evaluate, and Implement controls
Identify the hazards, Assess the hazards, Develop controls and make risk decisions, Implement controls, and Supervise and evaluate
Identify the hazards, Assess the hazards, Develop controls and make risk decisions, Supervise and evaluate, and Implement controls
Identify the hazards, Assess the hazards, Implement controls, Supervise and evaluate, and Develop controls and make risk decisions
(Blank) is the frequency and length of time personnel and equipment are subject to a hazard or hazards.
(a)
What level of risk are conditions that pose an expectation of degraded mission capabilities?
Low risk
Extremely high risk
High risk
Medium risk
What level of risk refers to expected loss of ability to accomplish the mission if exposure occurs during operations?
Low risk
High risk
Extremely high risk
Medium risk
A control is an action taken to eliminate a hazard or to reduce its risk.
True
False
When do we use Risk Management?
