WorksheetsARCHITECTURAL CONSTRUCTION DRAWINGS BASICS
Total questions: 15
Worksheet time: 6mins
What is the first step involved in structural design?
Proposing a structural system
Design of structural members
Geo technical Survey
Structural modelling
What does NGL mean in an Section drawing?
(a)
If this drawing is a Plan, What does this represent?
A Beam
A Column
A Foundation
None
A slab used to take pipelines below the toilets in upper floor levels is called as
(a)
identify the detail is shown in the picture
Circular columns with roof slab
Columns with cutout in the center
Pile foundation with Types of pile caps
Different type of column grouping layout
In a normal staircase both the waist slab and steps are done in concrete.
True
False
With reference to Electrical Layout what is a DB
Distribution box
Direct box
Direct booster
Data Booster
What is the full form of MCB
(a)
In Plumbing Drawings what does IC mean?
(a)
What does Soil Pipe Carry out from the toilet?
Waste water
Both Waste water and waste from WC
Waste from WC
Water from planter Box
What is full form of HVAC?
(a)
What is the general height of the switch board
4' to 4'6"
1' to 1'6"
5' to 6'
3' to 3'6"
In a bed room with attached toilet which is the ideal position to place a switch board?
As soon as the door is opened
Near the bed head board
Outside toilet door
All of positions said here are ideal positions
Data cable and electrical cables can be run adjacent to each other? True or false
True
False
Identify this
(a)