wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Sdlc quiz

Total questions: 15

Worksheet time: 8mins

Name
Class
Date
1.

SDLC stands for

a)

Software Development Life Cycle

b)

System Development Life cycle

c)

Software Design Life Cycle

d)

System Design Life Cycle

2.

In waterfall model, output of one phase is input to next phase. True or false.

a)

true

b)

false

3.

In a college,students are asked to develop a software. Which model would be preferable?

a)

Waterfall model

b)

Spiral model

c)

Code and fix model

d)

Agile model

4.

Which activity is carried out first?

a)

Verification

b)

Validation

c)

Both

d)

None

5.

Which one is most important phase of sdlc

a)

Design

b)

Testing

c)

Requirement analysis

d)

coding

6.

In the V-V model of software development, testing starts in parallel with the development.

a)

True

b)

False

7.

The spiral model was originally proposed by

a)

IBM

b)

Barry Boehm

c)

Pressman

d)

Royce

8.

Which model deals with risk assesment

a)

waterfall model

b)

iterative model

c)

build and fix model

d)

spiral model

9.

RAD stands for

a)

Rapid Application Development

b)

Relative Application Development

c)

None of the mentioned

d)

Rapid Application Document

10.

Identify the disadvantage of Spiral Model.

a)

High amount of risk analysis

b)

Strong approval and documentation control

c)

Doesn’t work well for smaller projects

d)

Additional Functionality can be added at a later date

11.

Selection of a model is based on

a)

Requirements

b)

Users

c)

Development team

d)

All of the mentioned

12.

Find out which phase is not available in SDLC?

a)

Testing

b)

Coding

c)

Maintenance

d)

Abstraction

13.

How many phases in spiral model?

a)

4

b)

3

c)

2

d)

4

14.

The linear sequential model of software development is also known as the

a)

Classical life cycle model

b)

Waterfall model

c)

Both a and b

d)

Spiral model

15.

Which is best life cycle model?

a)

Waterfall model

b)

spiral model

c)

prototype model

d)

All model are good depends on project size