wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

CST 150, Lesson 1 review

Total questions: 10

Worksheet time: 6mins

Name
Class
Date
1.

CSI Division 22 covers what part of construction?

a)

Mechanical

b)

Fire Protection

c)

Electrical

d)

Correct answer not shown

2.

CSI Division 26 covers what part of construction?

a)

Mechanical

b)

Fire Protection

c)

Electrical

d)

Correct answer not shown

3.

What room number are you in?

(a)  

4.

BIM software can be used to layout M-E-P systems because

a)

they are very complex and conflicts can be reduced prior to building

b)

3D modeling looks cool and gives an Owner a look at what's being built

c)

it makes the Designer's job easier

d)

so the contractor knows where to put the Fire Pump

5.

Systems that interact to keep temperature and humidity levels within a comfortable range are known as

a)

Electrical

b)

Plumbing

c)

Fire Protection

d)

Mechanical

6.

Systems that provide AC or DC voltage, wiring and circuitry to run other devices would fall under

a)

Electrical

b)

Plumbing

c)

Fire Protection

d)

Mechanical

7.

A 45-90 second introduction of yourself and your skills would also be known as...

a)

An Excavator Speech

b)

An Escalator Speech

c)

An Elevator Speech

d)

An Introduction

8.

Hot water for hotel showers, drinking water for fountains and waste piping for toilets & baths fall under what system?

a)

Electrical

b)

Plumbing

c)

Fire Protection

d)

Security

9.

These characterize the control functions of the building envelope to ensure it is energy efficient, comfortable & sustainable (select all that apply)

a)

Moisture control

b)

Thermal control

c)

Security control

d)

Thermal control

e)

Network & Wi-Fi control

10.

In each class, the _______ has to be completed first in Blackboard in order to see the Lessons.

a)

Course Evaluation Questionaire

b)

Course Entry Quiz

c)

Coarse Enter Questions

d)

Course Emprovement Question