WorksheetsCST 150, Lesson 1 review
Total questions: 10
Worksheet time: 6mins
CSI Division 22 covers what part of construction?
Mechanical
Fire Protection
Electrical
Correct answer not shown
CSI Division 26 covers what part of construction?
Mechanical
Fire Protection
Electrical
Correct answer not shown
What room number are you in?
(a)
BIM software can be used to layout M-E-P systems because
they are very complex and conflicts can be reduced prior to building
3D modeling looks cool and gives an Owner a look at what's being built
it makes the Designer's job easier
so the contractor knows where to put the Fire Pump
Systems that interact to keep temperature and humidity levels within a comfortable range are known as
Electrical
Plumbing
Fire Protection
Mechanical
Systems that provide AC or DC voltage, wiring and circuitry to run other devices would fall under
Electrical
Plumbing
Fire Protection
Mechanical
A 45-90 second introduction of yourself and your skills would also be known as...
An Excavator Speech
An Escalator Speech
An Elevator Speech
An Introduction
Hot water for hotel showers, drinking water for fountains and waste piping for toilets & baths fall under what system?
Electrical
Plumbing
Fire Protection
Security
These characterize the control functions of the building envelope to ensure it is energy efficient, comfortable & sustainable (select all that apply)
Moisture control
Thermal control
Security control
Thermal control
Network & Wi-Fi control
In each class, the _______ has to be completed first in Blackboard in order to see the Lessons.
Course Evaluation Questionaire
Course Entry Quiz
Coarse Enter Questions
Course Emprovement Question
