Software Engineering Quiz Project Planning

Total questions: 20

Worksheet time: 15mins

Name
Class
Date
1.

After the finalization of SRS, we may like to estimate

a)

Size

b)

Cost

c)

Development time

d)

All of these

2.

Which one is not a size measure for software

a)

LOC

b)

Function Count

c)

Cyclomatic Complexity

d)

Halstead’s program length

3.

Function count method was developed by

a)

B.Beizer

b)

B.Boehm

c)

M.Halstead

d)

Alan Albrecht

4.

Function point analysis (FPA) method decomposes the system into functional units. The total number of functional units are:

a)

2

b)

5

c)

4

d)

1

5.

Function point can be calculated by

a)

UFP * CAF

b)

UFP * FAC

c)

UFP * Cost

d)

UFP * Productivity

6.

COCOMO was developed initially by

a)

B.W.Bohem

b)

Gregg Rothermal

c)

B.Beizer

d)

E. F. Codd

7.

A COCOMO model is

a)

Common Cost estimation model

b)

Constructive cost Estimation model

c)

Complete cost estimation model

d)

Comprehensive Cost estimation model

8.

Estimation of software development effort for organic software is COCOMO is

a)

E = 2.4 (KLOC)1.05 PM

b)

E = 3.4 (KLOC)1.06 PM

c)

E = 2.0 (KLOC)1.05 PM

d)

E = 2.4 (KLOC)1.07 PM

9.

Estimation of size for a project is dependent on

a)

Cost

b)

Schedule

c)

Time

d)

None pf these

10.

In function point analysis, number of Complexity adjustment factor are

a)

10

b)

20

c)

14

d)

12

11.

Cost estimation for a project may include:

a)

Software Cost

b)

Hardware Cost

c)

Personnel Cost

d)

All of these

12.

In COCOMO model, if project size is typically 2-50 KLOC, then which mode is to be selected?

a)

Organic

b)

Semidetached

c)

Embedded

d)

Productive

13.

Which of the following is an important factor that can affect the accuracy and efficacy of estimates?

a)

Project size

b)

Planning process

c)

Project complexity

d)

Degree of structural uncertainty

14.

Software project estimation can never be an exact science, but a combination of good historical data and systematic techniques can improve estimation accuracy.

a)

True

b)

False

15.

Which of the following is not an effective software project management focus:

a)

Process

b)

Product

c)

Popularity

d)

People

16.

Being a software manager, when you will decide the number of people required for a software project?

a)

Before the scope is determined.

b)

Before an estimate of the development effort is made.

c)

After an estimate of the development effort is made.

d)

No need to decide

17.

Which of the following is / are the different types of resources?

a)

Employees

b)

Reusable Software

c)

Office Equipments

d)

All of these

18.

What is the first activity in Software Project Planning?

a)

Determination of software scope

b)

Determination of budget

c)

Find out the team size

d)

None of these

19.

What is the main objective of Software Project Planning?

a)

Estimation of resources

b)

Estimation of cost

c)

Estimation of schedule

d)

All of the above

20.

The size estimate for a software product to be built must be based on a direct measure like LOC.

a)

True

b)

False