Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Systems and Optimization

Total questions: 17

Worksheet time: 9mins

Name
Class
Date
1.

The means of achieving a desired result is called a what?

a)

Input

b)

System

c)

Feedback

2.

Systems are required to have which components?

a)

input, output, feedback

b)

input, output, optimization, outcomes

c)

input, process, output, feedback, optimization.

d)

input, process, output, feedback

3.

Inputs ______________.

a)

can be many forms

b)

are only people, data and time

c)

are needed to avoid unwanted outcomes.

4.

The most critical input an engineering has is what?

a)

Data

b)

Materials

c)

Energy

d)

Capital

5.

Having the ability to control your own environment falls under what input?

a)

Data

b)

Time

c)

Materials

d)

People

6.

The ability to do work in forms like mechanical, nuclear and wind is an example of what input?

a)

Time

b)

Energy

c)

Tools and Machines

7.

Goods and substances developed into products is an example of what input?

a)

Capital

b)

Tools and Machines

c)

Materials

d)

People

8.

Ideas and concepts in the manufacturing industry were revolutionized as a result of ___________.

a)

Inputs

b)

Processes

c)

Rejects

d)

Globalization

9.

A path an item will travel for assembly before manufacturing is called what?

a)

Reject

b)

Routing

c)

Assembly

d)

Controlling

10.

Products that do not meet standards but can be fixed is an example of a _________.

a)

Rework

b)

Reject

c)

Accepted

11.

A product that meets standards and is able to move on in assembly is an example of __________.

a)

Rework

b)

Reject

c)

Accepted

12.

A product that does not meet standards and cannot be fixed is an example of ___________.

a)

Rework

b)

Accepted

c)

Reject

13.

Example outputs are products, structures or services. What else could outputs potentially include?

a)

Feedback for later use

b)

Unwanted outcomes

c)

Capital savings in the process

d)

Time, Tools and Machines and People

14.

Processes depend most importantly on what?

a)

Communication and the inputs involved

b)

Development of machines

c)

A variety of methods for actions to be completed

15.

Doing the most with the least is called what?

a)

Globalization

b)

Optimization

c)

Scheduling

d)

Controlling

16.

Determining when items need to be done and hours for workers is an example of what part of manufacturing production?

a)

Routing

b)

Scheduling

c)

Controlling

17.

Inspecting and determining quality of materials is what part of manufacturing production?

a)

Scheduling

b)

Controlling

c)

Routing