wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

CIS2303 Week_3 CLO2

Total questions: 13

Worksheet time: 7mins

Name
Class
Date
1.

SDLC Core processes are applicable to a structured, iterative, or agile development

a)

True

b)

False

2.

With ____ methodology, SDLC core processes are performed multiple times

a)

Structured

b)

Rapid

c)

Agile

d)

Standard

3.

The objective of _____ activity is to ensure that the new system meets the business need

a)

Identify the problem

b)

Perform Feasibility Study

c)

Obtain Approval

d)

None of the Above

4.

Objective of ____ activity is to verify whether a project can be started and completed successfully

a)

Identify the problem

b)

Obtain Approval

c)

Perform Feasibility Studies

d)

None of the above

5.

_________ objective measures how suitable the development of the system will be to the company

a)

Identify the problem

b)

Perform Feasibility Studies

c)

Obtain Approval

d)

None of the Above

6.

________ feasibility study is conducted when a company is planning to open a branch in a new region

a)

Economic Feasibility

b)

Technical Feasibility

c)

Legal Feasibility

d)

Operational Feasibility

7.

_______ feasibility requires the calculation of duration, cost and the income of the project

a)

Schedule Feasibility

b)

Economic Feasibility

c)

Legal Feasibility

d)

Operational Feasibility

8.

_________ feasibility requires to verify that new system can use the existing network infrastructure

a)

Operational Feasibility

b)

Economic Feasibility

c)

Network Feasibility

d)

Technical Feasibility

9.

__ feasibility verifies whether proposed system will affect organizational structures & procedures

a)

Organizational Feasibility

b)

Operational Feasibility

c)

Procedural Feasibility

d)

Legal Feasibility

10.

Conducting feasibility studies may uncover new ideas and opportunities

a)

True

b)

False

11.

_______ feasibility verifies the measurement of how reasonable the project duration is?

a)

Legal Feasibility

b)

Schedule Feasibility

c)

Operational Feasibility

d)

Economic Feasibility

12.

System analyst performs the feasibility study.

a)

True

b)

False

13.

Select all the Benefits of Conducting a Feasibility Study.

a)

Emphasize potential problems

b)

Provide inputs to improve decision making

c)

List the reasons to/ not to undertake the project

d)

Measure the ability and possibility to complete a project successfully