wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

2020 PMA - Wells & PD&T HSE Conversation

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

The following are the Respect & Care Program approach except:

a)

LTI Free Board

b)

Monthly HSE Bulletin

c)

Weekend Gateway

d)

Welcome Gate

2.

What is the main objective of the LTI Free Board?

a)

To ensure all workers being updated on HSE activities and programs.

b)

To count and reminding all workers on the LTI's free days.

c)

To create a positive mood before start working and maintain a top-down relationships.

d)

A moment to promote the safety, responsibility and accountability of the workers towards his/her family.

3.

The objective of Wells Strategic Initiative is based on the following:

a)

Leadership

b)

Compliance

c)

Capability

d)

All of the above

4.

The following is part of the Project HSE Readiness under Pre-Mob phase except:

a)

CCC & OSP

b)

PCSB PTW Training & e-Assessment

c)

e-Vetting

d)

Project HSE Close-out Report & Lesson Learnt

5.

Specific Instruction for Simultaneous Operations (SISO) document shall be developed in which phase as per Project HSE Readiness timeline?

a)

Planning Stage

b)

Mobilization

c)

Demobilization

d)

Close Out

6.

Below are the registered operational lesson learnt for Dulang Revisit 1.0, EXCEPT:

a)

Crane removal due to rig clashing

b)

7" production packer leak

c)

Sudden release of trapped pressure post perforation

d)

Mud losses during drilling

7.

Which incident was reported as Hi-Po Incident for the Pulai-A project?

a)

Man Overboard During Gangway Crossing

b)

Minor Damage to Personal Assess Platform (PAP) - Due to High Swell

c)

Chain Parted During Skidding Operation

d)

K45 Cabin Window Broken (Hit With ME Structure)

8.

Which of the following is the Restricted Work Case (RWC) - Non LTI reported for Kepong-A project?

a)

Pipe Stopper in contact with tower rack while lifting.

b)

Finger pinch in between elevator handler and tubing collar while POOH.

c)

Diesel overflow after refueling at HPU unit.

d)

Punctured cabin wall.

9.

Notification to asset on the rig arrival shall be submitted...

a)

during planning stage

b)

prior arrival at site

c)

after arrival at site

d)

during project close out

10.

Which of the following is one the Machine Learning & Automation for SSOW Tool?

a)

JHAML Hazards Prediction

b)

SIMOP ML Evaluation

c)

Gas Test Assurance Automation

d)

All of the above