wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

InDesign Domain One 2018

Total questions: 48

Worksheet time: 25mins

Name
Class
Date
1.

When creating content for an audience that may be visually impaired to a point, be sure to choose __________ options accordingly.

a)

typographical

b)

iteration

c)

Constraints

d)

NoDerivs

e)

model

2.

In the cycle of a design plan, a sketch would be considered its first __________.

a)

typographical

b)

iteration

c)

Constraints

d)

NoDerivs

e)

model

3.

__________ are any limitations that may affect the project’s schedule.

a)

typographical

b)

iteration

c)

Constraints

d)

NoDerivs

e)

model

4.

When reading a Creative Commons license, ND stands for __________, meaning the work can be used but not altered.

a)

typographical

b)

iteration

c)

Constraints

d)

NoDerivs

e)

model

5.

In order to use someone’s likeness in a project, they will need to sign a __________ release.

a)

typographical

b)

iteration

c)

Constraints

d)

NoDerivs

e)

model

6.

__________ drawings use mathematical equations instead of tiny dots of color to create a path.

a)

Vector

b)

block quote

c)

gestalt

d)

sans serif

e)

tone

7.

A __________ usually has its own text frame and is isolated for emphasis.

a)

Vector

b)

block quote

c)

gestalt

d)

sans serif

e)

tone

8.

The theory that the whole is greater than the sum of its parts is called __________.

a)

Vector

b)

block quote

c)

gestalt

d)

sans serif

e)

tone

9.

A font without feet is considered to be __________.

a)

Vector

b)

block quote

c)

gestalt

d)

sans serif

e)

tone

10.

The shading of lightness and darkness on an object is called __________.

a)

Vector

b)

block quote

c)

gestalt

d)

sans serif

e)

tone

11.

The CMYK color space is made of...

a)

cyan

b)

magenta

c)

yellow

d)

black

e)

red

12.

What are the FOUR main content questions that need to be answered for every project you work on?

a)

What are the goals of this project?

b)

Who is the target audience?

c)

What are the audience demographics?

d)

Are there accessibility rules or concerns?

e)

What is the color scheme?

13.

Web and print projects will have default __________ differences.

a)

color

b)

format

c)

file

d)

resolution

14.

What is a project lifecycle?

a)

The phases of a project

b)

The amount of time it will take to complete a project

c)

The budget of a project

15.

What is NOT one of the five project management phases?

a)

Planning and analysis phase

b)

Designing phase

c)

Building phase

d)

Testing phase

e)

Budgeting phase

16.

What does CC stand for?

a)

Creative Commons license

b)

Attribution required

c)

No change of license

d)

No changing and adapting

e)

No commercial use

17.

What does BY stand for?

a)

Creative Commons license

b)

Attribution required

c)

No change of license

d)

No changing and adapting

e)

No commercial use

18.

What does SA stand for?

a)

Creative Commons license

b)

Attribution required

c)

No change of license

d)

No changing and adapting

e)

No commercial use

19.

What does ND stand for?

a)

Creative Commons license

b)

Attribution required

c)

No change of license

d)

No changing and adapting

e)

No commercial use

20.

What does NC stand for?

a)

Creative Commons license

b)

Attribution required

c)

No change of license

d)

No changing and adapting

e)

No commercial use

21.

Which licenses do not allow changes? (Choose Two)

a)

CC

b)

BY

c)

SA

d)

ND

e)

NC

22.

Match the symbol to the license.

a)

Copyright

b)

Public Domain

c)

CC BY-NC-SA

d)

CC BY-NC

e)

CC BY

23.

Match the symbol to the license.

a)

Copyright

b)

Public Domain

c)

CC BY-NC-SA

d)

CC BY-NC

e)

CC BY

24.

Match the symbol to the license.

a)

Copyright

b)

Public Domain

c)

CC BY-NC-SA

d)

CC BY-NC

e)

CC BY

25.

A __________ release is a signed document that is needed when using a picture of a person in a project.

a)

model

b)

location

c)

individual

d)

disclosure

26.

It is important to determine how the project will be distributed.

a)

True

b)

False

27.

A stakeholder does not need to be managed because the project must fit their requirements.

a)

True

b)

False

28.

All works need to have a copyright submitted or they are fair use.

a)

True

b)

False

29.

All work must be completed to fall under a copyright.

a)

True

b)

False

30.

Wireframe

a)

A web project visual guide that will represent the overall look of the website

b)

A cycle of a design plan. The first cycle can be a sketch. Next could be a wireframe if it is a web project

c)

The project details of how, why, and when that define the project

d)

Needed when there is a change to the project scope. They need to be requested and receive an approval or denial

e)

The order that feedback is given on specific parts of a project

31.

Iteration

a)

Unauthorized changes to a project scope that can destroy a project

b)

A cycle of a design plan. The first cycle can be a sketch. Next could be a wireframe if it is a web project

c)

The project details of how, why, and when that define the project

d)

Needed when there is a change to the project scope. They need to be requested and receive an approval or denial

e)

The order that feedback is given on specific parts of a project

32.

Change orders

a)

Unauthorized changes to a project scope that can destroy a project

b)

A cycle of a design plan. The first cycle can be a sketch. Next could be a wireframe if it is a web project

c)

The project details of how, why, and when that define the project

d)

Needed when there is a change to the project scope. They need to be requested and receive an approval or denial

e)

The order that feedback is given on specific parts of a project

33.

Project Scope

a)

Unauthorized changes to a project scope that can destroy a project

b)

A cycle of a design plan. The first cycle can be a sketch. Next could be a wireframe if it is a web project

c)

The project details of how, why, and when that define the project

d)

Needed when there is a change to the project scope. They need to be requested and receive an approval or denial

e)

The order that feedback is given on specific parts of a project

34.

Feedback loop

a)

Unauthorized changes to a project scope that can destroy a project

b)

A cycle of a design plan. The first cycle can be a sketch. Next could be a wireframe if it is a web project

c)

The project details of how, why, and when that define the project

d)

Needed when there is a change to the project scope. They need to be requested and receive an approval or denial

e)

The order that feedback is given on specific parts of a project

35.

Scope creep

a)

Unauthorized changes to a project scope that can destroy a project

b)

A cycle of a design plan. The first cycle can be a sketch. Next could be a wireframe if it is a web project

c)

The project details of how, why, and when that define the project

d)

Needed when there is a change to the project scope. They need to be requested and receive an approval or denial

e)

The order that feedback is given on specific parts of a project

36.

Timeline

a)

The estimated time it will take to complete a project

b)

Knowledge of a subject and areas to focus on in that subject

c)

Individual parts of the project that need to be completed

d)

Materials, staff, or other items that will add value to the project

e)

Limitations to the project schedule

37.

Breadth and depth

a)

The estimated time it will take to complete a project

b)

Knowledge of a subject and areas to focus on in that subject

c)

Individual parts of the project that need to be completed

d)

Materials, staff, or other items that will add value to the project

e)

Limitations to the project schedule

38.

Task

a)

The estimated time it will take to complete a project

b)

Knowledge of a subject and areas to focus on in that subject

c)

Individual parts of the project that need to be completed

d)

Materials, staff, or other items that will add value to the project

e)

Limitations to the project schedule

39.

Resources

a)

The estimated time it will take to complete a project

b)

Knowledge of a subject and areas to focus on in that subject

c)

Individual parts of the project that need to be completed

d)

Materials, staff, or other items that will add value to the project

e)

Limitations to the project schedule

40.

Constraints

a)

The estimated time it will take to complete a project

b)

Knowledge of a subject and areas to focus on in that subject

c)

Individual parts of the project that need to be completed

d)

Materials, staff, or other items that will add value to the project

e)

Limitations to the project schedule

41.

Due date

a)

The date a specific milestone and complete project must be completed

b)

The estimated cost to complete a project

c)

Any person or company with an interest in the project

42.

Budget

a)

The date a specific milestone and complete project must be completed

b)

The estimated cost to complete a project

c)

Any person or company with an interest in the project

43.

Stakeholder

a)

The date a specific milestone and complete project must be completed

b)

The estimated cost to complete a project

c)

Any person or company with an interest in the project

44.

Copyright

a)

Gives the creator of a work exclusive rights for use and distribution

b)

Materials may be used with limits if the rightsholder will not lose money

c)

Inventions and trade secrets controlled completely by the owner of the work

d)

Works that have a copyright‐protected element from another work within the new creation

e)

A contracted person that creates works that will be owned by the person that is stipulated in the contract

45.

Fair use doctrine

a)

Gives the creator of a work exclusive rights for use and distribution

b)

Materials may be used with limits if the rightsholder will not lose money

c)

Inventions and trade secrets controlled completely by the owner of the work

d)

Works that have a copyright‐protected element from another work within the new creation

e)

A contracted person that creates works that will be owned by the person that is stipulated in the contract

46.

Intellectual property

a)

Gives the creator of a work exclusive rights for use and distribution

b)

Materials may be used with limits if the rightsholder will not lose money

c)

Inventions and trade secrets controlled completely by the owner of the work

d)

Works that have a copyright‐protected element from another work within the new creation

e)

A contracted person that creates works that will be owned by the person that is stipulated in the contract

47.

Derivative works

a)

Gives the creator of a work exclusive rights for use and distribution

b)

Materials may be used with limits if the rightsholder will not lose money

c)

Inventions and trade secrets controlled completely by the owner of the work

d)

Works that have a copyright‐protected element from another work within the new creation

e)

A contracted person that creates works that will be owned by the person that is stipulated in the contract

48.

Work for hire

a)

Gives the creator of a work exclusive rights for use and distribution

b)

Materials may be used with limits if the rightsholder will not lose money

c)

Inventions and trade secrets controlled completely by the owner of the work

d)

Works that have a copyright‐protected element from another work within the new creation

e)

A contracted person that creates works that will be owned by the person that is stipulated in the contract