COMPUTER APPLICATION LAB - TEST

Total questions: 25

Worksheet time: 12mins

Name
Class
Date
1.

Full form of STAAD?

a)

structure Analysis Application Drafting software

b)

Structural Application and Design software

c)

Structural Analysis and Design software

d)

Structural Analysis and Application Design software

2.

Which one is not a design software used in civil field?

a)

Autodesk Auto CAD

b)

RISA

c)

SAP 2000

d)

Microstation

3.

Which of the following IS code is used fur concrete mix design?

a)

IS 800:2000

b)

IS 456:2000

c)

IS 10262:2009

d)

IS 1893:1996

4.

Compressive strength of concrete is the strength of concrete cubes at ................ days

a)

14 days

b)

28 days

c)

41 days

d)

52 days

5.

M 10 grade concrete means ..............

a)

Compressive strength of 10 N/mm2 at 14 days

b)

Compressive strength of 10 N/mm2 at 28 days

c)

Compressive strength of 10 N/mm2 at 41 days

d)

Compressive strength of 10 N/mm2 at 52 days

6.

........... is defined as the algebraic sum of all vertical forces either to the left or to the right hand side of a section.

a)

Axial force

b)

Shear force

c)

Tension force

d)

Applied force

7.

A beam having fixed support at one end and a vertical support at free end is termed as ............

a)

Fixed beam

b)

Cantilever beam

c)

Overhanging bean

d)

Propped cantilever beam

8.

If the end portion of a beam is extended beyond the support, such beam is known as ............

a)

Fixed beam

b)

Cantilever beam

c)

Overhanging bean

d)

Simply supporyted beam

9.

What is the bending moment at end supports of a simply supported beam?

a)

Maximum

b)

Minimum

c)

Zero

d)

Uniform

10.

Sagging, the bending moment occurs at ......... of the beam?

a)

At support

b)

Mid span

c)

Point of contraflexure

d)

Point of emergence

11.

Shear force at the free end of a cantilever beam of length 3 m carrying a point load of 10 kN at free end?

a)

0 kN

b)

10 kN

c)

30 kN

d)

15 kN

12.

Maximum value of shear force in a cantilever beam of length 3 m carrying a point load of 10 kN at free end?

a)

0 kN

b)

10 kN

c)

30 kN

d)

15 kN

13.

Maximum value of bending moment in a cantilever beam of length 3 m carrying a point load of 10 kN at free end?

a)

0 kNm

b)

10 kNm

c)

30 kNm

d)

15 kNm

14.

Maximum value of bending moment in the beam of length 8 m carrying loads as shown in figure?

a)

80 kNm

b)

60 kNm

c)

40 kNm

d)

20 kNm

15.

Maximum value of shear force in the beam of length 8 m carrying loads as shown in figure?

a)

80 kN

b)

60 kN

c)

40 kN

d)

20 kN

16.

Hogging moment is present at the internal supports of a continuous beam. State whether true or false?

a)

True

b)

False

17.

What is the maximum bending moment at midspan?

a)

2.5 kNm

b)

5 kNm

c)

7.5 kNm

d)

10 kNm

18.

What is the maximum shear force in the beam?

a)

2.5 kN

b)

5 kN

c)

7.5 kN

d)

10 kN

19.

What is the full form of PERT?

a)

Programme Evaluation and Rate Technique

b)

Programme Evaluation and Robo Technique

c)

Project Evaluation and Rate Technique

d)

Project Evaluation and Review Technique

20.

The amount of time by which an activity can be postponed without affecting the early start dates of a successor activity.

a)

Free float

b)

Total float

c)

Independent float

d)

Half float

21.

Difference between the maximum time available and the actual time needed to perform an activity is known as ...........

a)

Free float

b)

Total float

c)

Independent float

d)

Half float

22.

...... are used to represent activity in a network diagram?

a)

Circle

b)

Square

c)

Rectangle

d)

Arrows

23.

The full form of CPM is ..............

a)

Critical Plan Management

b)

Control Path Method

c)

Critical Path Method

d)

Critical Path Management

24.

A network diagram in which, arrows represent activities and nodes represent events or milestones is ...............

a)

AON network diagram

b)

AOA network diagram

c)

ACWP network diagram

d)

APF diagram

25.

An activity which does not consume any resource and time is called ..............

a)

Critical activity

b)

Dummy activity

c)

Event

d)

Program