wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

SOLAR MOD. 7: CHARGE CONTROLLERS

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

What device decides when to stop charging the battery

bank?

a)

Inverter

b)

Charge controller

c)

Micro-inverters

d)

Transformer

2.

What device decides when to disconnect the battery bank

from the loads?

a)

Charge controller

b)

Sunny Boy inverter

c)

AC-DC disconnect

d)

Solar pathfinder

3.

What piece of equipment protects the batteries from being overcharged or undercharged by the array?

a)

Inverter

b)

Transfer switch

c)

Charge controller

d)

None of the above

4.

What is “autonomy”?

a)

The concept of electric autos powering the economy with solar.

b)

The capacity to make an informed, un-coerced decision.

c)

Another name for a self-driving car.

d)

How long a battery system will provide the necessary power before needing to be recharged.

5.

What type of controller is needed if you have a stand-alone PV system and a wind-turbine?

a)

Hybrid

b)

Non-synchronous

c)

Asynchronous

d)

Series charging

6.

Setpoints are used if you have different types of batteries than what a controller is preset for.

What are “setpoints”?

a)

Points that are set in order

b)

The desired or target value for an essential variable, or process value of a system.

c)

Internal adjustments on a charge controller

d)

None of the above

7.

A self-regulating PV system does not need a charge

controller.

Why not?

a)

It's a system that has less than 24 batteries.

b)

It self regulates without the need for a charge controller.

c)

It's a system that has 500 watts or less.

d)

All of the above

8.

What happens if a charge controller is far from a battery bank and no compensation is made?

a)

Nothing

b)

The batteries could explode.

c)

The batteries could under-charge.

d)

The batteries could over-charge.

9.

If a battery bank is in a colder or hotter location than the controller, what effect does this have?

a)

Batteries could over or under charge

b)

Batteries could freeze or boil over

c)

The solar array would not provide sufficient power to charge.

d)

Nothing happens

10.

A certain charge controller says it does MPPT.

What is that?

a)

Multi-preset power testing

b)

Maximum power point tracking on an inverter.

c)

Maximum panel power test

d)

Maximum power point tracking on a solar panel.