WorksheetsBonus Task (Ch10)
Total questions: 7
Worksheet time: 5mins
The conventional B-C ratio and modified B-C ratio are two same B-C ratios?
True
False
F0 = −25, 000, F1 = · · · = F4 = 8, 000, and F5 = 13, 000. Suppose that the MARR is 20%. Then, the present worth (PW) is?
$934.29
$758.76
$943.92
$879.65
The magnitude of the B-C ratio will differ between conventional and modified ratios?
True
False
Two mutually exclusive alternatives public - works projects are under consideration . their respective costs and benefits are included in the table that follows .project A has an anticipated life of (35) years and the useful life of project B has been estimated to be (25) years .if the MARR is (9%) per year if either of these projects should be selected ?
Project A is acceptable
Project B is acceptable
Determine the B/C ratio for the following project.
First Cost P100, 000
Project life, years 5
Salvage value P10, 000
Annual benefits P60, 000
Annual O and M P22, 000
Interest rate, % 15
1.18
1.61
1.16
1.23
EFG ltd is working upon the renovation of its factory in the upcoming year, and for they expect an outflow of $50,000 immediately, and they expect the benefits out of the same for $25,000 for the next three years. The inflation rate that is currently prevailing is 3%. what is the BCR?
1.14
2.43
1.67
1.41
Disbenefits is the positive consequences to the public resulting from the implementation of public sector project
True
False