WorksheetsQ2: Mechanical Drafting (Week 1 - 3)
Total questions: 10
Worksheet time: 5mins
It is a drawing instrument used when making horizontal lines.
Triangle
T - Square
Erasing Shield
Triangular Scale
It refers to a tool that is made up of metal with irregular holes that is used to protect the rest of the drawing when clearing up smudges.
Erasing Shield
Eraser
Drawing paper
Masking tape
This drawing instrument is used when drawing arcs and circles.
Compass
Divider
Eraser
Erasing Shield
It is a drawing instrument used when transferring measurements, dividing lines and arcs into the desired number of equal parts.
Compass
Divider
Eraser
Erasing Shield
It is a drawing instrument used to determine gradations of the degrees when measuring arcs, angles, and circles.
T - Square
Triangle
Triangular scale
Protractor
It refers to a form that shows proof or receipt of goods or services.
Delivery Receipt Form
Official Receipt Form
Purchase Requisition Form
Requisition Slip Form
It contains information about the items that any business purchases for sale.
Borrower's slip form
Inventory Form
Purchase Requisition Form
Requisition Slip Form
The acronym UOM that is found in a requisition slip and purchase requisition slip form stands for ______________
Unit of Measurement
Universal Original Measurement
Unit of Modification
Union of Measurement
How many inches are there in 2 feet?
12 inches
24 inches
36 inches
48 inches
The protractor is divided in how many equal degrees?
90 degrees
120 degrees
180 degrees
360 degrees
