1.
Integration bugs occur when the interfaces are integrated in between the assumed tested components
a)
True
b)
False
2.

When do we say that a test case has passed?

a)

When the test case executes without any error.

b)

When the test case executes and an output is produced.

c)

When the test case executes and output produced matches the expected output.

d)

When the test case executes and output produced can be traced to a requirement.

3.

The order in which test levels are performed is:

a)

Unit, Integration, Acceptance, System

b)

Unit, System, Integration, Acceptance

c)

Unit, Integration, System, Acceptance

4.

Beta Testing is done at:

a)

Developer’s end

b)

User’s end

c)

User’s & Developer’s end

5.

Testing need to performed at each level of Software development life cycle

a)

True

b)

False

6.
Testing a solution occurs only when the problem has been solved.
a)
True
b)
False
7.
Test data is not necessary until you have solved the problem.
a)
True
b)
False
8.

What are the various Testing Levels?

a)

Unit Testing

b)

System Testing

c)

Integration Testing

d)

All of the mentioned

9.

Unit testing is done by

a)

Users

b)

Developers

c)

Customers

d)

None of the mentioned

10.

Effective testing will reduce _______ cost.

a)

maintenance

b)

design

c)

coding

d)

documentation

11.

A Type of Functional Testing, which investigates the functions relating to the detection of threats, such as viruses from malicious outsiders.

a)

Security Testing

b)

Recovery Testing

c)

Performance Testing

d)

Functionality Testing

12.

When an expected result is not specified in test case template then ___________.

a)

We cannot run the test.

b)

It may be difficult to repeat the test.

c)

It may be difficult to determine if the test has passed or failed.

d)

We cannot automate the user inputs.

13.

White-Box Testing is also known as ________ .

a)

Structural testing

b)

Code-Based Testing

c)

Clear box testing

d)

All of the above

14.

User Acceptance testing is

a)

White box testing

b)

Black box testing

c)

Gray box testing

d)

None of the above

15.

The individual components are tested under

a)

Integration testing

b)

Unit Testing

c)

System testing

d)

Component Testing

16.

________ verifies that all elements mesh properly and overall functions/performance is achieved.

a)

System testing

b)

functional testing

c)

performance testing

d)

overall testing

17.

____________ testing is conducted at the developer site by small set of employees of the client

a)

Beta

b)

Alpha

c)

Gamma

d)

smoke

18.

_____________ testing performed when customer software is delivered to the customer under control

a)

validation

b)

Acceptance

c)

Verification

d)

Delivery

19.

Which granularity level of testing checks the behavior of module cooperation?

a)

Unit Testing

b)

Integration Testing

c)

System testing

d)

Acceptance testing