Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

What does the term 'Jamb' refer too?

a)

The top of the opening

b)

The bottom of the opening

c)

The vertical face of an opening

2.

A temporary frame should be a different size to the actual permanent frame that will be fitted at a later date

a)

True

b)

False

3.

When placing in window formers the frame should be what?

a)

level, plumb & secure

b)

level

c)

just get it in and secure

d)

level & secure

4.

What is a cavity closer?

a)

You don't need to close cavities

b)

A form of insulation with a PVC profile

c)

Wood baton

d)

Plastic baton

5.

Should you have vertical DPC when returning blockwork to close the cavity

a)

Yes

b)

No

6.

When placing vertical DPC for a cavity closer, what is the minimum size it should be?

a)

200mm

b)

50mm

c)

150mm

d)

220mm

7.

Modern lintels that are used on cavity builds are typically made of what?

a)

Wood

b)

Concrete

c)

Steel

d)

Stone

8.

What is the job of a drip on a window cill?

a)

To prevent water from entering the structure

b)

So water doesn't enter the window when you open it

c)

Damp doesn't effect the look of the builds finish

d)

Just to look good

9.

What documentation do we use too determine the location of our openings on our build?

a)

Drawing

b)

Specification

c)

Risk assessment

d)

COSHH guidelines

10.

When lifting our frames what technique do we use to ensure safe practice?

a)

Kinetic

b)

Drag & Pull

c)

Twist

d)

Pull