What does the term 'Jamb' refer too?
The top of the opening
The bottom of the opening
The vertical face of an opening
A temporary frame should be a different size to the actual permanent frame that will be fitted at a later date
True
False
When placing in window formers the frame should be what?
level, plumb & secure
level
just get it in and secure
level & secure
What is a cavity closer?
You don't need to close cavities
A form of insulation with a PVC profile
Wood baton
Plastic baton
Should you have vertical DPC when returning blockwork to close the cavity
Yes
No
When placing vertical DPC for a cavity closer, what is the minimum size it should be?
200mm
50mm
150mm
220mm
Modern lintels that are used on cavity builds are typically made of what?
Wood
Concrete
Steel
Stone
What is the job of a drip on a window cill?
To prevent water from entering the structure
So water doesn't enter the window when you open it
Damp doesn't effect the look of the builds finish
Just to look good
What documentation do we use too determine the location of our openings on our build?
Drawing
Specification
Risk assessment
COSHH guidelines
When lifting our frames what technique do we use to ensure safe practice?
Kinetic
Drag & Pull
Twist
Pull