Worksheets

Overseeing 7

Total questions: 20

Worksheet time: 40mins

Name
Class
Date
1.

The information provided throughout the project must be clear, concise and:

a)

electronic

b)

manufacturers instructions

c)

accurate

d)

written

2.

PPE should only be used where:

a)

it is convenient to do so

b)

The HSE specifies it

c)

there is no other alternative

d)

it makes the job quicker

3.

Requests to carry out additional work on site are notified by a:

a)

job sheet

b)

purchase order

c)

variation order

d)

time sheet

4.

The information provided to the client must include the requirements for:

a)

design and installation

b)

installation and control

c)

maintenance and design

d)

operation and maintenance

5.

The deliveries of materials to a busy site must be:

a)

ad-hoc

b)

early in the morning

c)

during break periods

d)

coordinated

6.

A PIR detector is used to sense

a)

movement

b)

light

c)

temperature rise

d)

temperature fall

7.

The details of how to set up the limit switches on water storage vessel will be found in the manufactures:

a)

brochure

b)

catalogue

c)

Instructions

d)

specification

8.

To confirm the health and safety requirements on site continue to be met it is necessary to carry out regular site inspections. These inspections would not include:

a)

hand tools

b)

work areas

c)

access routes

d)

working platforms

9.

The person or organisation which employs your company to carry out the work is the:

a)

designer

b)

contractor

c)

architect

d)

client

10.

A drawing at a scale of 1:200 shows a cable length of 150 mm, the actual length of the cable on site will be:

a)

50 m

b)

15 m

c)

30 m

d)

45 m

11.

The preferred electrical supply for hand tools on a construction site is:

a)

extra low voltage

b)

reduced low voltage

c)

high voltage

d)

low voltage

12.

Details of the progress and any delays on site will normally be discussed by regular:

a)

emails

b)

site meetings

c)

site memos

d)

telephone calls

13.

The electrical installation certificate for an installation should be kept for the lifetime of the electrical installation. This should be kept by the:

a)

consultant

b)

architect

c)

client

d)

electrical contractor

14.

The length of the installed underground cable supplying a detached garage some distance from a house is to be measured. The most appropriate tool to use for this task is a:

a)

scale rule

b)

3 m steel tape

c)

laser measure

d)

measuring wheel

15.

Method statements for everyday activities are often included in the:

a)

manufacturers information

b)

electricians employment contract

c)

company health and safety manual

d)

project specification

16.

Before any new work on site begins it is important to carry out a:

a)

method statement

b)

risk assessment

c)

contract review

d)

cost assessment

17.

On completion of an electrical installation one item of information to be provided to the client would be:

a)

the layout drawings

b)

a set of wiring diagrams

c)

the electrical installation certificate

d)

the specification

18.

The figure above is a:

a)

wiring diagram

b)

circuit diagram

c)

layout drawing

d)

block diagram

19.

A main contractor has engaged an electrical contractor to carry out the electrical installation on a project. The relationship of the electrical contractor to the main contractor is as a:

a)

management contractor

b)

sub contractor

c)

employee

d)

consultant

20.

Before an operative or visitor is allowed onto the site they may need to undergo:

a)

a medical

b)

induction training

c)

a hearing test

d)

a risk assessment