wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

RA 9266 and SPP 205-209

Total questions: 30

Worksheet time: 15mins

Name
Class
Date
1.

The new Architect’s Credo was released thru PRBArch Resolution No. ____ Series of ______.

a)

Resolution No. 5; Series of 2016

b)

Resolution No.12; Series of 2016

c)

Resolution No.5; Series of 2018

d)

Resolution No.12; Series of 2018

2.

When was the Architects Credo published in the Official Gazette?

a)

June 5, 2018

b)

June 5, 2016

c)

August 23, 2018

d)

August 23, 2016

3.

When was the Architect's Credo been deemed effective?

a)

June 21, 2018

b)

June 21, 2016

c)

September 7, 2018

d)

September 7, 2016

4.

The Architecture Act of ______ was signed into law on ______________.

a)

2006; May 16, 2006

b)

2004; May 16, 2004

c)

2006; March 17, 2006

d)

2004; March 17, 2004

5.

What Section of RA 9266 requires the existence of the SPP Documents?

a)

Section 27

b)

Section 32

c)

Section 33

d)

Section 41

6.

What do you call a group or firm hired by the Owner, with the Architect’s recommendation, to perform Full-time Supervision Services?

a)

Contractor Supervisory Group

b)

Contractor Supervision Group

c)

Construction Supervisory Group

d)

Construction Supervision Group

7.

Which of the following is not part of the job of the group mentioned in the previous item?

a)

Deciding on alternative materials & techniques applied on site

b)

Ensuring that the construction is according to the plans & specifications.

c)

Filing necessary and pertinent documents regarding the proceedings of construction.

d)

Constantly and regularly inspecting all components of the building throughout the entire construction phase.

8.

Does the group mentioned in the previous two items have any civil liability to the project?

a)

No. They are just considered as additional manpower on site.

b)

No. They did not take part in the plans and designs.

c)

Yes. As long as they have proper contracts with the Contractor.

d)

Yes. They are on site and they should be responsible.

9.

Which of the following is not part of the responsibilities of a Construction Manager?

a)

Coordinate with the CSG to assure construction is up to plans & specifications.

b)

Manage the time and the finances relating to the proceedings of construction.

c)

Making changes in the specifications should problems arise.

d)

Managing the manpower on site.

10.

Which of the following is not an example of a Post-Construction Service an Architect can render?

a)

Implementing rules & methods on the proper use of a building.

b)

Marketing & Advertising to achieve maximum profit.

c)

Innovates best use schemes for the building to achieve maximum profit.

d)

Imposing due billings to tenants and users of the building.

11.

Which Architect cannot practice Design-Build Services?

a)

Architect A who is a PCAB-accredited contractor.

b)

Architect B who is a member of a duly accredited contracting firm.

c)

Architect C who is not a contractor but is the Architect of Record.

d)

Architect D who is a partner in a firm with Architect E which is a licensed contractor.

12.

If an Architect engages on a project with a Client under a Design-Build on a Guaranteed Maximum Cost, what happens if the actual cost exceeds the guaranteed cost?

a)

The Client pays for the cost if the excess is not more than 10% of the guaranteed cost.

b)

The Architect pays for the cost if the excess is not more than 10% of the guaranteed cost.

c)

The Architect pays for the excess cost if the cost is above 10% the guaranteed cost even if it exceeds his Administration Fee.

d)

The Client pays for the cost if it is above 10% of the guaranteed cost but voids the RPF of the Architect.

13.

How many representatives of the Owner can be part of a Jury of an Architectural Design Competition?

a)

1

b)

2

c)

3

d)

4

14.

In a two-stage Architectural Design Competition, a different set of Jurors can be assembled for each of the two-stages.

a)

True

b)

False

c)

It depends on the specialization of the jurors

15.

If the winning entry in an Architectural Design Competition is to be pursued, who holds the Intellectual Property Rights to the design?

a)

Client

b)

Technical Advisor

c)

IAPOA

d)

Winning Designer

16.

The fee of the Foreign PCA should be equal or on par with the fee of the Filipino PCA.

a)

True

b)

False

17.

What UAP Committee took charge in drafting UAP Document 301?

a)

Professional Practice & Ethics

b)

Professional Protection & Promulgation

c)

Professional Standards

d)

Professional Integrity & Aptitude

18.

Which of the following is not part of the “General Conditions” under Doc.31?

a)

Owner’s Rights & Responsibilities

b)

Protection of Work & Property

c)

Labor Provisions

d)

Owner-Architect Agreement Contract

19.

Who was the Chairman of the committee of Professional Practice and Ethics at the time of its fruition of Doc 301?

a)

Norberto M. Nuke, FUAP

b)

Felipe M. Mendoza, FUAP

c)

Froilan L. Hong, FUAP

d)

Cesar V. Canchela, FUAP

20.

Which of the following is not part of the “Contract” as defined by UAP Doc 301?

a)

General Conditions

b)

Drawings

c)

Site Instructions

d)

Special Provisions

21.

What is defined by UAP Doc 301 as to “Purchase and/or fabricate and deliver to the jobsite or other location when so designated”?

a)

Install

b)

Furnish

c)

Provide

d)

Direct

22.

During an emergency on site, does the Contractor have jurisdiction over the Architect and the Owner on the decision making on the proceedings at the time of the emergency?

a)

Yes. As long as he informs the Architect and the Owner duly of the actions to undertake.

b)

Yes. It is an emergency and he is there on site.

c)

No. The Architect has jurisdiction over proceedings of the site at all times.

d)

No. The Owner has jurisdiction over proceedings of the site at all times.

23.

How much should be the Performance Bond that the Contractor needs to furnish for the faithful performance of his work?

a)

5%

b)

10%

c)

15%

d)

20%

24.

How much should be the Payment Bond that the Contractor also needs to furnish to cover payments and obligations arising from his Contract?

a)

5%

b)

10%

c)

15%

d)

20%

25.

How many days does the Owner have to provide payments for the Contractor, without interests, after the Architect has submitted a Payment Request?

a)

7 days

b)

15 days

c)

10 days

d)

90 days

26.

Which of the following is not necessarily stipulated in the Owner-Architect Agreement?

a)

Consultation Fees & Schedules

b)

Interest Rate of Late Payments

c)

Ownership of Documents

d)

Design and Placement of Signs

27.

Which is filed every April 15?

a)

Professional Tax Receipt

b)

Income Tax Return

c)

IAPOA

d)

PRC Renewal

28.

Business permits usually expire in the month of ____________.

a)

December

b)

January

c)

April

d)

September

29.

Which section of RA 9266 states that a program of continuing professional development shall be maintained?

a)

Section 8

b)

Section 18

c)

Section 28

d)

Section 38

30.

In 2004, an act to institutionalize the use of an Alternative Dispute Resolution in the country took effect. Under this law, Construction Disputes will now go to Arbitration/ Mediation instead of the regular courts. What is this Law?

a)

RA 9285

b)

RA 9858

c)

RA 9262

d)

RA 9255