Total questions: 10
Worksheet time: 2mins
a task at the lowest level of the WBS
work breakdown structure (WBS)
work bakage
WBS dictionary
Joint Application Design (JAD)
a deliverable-oriented grouping of the work involved in a project that defines the total scope of the project
work breakdown structure (WBS)
work bakage
WBS dictionary
Joint Application Design (JAD)
a document that describes detailed information about each WBS item
work breakdown structure (WBS)
work bakage
WBS dictionary
Joint Application Design (JAD)
the difference between planned and actual performance
work breakdown structure (WBS)
work bakage
requirement
Variance
a plan that describes how project requirements will be analyzed, documented, and managed
project scope management
requirements management plan
a condition or capability that must be met or possessed by a system, product, service, result, or component to satisfy a contract, standard, specification, or other formal document
WBS
work bakage
requirement
creating a WBS by using a similar project's WBS as a starting point
bottom-up approach
analogy approach
mind-map approch
the processes involved in defining and controlling what work is or is not included in a project
project scope management
requirements management plan
the processes involved in defining and controlling what work is or is not included in a project
project scope management
requirements management plan
creating a WBS by having team members identify as many specific tasks related to the project as possible and then grouping them into higher level categories
bottom-up approach
analogy approach
mind-map approch