Scope Management

Total questions: 10

Worksheet time: 2mins

Name
Class
Date
1.

a task at the lowest level of the WBS

a)

work breakdown structure (WBS)

b)

work bakage

c)

WBS dictionary

d)

Joint Application Design (JAD)

2.

a deliverable-oriented grouping of the work involved in a project that defines the total scope of the project

a)

work breakdown structure (WBS)

b)

work bakage

c)

WBS dictionary

d)

Joint Application Design (JAD)

3.

a document that describes detailed information about each WBS item

a)

work breakdown structure (WBS)

b)

work bakage

c)

WBS dictionary

d)

Joint Application Design (JAD)

4.

the difference between planned and actual performance

a)

work breakdown structure (WBS)

b)

work bakage

c)

requirement

d)

Variance

5.

a plan that describes how project requirements will be analyzed, documented, and managed

a)

project scope management

b)

requirements management plan

6.

a condition or capability that must be met or possessed by a system, product, service, result, or component to satisfy a contract, standard, specification, or other formal document

a)

WBS

b)

work bakage

c)

requirement

7.

creating a WBS by using a similar project's WBS as a starting point

a)

bottom-up approach

b)

analogy approach

c)

mind-map approch

8.

the processes involved in defining and controlling what work is or is not included in a project

a)

project scope management

b)

requirements management plan

9.

the processes involved in defining and controlling what work is or is not included in a project

a)

project scope management

b)

requirements management plan

10.

creating a WBS by having team members identify as many specific tasks related to the project as possible and then grouping them into higher level categories

a)

bottom-up approach

b)

analogy approach

c)

mind-map approch