All of the following are site work activities EXCEPT.
Backfill
Drainage
Grading
Painting
1. Which site work is the process of moving earth rock or other materials with tools, equipment or explosives?
Excavation
Grading
Drainage
Backfilling
The underground chamber made of concrete, fiberglass, or plastic through which domestic wastewater flows for basic treatment is a _____________________.
Landscaping
Septic Tank
Drainage
Sewer System
Which site work is a technique used by excavation professionals to adjust the slope of an area prior to building construction?
Excavation
Backfilling
Strip Site
Grading
Site work is _____________________________.
This aspect of the site work has to do with the architect and surveyor lazing on with each other to design the plans for the proposed dwelling.
The enabling work which prepares the site for construction.
Identifying, sizing, and placing temporary facilities within the boundaries of construction site.
The preliminary soil work of getting a construction site ready for building and development.
The image shown above is the representation of a _________________.
Survey Report
Site Work Layout
Floor Plan
Drawwing
Architects and surveyors lazing on with each other to design the plans for the proposed dwelling is called a __________________.
Site Work Layout
Planning and coordination
Site Work
Project Planning
The planning, laying out and construction of gardens that enhance the appearance and create useable space for outdoor activities around a home is called ____________________.
Landscaping
Drainage
Site Work Layout
Sewer System
The image above represents a ______________.
Backfilling
Drainage
Septic Tank
Sewer System
The technique used to adjust the slope of an area prior to building construction is called a/an ________________.
Backfilling
Excavation
Grading
Landscaping