AR 429B - QUIZ MT 01

Total questions: 25

Worksheet time: 26mins

Name
Class
Date
1.

Refers to the range of professional services that covers Pre-design Services, Regular Design Services,

Specialized Architectural Services, Construction Services and Post Construction Services.

a)

Comprehensive Architectural Services

b)

Complex Architectural Services

c)

Comprehensive Design Services

d)

Complex Design Services

2.

In Comprehensive Architectural Services, the Architect is not expected to perform all the services.

a)

True

b)

False

c)

Maybe

d)

Neither True or False

3.

Involves management activities over and above

the normal architectural and engineering (A&E) services carried out during

the pre-design, design and construction phase.

a)

Post-Project Management

b)

Construction Management

c)

Project Management

d)

Comprehensive Management

4.

The presence of a PM does relieve the designers and contractors of their respective normal duties and responsibilities in the design and construction of

the project.

a)

False

b)

True

c)

Maybe

d)

Neither True or False

5.

His primary responsibility is the exercise of

overall cost control. He will plan, program and monitor the various activities, and will act as an adviser on material costs and construction methods.

a)

Owner

b)

Architect

c)

Contractor

d)

Project Manager

e)

Consultant

6.

Normally, the Architect enters into a contract with the Owner to perform comprehensive architectural services. By the very nature of the services, he assumes the either the role of the Project Manager (PM) or the Construction

Manager (CM), or effectively the overall coordinator whose functions are outlined under this SPP.

a)

False

b)

True

c)

Maybe

d)

Neither True or False

7.

An architect may organize a team team of consultants in Comprehensive Design Services consisting of the following professionals EXCEPT:

a)

Accountants

b)

Sociologists

c)

Bankers

d)

Lawyers

e)

Psychologists

8.

If a Project Manager (PM) is hired by the Owner, it may be the responsibility of the PM to either hire the Construction Manager (CM) to be paid either by

him or directly by the Owner on salary, or on the basis of percentage of construction cost or to serve as the CM himself.

a)

True

b)

False

c)

Maybe

d)

Neither True or False

9.

If the Architect as Project Manager (PM) performs regular design services for the same project, he shall be compensated separately for these services as

stipulated in SPP Document 202.

a)

True

b)

False

c)

Maybe

d)

Neither True nor False

10.

In Design-Build Services, the architect assumes the professional responsibility only for both the design and the construction of the project.

a)

True

b)

False

c)

Maybe

d)

Neither True nor False

11.

Under Design-Build by Administration, The following are scope of work under construction phase EXCEPT:

a)

Preparation of schedule of work, program and estimates of

materials, labor, transportation, equipment and services as

reference for the construction.

b)

Procurement of materials, plants and equipment, licenses and

permits

c)

Keeping records and books of accounts

d)

Preparation of Walkthrough and Animation

12.

In this type of Service, Owner/ Client is provided a guaranteed maximum project construction cost for the construction of the project.

a)

Design-Build Services with Guaranteed Maximum Project Construction Cost

b)

Design-Build Services by Administration

c)

Design-Build Services

13.

In the Design-Build Services with Guaranteed Maximum Project Construction

Cost , the Owner/ Client is given an estimate of the project, and upon completion, if there is realized savings from the estimated project construction cost; it is divided between the Owner/ Client (70%) and

the Architect (30%).

a)

False

b)

True

c)

Maybe

d)

Neither True nor False

14.

Under Design-Build Services with Guaranteed Maximum Project Construction Cost, the project construction cost is guaranteed by the Architect not to exceed ____ Percent of the estimated project construction cost.

a)

10%

b)

5%

c)

15%

d)

20%

15.

In the Design-Build Services with Guaranteed Maximum Project Construction Cost, should the actual cost exceed the estimated project construction cost plus Ten Percent (10%), the Architect shall be liable for the excess

amount but only up to the amount of his administration Fee.

a)

True

b)

False

c)

Maybe

d)

neither True nor False

16.

In the Design-Build Services with Guaranteed Maximum Project Construction Cost, should there be additional expenditures beyond the guaranteed maximum project construction cost which are due to legitimate change/variation orders (CVOs), extra work orders (EWOs), substantial escalation of prices of the costs of materials or labor as evidenced by data certified by a nationally recognized agency such as the National Economic Development Authority (NEDA), or to other

causes not attributable to the fault of the Architect, the additional costs shall be borne by the _____________ .

a)

Owner/ Client

b)

Architect

c)

Contractor

d)

Project Manager

17.

All registered architects can engage in design build services provided they passed the architecture board exam.

a)

True

b)

False

c)

Maybe

d)

Neither True nor False

18.

In the Design build Services, the architect can be the one to provide the initial capital for the construction of the project

a)

False

b)

True

c)

Maybe

d)

Neither true nor false

19.

Cost of all permits, licenses and other incidentals to the work are paid by the ________.

a)

Owner/ Client

b)

Architect

c)

Contractor

d)

Consultant

20.

All Architects who passed the Architecture Board Exams can engage in Professional Consulting Services

a)

True

b)

False

c)

Maybe

d)

Neither True nor False

21.

Refers to the holistic and progressive growth and advancement of a community, province, region and nation inclusive of their respective economic, social, physical, environmental and institutional sectors.

a)

Comprehensive Development

b)

Comprehensive Planning

c)

National Development

d)

National Development Planning

22.

Refers to a coalition of purely Filipino professional consultants (i.e. RLA-PCAs) or consulting firm/s (i.e. SEC- and/or PRC-registered architectural firms/ RAFs); or Filipino professional consultants (i.e. RLA-PCAs) or consulting firm/s (i.e. RAFs) in collaboration with foreign professional consultant/s and/or foreign consulting firm/s authorized to render consulting/ consultancy

services

a)

Consortium or Association

b)

APO

c)

PIA

d)

PRC

23.

Refers to a Filipino citizen, a natural person who possesses the qualifications of a Filipino Professional Consultant (FPC) as hereafter defined; the FPCA must be a Philippine-registered and licensed architect (RLA) and must be a member in good standing of the IAPoA

a)

Filipino Professional Consulting Architect (FPCA)

b)

Foreign Professional Consulting Architect (FPCA)

c)

Professional Consulting Architect

d)

Consulting Architect

24.

A Foreign Consultant can provide his services provided he has acquired necessary documents under the following government offices EXCEPT:

a)

PRC

b)

DTI

c)

DOLE

d)

BID

25.

Professional consulting architect (PCA) belongs as a member in good standing. This means that (Choose the Best Answer):

a)

He has paid his dues with the IAPOA

b)

His PRC id is up to date

c)

He attends monthly general membership meetings with his chapter

d)

He has been paying his tax consistently