Consist of 2.5kg and 4.5 kg ABC Dry type. These are provided for the Electrical Switch Room, Plant Rooms and tenant spaces.

a)

LPG Tank

b)

Fire Extinguisher

c)

Central Plant System

d)

Air Conditioning System

2.

1 unit of ‘Volvo Penta’ 300kVA which was configured to supply to the main panel in the event of supply breakout. During power failure, this set will kick in and supply to essential usage such as electricity to common corridor and fire fighting equipments.

a)

LPG System

b)

Main Switchboard

c)

Generator Set

d)

Fire Extinguisher

3.

The filtration process should go on for 8 hours every day and the pumps are switched “ON” and “OFF” automatically.

a)

Swimming Pool System

b)

Sanitary Plumbing System

c)

Air Conditioning System

d)

Fire Alarm System

4.

Currently, they are 4 DVR with 64 cameras, out of 6 cameras already down. Recommend replacing new cables and cameras to improve the security and surveillance in the building.

a)

Public Address System

b)

Lightning and Earthing System

c)

CCTV System

d)

Fire Alarm System

5.

There is outdoor RC tank and two pumps located at the Basement Level to serve the buildings. They are installed in riser at every floor with appropriate signages to indicate the drum sets location.

a)

Water Supply System

b)

Fire Piping System

c)

Sanitary Plumbing System

d)

Building Transportation System

6.

There is one RC suction tank located at Basement Level and with a set of vertical in line transfer pumps to pump up to roof storage FRP tanks. The roof storage tanks to serve floor below via a set of hydro pneumatic booster pump.

a)

Air Conditioning System

b)

Swimming Pool System

c)

Water Supply System

d)

Fire Alarm System

7.

During the site survey, it is found that most of the copper tapes are concealed inside the wall or column. However, all the finials were missing from the roof which is supposed to be connected down to the copper conductor.

a)

Telecommunication System

b)

Central Plant System

c)

Fire Alarm System

d)

Lightning and Earthing System

8.

11 numbers of 50kg manifold cylinders is located behind the kitchen. Emergency shut off valve is provided for emergency shut off.

a)

Central Plant System

b)

Fire Extinguisher

c)

LPG System

d)

Fire Alarm System

9.

Condenser pumps and chilled water pumps are located at Basement chiller plant room whereas the cooling towers are located at the roof. The chilled water is supplying to 3 nos of AHUs and 197 FCU units during normal school operating hours.

a)

Central Plant System

b)

Split Unit System

c)

Fire Piping System

d)

Water Supply System

10.

This is a one-way communication system. Announcement can be made throughout the whole building from the remote paging microphone

a)

Fire Intercom

b)

CCTV System

c)

Public Address System

d)

Fire Alarm System

11.

The MDF consists of 300 pairs of incoming terminals and 100 pairs of in/out going terminal from PABX which is still in operation at the time of inspection. The MDF room located at the GF. There is new fiber optic solution was pulled for the server rack.

a)

Building Transportation System

b)

Fire Alarm System

c)

Public Address System

d)

Telecommunication System

12.

This supply consists of 3 live wire (red, yellow, blue), 1 neutral wire (black), 1 earth wire (green-yellow), suitable for heavy duty appliances such as lift, gondola, etc.)

a)

CCTV System

b)

415V supply

c)

One-phase supply

d)

240V supply

13.

The system is linked to nearest Bomba station via Computerized Monitoring and Communication System (CMS). However, there is no Fire Certificate renewal applied since last 2 years.

a)

Fire Extinguisher

b)

Fire Alarm System

c)

Fire Piping System

d)

Fire Break Glass

14.

There are 150mmØ & 100mmØ UPVC main soil and waste pipe connected from all the stacks at Basement high level and channel out to the Inspection Chambers and finally connected to manhole at the ground floor.

a)

Sanitary Plumbing System

b)

Water Supply System

c)

Lightning and Earthing System

d)

Swimming Pool System

15.

This equipment assist in the movement of large number of people horizontally or with very limited inclines. They are commonly installed in airport.

a)

Lift

b)

Elevators

c)

Travellators

d)

Paternoster

16.

This system uses variable refrigerant flow control to provide customers with the ability to maintain individual zone control in each room and floor of a building.

a)

Fire Alarm System

b)

Building Transportation System

c)

Water Supply System

d)

Air Conditioning System

17.

This system provides two-way communications for use during emergencies. The remote handsets are located in Lift motor room, plant rooms and every level in Fire lift lobby.

a)

Fire Alarm System

b)

Public Address System

c)

CCTV System

d)

Fire Piping System

18.

Hoisting ropes have been replaced during recent monthly maintenance done by Schindler. The PMA certificate has been renewed from JKKP valid until 20 January 2022

a)

Escalator

b)

Lift

c)

Travellator

d)

Platform Lift

19.

Full view of the premise and real-time recording as well as remote online access by the building manager lowers the risk and prevents costly incidents such as burglary, fire, vandalism, etc.

a)

CCTV System

b)

Fire Alarm System

c)

Public Address System

d)

Telecommunication System

20.

The property is supplied by single HT 11kV incoming feeder to HT outgoing feeder 11kV HT Consumer Switchgear and step down by 2 sets of transformers before distributed to the building via network of cabling, tap off unit, SSB and DB system to the building.

a)

Central Plant System

b)

Telecommunication System

c)

Fire Alarm System

d)

Electricity Supply System