Machine Availability & Reliability

Total questions: 20

Worksheet time: 5hrs 0mins

Name
Class
Date
1.

Which of the following is NOT part of the 4 new tasks that Autonomous Maintenance practice introduces to the Operation?

a)

Apply new analysis tools

b)

Support to develop new equipment

c)

Educate and train operators

d)

Develop know-how to become a specialist

e)

Learn how to operate the machine

2.

There are 7 types of Abnormalities as above list. From the options below, choose the abnormality that is missing.

a)

Source of cleaning

b)

Source of contamination

c)

Source of breakdown

d)

Source of Abnormality

e)

Source of Repair

3.

Which of the following is NOT an objective from carrying out cleaning/ inspection when implementing AM?

a)

Prevent forced deterioration

b)

Expose hidden abnormalities

c)

Trace sources of dirt, dust, etc.

d)

Detect abnormalities

e)

Identify machine lifespan

4.

From the list below select the reaction that is most likely NOT caused when a machine incurs problems :

a)

Overtime

b)

Fire Fighting

c)

Progress chasers

d)

Flexibility

e)

Additional Shifts

5.

Autonomous Maintenance is applied to identify 2 types of deterioration, Natural Deterioration & Forced Deterioration. From the list below, select the reason that DO NOT contribute to Forced Deterioration :

a)

Design Weakness

b)

Corrosion

c)

Environment

d)

Failure to maintain basic conditions

e)

Conditions of use not needed

6.

Choose the best sentence to define changeover time?

a)

The time from running the last product to the time of running the current product

b)

The time between the machine was functional to the time the machine breakdown

c)

The time from running qualified product at the standard rate of the last batch to running qualified product at the standard rate of the next batch

d)

The time from running the machine when operation start to the time when the machine is switched off upon completion of the operation

e)

The time between startup of the operation until the time the operations ends for the day

7.

Which of the following are Tools used for improving the changeover process?

a)

Spaghetti Diagram

b)

Action Log

c)

Changeover Checklist

d)

Video camera and stopwatch

e)

All of above

8.

Which is the following is one of the key QCO step?

a)

5S

b)

Visual Management

c)

Autonomous Maintenance

d)

OEE

e)

Optimize internal & external activities

9.

From the list below, select 2 benefits of implementing Quick Change Over (QCO)?

a)

Increases production time

b)

Improves 5S

c)

Detects abnormality

d)

Increases flexibility

e)

Improves safety

10.

Which of the following is NOT a benefit from improving OEE?

a)

Greater system availability

b)

Reduced cycle time

c)

Reduced number of workers

d)

Reduced cost of operation

e)

Reduced inventories

11.

Machine Availability = 99%

Machine Performance = 98%

Quality = 95%

Operation Cost = 92%

RFT = 99%


Calculate the OEE for the above operation :

a)

92%

b)

85%

c)

89%

d)

96%

e)

86%

12.

OEE is a method to measure the efficiency of the equipment in an operation. From the below, select a situation where OEE is not recommended :

a)

OEE is a tool to analyze, and improve your production process

b)

OEE measures inefficiencies and groups them to aid with analyzing the machine

c)

OEE data focuses on factors that adversely affect the value of a machine.

d)

The OEE rate is the maximum potential which a machine can produce set in proportion to the actual value-added time

e)

OEE should be measured on a brand-new equipment to determine the return of investment on this equipment

13.

Select from list below the missing step in Reliability Based Maintenance implementation process according to the order showed above :

a)

Autonomous Maintenance

b)

Improves 5S

c)

Define Asset Criticality

d)

Measure OEE

e)

Improves Quality

14.

Based on the Maintenance Strategy chart provided, which is the correct Maintenance strategy in the blue column?

a)

High Risk – Corrective Action

b)

High Risk – Preventive Maintenance

c)

Low Risk – Preventive Maintenance

d)

Moderate Risk – Predictive Maintenance

e)

Moderate Risk – Corrective Maintenance

15.

In the right sequence, list down the 3 types of Maintenance Strategy defined in RBM?

a)

Corrective, Preventive, Predictive

b)

Preventive, Predictive, Corrective

c)

Predictive, Preventive, Corrective

d)

Corrective, Predictive, Preventive

e)

Correction, Prevention, Prediction

16.

Which of the following defines Risk?

a)

Risk equals the result of the consequence multiplied by the probability the event will occur

b)

Risk equals the result of the availability multiplied by the probability the event will occur

c)

Risk equals the result of the occurrence multiplied by the probability the event will occur

d)

Risk equals the result of the consequence multiplied by the accuracy the event will occur

e)

Risk equals the result of the consequence multiplied by the repeatability the event will occur

17.

Investments are defined into 2 categories. List the missing type of Investment :


1. ___________________________

2. Offensive Investment

a)

Defensive Investment

b)

Investment Decision

c)

Defenseless Investment

d)

Defective Investment

e)

Investment Opportunity

18.

Project A - Decision to be taken within the limits of total investment

Project B - Immediate decisions to be taken, realization in short term & within budget

Project C - Immediate actions to stop a critical situation


For the projects listed above, prioritize the projects in the category of High, Medium and Low risk :

a)

A, B, C

b)

C, B, A

c)

A, C, B

d)

B, C, A

e)

C, A, B

19.

Which of the following if NOT a benefit of carrying out Risk Based Project Selection?

a)

Site Investment Evaluation

b)

Risk Evaluation

c)

Fit to Business Strategy

d)

Fit to Operations and Footprint strategy

e)

Cost avoidance

20.

Choose from the list below, the basic requirement before implementing Reliability Based Maintenance?

a)

5S

b)

Equipment Master List

c)

Visual Management

d)

Autonomous Maintenance

e)

OEE