Industrial Security Semi-Finals

Total questions: 40

Worksheet time: 40mins

Name
Class
Date
1.

What is the field of management focusing on risk reduction and analysis using different methods and techniques of risk prevention?

a)

risk management

b)

risk reduction

c)

risk mitigation

d)

risk control

2.

What is the purpose of risk management?

a)

to avoid problem

b)

to avoid problem and negative phenomena

c)

to avoid negative phenomena

d)

to avoid problem accidents

3.

Select which is not a basic principles of risk management.

a)

There are no such thing as zero risk

b)

Small organization the responsibility for risk is at the level of executive

c)

Responsibility for risk management in organization is distributed throughout the management

d)

risk is always present in all business

4.

What is the type of security briefing that is conducted as may deemed necessary. As when there are special occasion or incidents?

a)

Special briefing

b)

Orientation briefing

c)

National security briefing

d)

Special access briefing

5.

Which of the following is not a situations in which a security survey may be requested?

a)

activation of an organization or office

b)

reactivation of organization or office

c)

indication of laxity in the security program

d)

When record exists of a prior survey conducted

6.

Who is directly responsible to the head of office for proper maintenance of security program of the office?

a)

security officer

b)

security administrative

c)

security police

d)

security inspector

7.

What is the self inspection accomplished immediately prior to the action to administratively terminate an authorized top secret control station.

a)

closeout

b)

checklist

c)

data sheet

d)

close in

8.

What are the Stages of security inspection?

a)

evaluation

b)

Compliance

c)

Follow-up

d)

all of the above

9.

What is an asset?

a)

real or personal property

b)

ownership

c)

are intangible wealth

d)

are both wealth and land

10.

What is the cost, lost of damage beyond the market value of the asset?

a)

asset

b)

consequential

c)

cost

d)

benefits

11.

What is the process of planning the decision to commit funds or asset accrue from a particular expenditure.

a)

asset

b)

cost/benefits analysis

c)

consequential

d)

risk analysis

12.

If there is something happens such as security incident, alarm, medical emergency?

a)

phenomena

b)

event

c)

program

d)

project

13.

What is the value of business that has been built up through reputation

a)

good will

b)

reputation

c)

business plan

d)

trust

14.

What is the event bringing great damage, loss or destruction such as hurricane, earthquake?

a)

probability

b)

natural disaster

c)

calamity

d)

typhoon

15.

What is the certainty that a given event will occur to the total number of possible outcomes?

a)

Probability

b)

Natural Disaster

c)

Loss event

d)

Qualitative

16.

It is based on the amount or number of something expressed numerically.

a)

Quantitative

b)

Qualitative

c)

Evaluation

d)

Inspection

17.

What is the detailed examination including risk assessment, risk evaluation , and risk management?

a)

Risk- possibility

b)

Risk analysis

c)

Probability

d)

Risk Assessment

18.

What is the process of assessing security related risk from internal and external threats to an entity?

a)

Risk Assessment

b)

Security Incident

c)

Risk analysis-

d)

Risk- possibility

19.

What is the security related occurrence or action that is likely to lead to death. Injury or monetary loss?

a)

Security Incident

b)

Risk Assessment

c)

Risk analysis

d)

Security Vulnerability

20.

It is an exploitable capability or security weakness.

a)

Risk analysis

b)

Security Incident

c)

Risk Assessment

d)

Security Vulnerability

21.

It is the intent of damage or injury an indication of something impending.

a)

Security Vulnerability

b)

Site

c)

State of the Art

d)

Threat

22.

What is the process of listing potential risk and their characteristics?

a)

Risk Identification

b)

Risk Assessment

c)

Risk analysis

d)

Risk- possibility

23.

What is a face to face interaction between project managers and team?

a)

Team participation

b)

Repetition

c)

Risk

d)

Team work

24.

What is the risk assessment tool that helps develop mitigation program for high risk areas?

a)

Project definition rating index

b)

Program index

c)

program matrix

d)

project proposal

25.

Select which is not a Types of security risk.

a)

personal security

b)

physical security

c)

information security

d)

asset security

26.

Which of the following is a Risk Identification Tool Techniques?

a)

documentation and review

b)

information gap

c)

security gap

d)

personal documentation

27.

What are the categories used to come up with the additional risk for the project?

a)

checklist analysis

b)

swot analysis

c)

risk analysis

d)

Assumption analysis

28.

What is the dentification of the different assumptions of the project and determining its validity?

a)

SWOT analysis

b)

project analysis

c)

assumption analysis

d)

risk register

29.

What is the living document that is updated regularly throughout the life cycle of the project?

a)

Risk register

b)

inspection report

c)

assumption analysis

d)

check list analysis

30.

What is the process of identifying assessing and implementing security control in application

a)

security risk assessment

b)

security report analysis

c)

security risk report

d)

security plan

31.

Negative media coverage. •Long term consumer perception , additional public relation cost, Lack of insurance coverage and Higher wages needed to attract employees are all identified as.

a)

Indirect cost

b)

direct cost

c)

duty cost

d)

taxable cost

32.

It helps in identifying risk which require an immediate response.

a)

data analysis matrix

b)

probability impact matrix

c)

security analysis

d)

risk data quality assessment

33.

It is the identifying ways to eliminate risk.

a)

risk reduction

b)

risk management

c)

risk mitigation

d)

risk control

34.

What is the logical process used to determine likelihood of adverse event impacting an asset?

a)

Threat assessment-

b)

Vulnerability Assessment

c)

Crime Prevention

d)

•Risk management plan

35.

It consist of performing the contingency plan to emerging risk and must be properly documented in the project plan.

a)

Corrective action

b)

Risk plan

c)

Risk control

d)

risk management

36.

What is the information gained through the risk management processes are collected and kept for use by the future projects, includes plan, matrix and risk register.

a)

organizational process asset update

b)

management plan

c)

organizational plan

d)

security plan

37.

What is the project risk review at all team meetings and major review at major milestone, the risk rating and prioritization?

a)

Risk assessment

b)

Risk reassessment

c)

risk management

d)

risk takers

38.

What is the examination and documentation of the effectiveness of the risk response planning in controlling risk response planning?

a)

risk assessment

b)

risk audit

c)

risk reduction

d)

risk planning

39.

What is the purpose of security survey?

a)

Used by the senior facility manager to determine the type of extent of security control for the facility

b)

used to effect that partial or total loss of the mission.

c)

used to the susceptibility of a facility or area to damage or destruction of the possible theft or loss of property.

d)

use to conducted before constructing, leasing, acquiring, modifying or occupying a facility or area

40.

What is the color indicator of Extreme- cell is mark with “E” ?

a)

pink

b)

blue

c)

red

d)

orange