Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

OREDE-P RGTP Unit 62 : Flare System

Total questions: 7

Worksheet time: 4mins

Name
Class
Date
1.

The function of the Flare and Relief System is provided to handle BOG pressure and releases from Pressure Safety Valves (PSVs)?

a)

True

b)

False

2.

What system and equipment in RGTP are producing BOG? (You may choose more than one answer)

a)

BOG Compressor

b)

BOG Recondenser

c)

Electro Chlorination Unit

d)

HP LNG pumps Vent Pots

3.

List two inlets connected to the Flare K.O Drum.

a)

BOG Header

b)

HP Drain Header

c)

Flare Header

d)

LP Drain Header

4.

What is the temperature setting for LP KO Drum Heater (F-6201) start and stop?

a)

Start -155 ºC and Stop -50 ºC

b)

Start -150 ºC and Stop -45 ºC

c)

Start -140 ºC and Stop -40 ºC

d)

Start -155 ºC and Stop -45 ºC

5.

1. What is design capacity for LP Flare Stack?

a)

60 ton/hr

b)

70 ton/hr

c)

80 ton/hr

d)

90 ton/hr

6.

Why we must maintain positive sweep gas of flare header?

a)

To ensure no hydrocarbon in Flare System

b)

To prevent air ingress to Flare System

c)

To ensure pilot flame not light off

d)

To prevent LNG from carryover

7.

Flare header is purged by Fuel Gas as primary purge gas and Nitrogen as backup purge gas

a)

True

b)

False