Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Irish Rail Incidents

Total questions: 21

Worksheet time: 11mins

Name
Class
Date
1.

CTC in an acronym for

a)

Central Train Control

b)

City Train Centre

c)

Connolly Train Control

2.

ERCC should contact CTC when

a)

Immediately

b)

Before turning out DFB resources

c)

On request of OIC

d)

CTC will contact DFB

3.

IE is an acronym for

a)

Irish Rail/Iarnrod Eireann

b)

Incident Efficiency

c)

Incident Electricity Control

4.

The minimum PDA for all Irish Rail incidents is

a)

3 Appliances, 1 ET, 1 Ambulance, 2 DOs

b)

3 Appliances, 1 ET, 1 Ambulance, 1 DO

c)

3 Appliances, 1 ET, 2 DO's

d)

4 Appliances, 1 ET, 1 Ambulance, 1 DOs

5.

The DOs travel to the incident and where else

a)

CTC

b)

ERCC

c)

Incident

d)

Only 1 DO is on the PDA

6.

The role of the DO at CTC is

a)

Command Support

b)

Incident commander

c)

Observer

7.

When all train traffic is stopped, this is known as

a)

Wheels Free Zone

b)

Safe Line

c)

Closed Road

d)

Nightmare

8.

When the DO arrives to the CTC, he/she must introduce themselves to the duty manager and confirm that:

a)

Site is protected

b)

Zone is clear

c)

Safe Road

d)

DFB in charge

9.

When asking for all traffic to stop, an IC should be mindful of

a)

the impact of not bringing trains to platform

b)

environmental impacts of idling trains

c)

cost

d)

trespass on the line

10.

The DO in the CTC should pass on any information to the IC via

a)

Radio or Mobile

b)

By runner

c)

Through the ERCC

d)

Via IE's communications systems

11.

The IC DO should ideally be the DO:

a)

from the district which the incident has occurred

b)

from another district

12.

The IC DO should establish communications with

a)

DO in CTC

b)

ERCC

c)

TO

13.

The IC DO should mark off a ** ** and ensure nobody enters without consent.

a)

Danger Zone

b)

Working Zone

c)

Inner Cordon

d)

Outer Cordon

14.

The IC should

a)

confirm rail traffic has been halted in both directions

b)

assume rail traffic has been halted in both directions

c)

send up-rail and down-rail spotters to halt rail traffic

15.

The the IE incident officer arrives the IC should

a)

Handover control of the incident

b)

consult with them

c)

ask them to control rail traffic

d)

keep them outside the danger zone

16.

The IC should ensure safe access and egress especially in ** track area

a)

segregated

b)

raised

c)

tunnel

d)

bridge

17.

A ** should be set up as appropriate

a)

Casualty Holding Area

b)

Marshalling Area

c)

Safe Zone

d)

Mass Casualty Incident

18.

The CTC is located in

a)

Connolly

b)

Tara Street

c)

Hueston

d)

Drumcondra

19.

When DFB are preparing to leave scene they should handover to

a)

Gardai

b)

Irish Rail

c)

Railway Crash Investigators

d)

the local authority

20.

The DO at the CTC should

a)

only request power off on request from the ERCC or IC

b)

automatically request power off

c)

form a DRA before making a decision on power shut down

21.

Overhead lines must be earthed

a)

False

b)

True