WorksheetsQuality
Total questions: 10
Worksheet time: 5mins
We must _____________ the temperature of the cold room.
revise
optimize
control
check
To compare the number of defects over the last ten years, we should use a _____________ chart.
Pareto
bar
pie
cake
We try to ____________ faulty products before they are sent to our customers.
control
detect
define
maximize
The idea to ____________ faulty products in the first place.
protect
prevent
clasify
chek
Making sure that materials are stored correctly is part of ______________ control.
control
process
inventory
demand
I'm sending our technician who wiII ___________ the faulty motor.
fabric
remake
repair
damage
We have problems with the electronic equipment due to power _____________.
errors
failures
mistake
wrong
This process is very inefficient because of the quantity of _________ left over.
scrap
evidence
things
error
We must ____________ the things we need to improve.
define
tell
correct
prioritize
Improving the design quality of these bicycles wiII add ___________.
money
variability
value
cost
