NEW
Font size
WorksheetsSOFTWARE ENGINEERING
Total questions: 15
Worksheet time: 8mins
Software is
Superset of programs
Subset of programs
Set of programs
None of the above
What is the first step in the software development life cycle?
System Design
Coding
System Testing
Preliminary Investigation and Analysis
What does the study of an existing system refer to?
Details of DFD
Feasibility Study
System Analysis
System Planning
Which of the following is not included in waterfall model ?
Requirement analysis
Risk analysis
Coding
Design
A Software consists of ______ .
Programs + hardware manuals
Set of instructions + operating procedures
Set of programs
Programs + documentation + operating procedures
A person who writes a program for running the hardware of a computer is called?
System designer
Data processor
Programmer
System analyst
A feasibility study is?
Considers a single solution
Includes a statement of the problem
Both (a) and (b)
None of these
Spiral Model was developed by
Bev Little wood
Berry Boehm
Roger Pressman
Victor Basili
SDLC stands for
Software design life cycle
Software development life cycle
System development life cycle
System design life cycle
If every requirement stated in the Software Requirement Specification (SRS) has only one interpretation, SRS is said to be
Correct.
Unambiguous
Consistent
Verifiable
Which one is the most important feature of spiral model?
Quality management
Risk management
Performance management
Efficiency management
The model in which the requirements are implemented by category is
Evolutionary Development Model
Waterfall Model
Prototyping
Iterative Enhancement Model
Requirements can be refined using
The waterfall model
Prototyping model
The evolutionary model
The spiral model
The analysis phase ____________________
Determines what the program will do
Determines how the program will work
Determines whether or not the program works
Adds new features to the delivered program
Software reliability is defined with respect to
Time
Speed
Quality
None of the above
