WorksheetsBILL OF QUANTITY
Total questions: 10
Worksheet time: 20mins
Bill of Quantity (BOQ) is known as ____.
A document or piece of legislation setting out the rights or entitlements of a particular group or class of people.
An extensive list of raw materials, components, and instructions required to construct, manufacture, or repair a product or service
A document used in tendering in the construction industry in which materials, parts, and labor (and their costs) are itemized.
Bill of Quantity is often prepared by _____.
Client
Sub-Contractor
Quantity Surveyor
Cost Consultant
Which of the following is the purpose of preparing a Bill of Quantity for a construction company?
To provide a clear and precise method to value each project
To delay the tendering process and analysis
To enable the consultants to analyze prices of various individual items and overall costs
To identify the quality standard status of a materials
The Bill of quantities is a means of a communication tool between several parties involved in any construction project which are _____.
Client
Manufacturer
Consultant
Contractor
Which of the following is TRUE about variation order?
A variation order is a change, often in construction, that modifies all or part of an existing order
A variation order means an alteration to the scope of Services in the form of an addition, substitution or omission as instructed by the Client
A variation order entitles a creditor to receive a payment from a debtor in circumstances specified in a contract between them.
What is an Interim Payment?
Interim payment is a payment instrument that contains monetary value that has been paid in advance by the client.
Interim payment is a progress payments during contract period.
Interim payment is payment that includes a deposit followed by a final payment.
Interim payment is where payments could be due at every 10% of the project’s completion.
Which of the following items should be included in Bill of Quantity (BOQ)?
Item/Particular
Quantity
Rate
Price per unit
Which of the following is the importance of preparing Bill of Quantity in any construction project?
It provides the quantities to the Contractors with respect to which the Contractors can bid.
It is important to assist Quantity Surveyor (QS) to prepare the design of the project
It serves as the basis for the valuation of the interim payments.
It is also important for the preparation of the final bill amount.
Which of the following is the disadvantages of Bill of Quantity?
Bill of Quantity may mislead the contractor in case of the Quantity Surveyor or Cost Consultant is inexperienced.
Bill of Quantity do not help in the project management as it provides unnecessary data for project such as monthly progress reports
Bill of Quantity is difficult to use to calculate the interim variations and payments.
Billl of Quantity do not help in future cost planning and estimation
Which of the following is the example of items/particulars included in a Bill of Quantity?
Brick work
Plaster work
Wood work
Cement work