WorksheetsFINAL YEAR PROJECT QUIZ
Total questions: 10
Worksheet time: 5mins
1. Why do you need to review the existing literature?
Because without it, you could never reach the required word-count.
To find out what is already known about your area of interest.
You enjoy reading the academic research on your topic.
To make sure you have a long list of references.
2. To read the literature critically means:
to suggest the previous research was always poorly conducted.
skimming through the material because most of it is just padding.
evaluating what you read in terms of your own research questions.
being negative about something before you read it.
3. The purpose of the activity flow diagram can be described as:
Draw the activity flow of a system.
Describe the sequence from one activity to another.
Describe the parallel, branched and concurrent flow of the system.
All of the above
4. Use case descriptions consist of __________ interaction.
Use case
product
Actor
Product & Actor
5. What are the stages of the Project Life Cycle?
Initiation, Planning , Execution, Evaluation
Initiation, testing, doing & Evaluating
Analysis, Planning, Execution, Evaluation
None of the above
6. The main usages of activity diagram:
Investigate business requirements at a later stage.
Modeling work flow by using activities.
Modeling business requirements.
High level understanding of the system's functionalities.
All of the above
7. The purpose of the class diagram can be summarized as:
Analysis and design of the static view of an application.
Describe responsibilities of a system.
Base for component and deployment diagrams.
Forward and reverse engineering.
All of the above
8. There is a tendency to think of a project solely in terms of its
Filing
Outcome
Decision making abilities
Inputs
9. Which of the following is not a diagram studied in Requirement Analysis ?
Use Cases
Entity Relationship Diagram
Activity Diagram
State Transition Diagram
10. Assembling project team and assigning their responsibilities are done during which phase of a project management?
Initiation
Planning
Execution
Closure
