1.

What is the weight of the iron ball has volume of 250 cc and density 7.5gm/cc

a)

1750 gram

b)

1875gram

c)

1975gram

d)

1785gram

2.

What is the relative permittivity of rubber?

a)

Between 2 and 3

b)

Between 5 and 6

c)

Between 8 and 10

d)

Between 12 and 14

3.

What percentage of water absorbed by a good building stone ?

a)

Less than 10%

b)

Less than 20%

c)

Less than 8%

d)

Less than 5%

4.

Which specification is other than general specification ?

a)

Brief specification

b)

Bulk specification

c)

Detailed specification

d)

Main specification

5.

What cables are used for 132KV lines ?

a)

High tension

b)

Super tension

c)

Extra high tension

d)

Extra super voltage

6.

Which of the impurity in cast iron makes it hard and brittle ?

a)

Silicon

b)

Sulphur

c)

Manganese

d)

Phosphorous

7.

What describes the detailed specifications for the item of work ?

a)

Quality, quantity,workmanship, method of execution

b)

Colour

c)

Tax ,,transport overhead expenses

d)

Maintenance, stock, cost

8.

Which IE rules are to be verified on completion of wiring on any new installation ?

a)

IE rules 1956

b)

IE rules 1960

c)

IE rules 1961

d)

IE rules 1967

9.

Which one is the most reliable estimate ?

a)

Preliminary estimate

b)

Plinth area estimate

c)

Cube rate estimate

d)

Detailed estimate

10.

What is the minimum permissible area of conductors (U/G cable) for 3 and half cores cable ?

a)

25 sq.mm

b)

50 sq.mm

c)

5 sq.mm

d)

100 sq.mm

11.

What is the minimum permissible size of aluminium wire used in estimation ?

a)

1.5 sq.mm

b)

2.5 sq.mm

c)

5 sq.mm

d)

3.5 sq.mm

12.

Which one is included in machining estimation sheet ?

a)

Transport cost

b)

Advertisement cost

c)

Raw material cost

d)

Tax

13.

who prepares the cost of estimation ?

a)

Operator

b)

Quality inspector

c)

Estimator

d)

Draftsman

14.

It is related to estimation of work ?

a)

Bill of material

b)

Packing

c)

Information table

d)

Handbook

15.

What is a total cost ?

a)

Raw material cost only

b)

Machining cost only

c)

Raw material cost and machining cost

d)

Advertisement costs only

16.

What is the other term used for reference table ?

a)

Dictionary

b)

Biography

c)

Bibliography

d)

Information table

17.

Which handbook referred by machine engineer ?

a)

Parry's cheorikal

b)

CRC

c)

Mark standard

d)

Oxford dictionary

18.

What is a handbook ?

a)

Model book of various works

b)

Type of reference work or other collection of instruction

c)

Design book of latest works

d)

Dictionary of materials

19.

Which standard schedule of rates to be considered for estimation ?

a)

Standard schedule of rates of the last year

b)

Standard schedule of rates of the average of the last 10 years

c)

Standard schedule of rates of the average of last 5 years

d)

Standard schedule of rates of the current year

20.

What is an over estimate ?

a)

When an estimate is exceeded to actual estimate

b)

When an estimate is fell short of the actual estimate

c)

When an estimate perfectly matches the actual estimate

d)

No work started as per estimate

21.

What is a under estimate ?

a)

No work started as per estimate

b)

An estimate perfectly matches with actual estimate

c)

An estimate is fell short of the actual estimate

d)

An estimate is exceeded the actual estimate

22.

What is the term used for the method of calculating various quantities and expenditure on a particular job or process ?

a)

Estimation

b)

Drawing

c)

Specification

d)

Plan

23.

What is the main factor to be considered while preparing a detailed estimate ?

a)

Shape of material

b)

Brand of the materials

c)

Quantity, availability and transportation of materials

d)

Location of material

24.

Which authority publishers schedule of rates ?

a)

Individual

b)

Corporate

c)

Partnership firm

d)

Government department

25.

What is the name of a booklet, the rates of various terms are indicated ?

a)

Price bank

b)

Price bunch

c)

Price tag

d)

Price catalogue