wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

SIA W6

Total questions: 9

Worksheet time: 5mins

Name
Class
Date
1.

The production cycle information system integrates both operational and financial data

from many sources.

a)

True

b)

False

2.

Who is responsible for Product Design activities?

a)

Research and Development Department

b)

Production Planning and Inventory Control Department

c)

Production Department

d)

Purchasing Department

3.

Who is responsible for Planning and Scheduling activities?

a)

Research and Development Department

b)

Production Planning and Inventory Control Department

c)

Production Department

d)

Sales and Shipping Department

4.

Document specifies the part number, description, and quantity of each component used in a finished product.

a)

Bill of materials

b)

Operations list

c)

Material requisitions

d)

Production order

5.

Document to authorize the manufacture of a specified quantity of a particular product.

a)

Production order

b)

Master production schedule

c)

Operations list

d)

Materials requisition

6.

Document to authorize the removal of the necessary quantity of raw materials from the storeroom to the factory location where they will be used

a)

Materials requisition

b)

Shipping notice

c)

Production order

d)

Bill of lading

7.

A document which specifies the sequence of steps to follow in making the product, which equipment to use, and how long each step should take

a)

Operations list

b)

Production order

c)

Master production schedule

d)

Sequence of service

8.

The production cycle is a recurring set of business activities and related data processing operations associated with the manufacture of products. What is its third step?

a)

Product design

b)

Planning and scheduling

c)

Production operations

d)

Cost accounting

9.

Which control procedure would be most effective in reducing the risk of over- or under-production?

a)

Reviewing all changes to master data

b)

Activity-based costing

c)

Production planning systems

d)

Computer-integrated manufacturing

e)

Reports that highlight the components of throughput