Site Work Operation

Total questions: 20

Worksheet time: 11mins

Name
Class
Date
1.

What are 3 factors that can affect the choice of site for an individual?

a)

Location

b)

Roads

c)

Topograph

d)

Cost

e)

Size of family

2.

Which of the following is NOT a type of building design document?

a)

Bill of Quantities (BQ)

b)

Floor Plans

c)

Details

d)

Electrical and Drainage Plan

3.

What is a Building Design Documentation?

a)

is a set of rules which governs the site.

b)

is a set of documents which are necessary for the building and use of a construction work.

c)

is a set of documents which are necessary for the calculation of a building.

d)

is a set of papers which are necessary for completing a building undergoing construction.

4.

Construction Documents are the detailed working drawings and project manual containing detailed specifications.

a)

True

b)

False

5.

Who is a Contractor?

a)

is an individual who is responsible for delivering the project.

b)

is a person who lay concrete blocks on the site.

c)

is a person who design buildings.

d)

is an individual who is responsible for the day-to-day oversight of a construction site.

6.

All the following are the responsibilities of a contractor EXCEPT.

a)

Furnishing Project Needs

b)

Project Planning

c)

Controlling Time Management

d)

Project Monitoring and Management

7.

The contractor is responsible for the

supervision and superintendence of all the

work on a project site.

Which responsibility of a contractor is this?

a)

Legal and Regulatory Responsibilities

b)

Furnishing Project Needs

c)

Health, Safety and Protection

d)

Project Planning

8.

All of the following are site work activities EXCEPT.

a)

Backfill

b)

Drainage

c)

Grading

d)

Painting

9.

The underground chamber made of concrete, fiberglass, or plastic through which domestic wastewater flows for basic treatment is a _____________________.

a)

Landscaping

b)

Septic Tank

c)

Drainage

d)

Sewer System

10.

The image above represents a ______________.

a)

Backfilling

b)

Drainage

c)

Septic Tank

d)

Sewer System

11.

The technique used to adjust the slope of an area prior to building construction is called a/an ________________.

a)

Backfilling

b)

Excavation

c)

Grading

d)

Landscaping

12.

Define Site Clearance......

a)

The demolition of walls, hedges, ditches and trees, other vegetation and services from the site.

b)

The removal of walls, hedges, ditches and trees, other vegetation and services from the site.

c)

The destruction of walls, hedges, ditches and trees, other vegetation and services from the site.

d)

The falttening of walls, hedges, ditches and trees, other vegetation and services from the site.

13.

A process whereby the surfaces of the earth is excavated and transported to and compacted at another location can be define as process of.........

a)

Site Clearance

b)

Excavation

c)

Removing Hedges

d)

Earthworks

14.

Which of the following would you consider when choosing a site

a)

The price of the land

b)

The closeness to various geographical features

c)

The owner of the land

d)

The type of soil on the site

15.

It consists of the removal and disposal of all bushes, trees, fences and loose boulders as well as the grass within the top soil

a)

Erosion

b)

Site clearance

c)

Excavation

d)

Bulldozing

16.

It is normally the first operation to be done when the alignment has been set out. What is it?

a)

Reconnaissance

b)

Survey

c)

Field study

d)

Site clearance

17.

Which is a factor that affects the location of materials on site?

a)

Closeness to site offices

b)

Traffic flow in town

c)

Location in relation to plant

d)

The emotions of the site manager

18.

Site security prevents the following except

a)

loss of goods and materials on site

b)

Delay in payment of salaries

c)

Injury to children and other pedestrians

d)

Vandalism

19.

Suggest 1 equipment needed to clear/strip the site.

a)

Excavator

b)

Shovel

c)

Truck

d)

Fork

20.

Suggest 1 tool needed to clear/strip the site.

a)

Excavator

b)

Fork

c)

Tractor

d)

Hack saw