WorksheetsSite Work Operation
Total questions: 20
Worksheet time: 11mins
What are 3 factors that can affect the choice of site for an individual?
Location
Roads
Topograph
Cost
Size of family
Which of the following is NOT a type of building design document?
Bill of Quantities (BQ)
Floor Plans
Details
Electrical and Drainage Plan
What is a Building Design Documentation?
is a set of rules which governs the site.
is a set of documents which are necessary for the building and use of a construction work.
is a set of documents which are necessary for the calculation of a building.
is a set of papers which are necessary for completing a building undergoing construction.
Construction Documents are the detailed working drawings and project manual containing detailed specifications.
True
False
Who is a Contractor?
is an individual who is responsible for delivering the project.
is a person who lay concrete blocks on the site.
is a person who design buildings.
is an individual who is responsible for the day-to-day oversight of a construction site.
All the following are the responsibilities of a contractor EXCEPT.
Furnishing Project Needs
Project Planning
Controlling Time Management
Project Monitoring and Management
The contractor is responsible for the
supervision and superintendence of all the
work on a project site.
Which responsibility of a contractor is this?
Legal and Regulatory Responsibilities
Furnishing Project Needs
Health, Safety and Protection
Project Planning
All of the following are site work activities EXCEPT.
Backfill
Drainage
Grading
Painting
The underground chamber made of concrete, fiberglass, or plastic through which domestic wastewater flows for basic treatment is a _____________________.
Landscaping
Septic Tank
Drainage
Sewer System
The image above represents a ______________.
Backfilling
Drainage
Septic Tank
Sewer System
The technique used to adjust the slope of an area prior to building construction is called a/an ________________.
Backfilling
Excavation
Grading
Landscaping
Define Site Clearance......
The demolition of walls, hedges, ditches and trees, other vegetation and services from the site.
The removal of walls, hedges, ditches and trees, other vegetation and services from the site.
The destruction of walls, hedges, ditches and trees, other vegetation and services from the site.
The falttening of walls, hedges, ditches and trees, other vegetation and services from the site.
A process whereby the surfaces of the earth is excavated and transported to and compacted at another location can be define as process of.........
Site Clearance
Excavation
Removing Hedges
Earthworks
Which of the following would you consider when choosing a site
The price of the land
The closeness to various geographical features
The owner of the land
The type of soil on the site
It consists of the removal and disposal of all bushes, trees, fences and loose boulders as well as the grass within the top soil
Erosion
Site clearance
Excavation
Bulldozing
It is normally the first operation to be done when the alignment has been set out. What is it?
Reconnaissance
Survey
Field study
Site clearance
Which is a factor that affects the location of materials on site?
Closeness to site offices
Traffic flow in town
Location in relation to plant
The emotions of the site manager
Site security prevents the following except
loss of goods and materials on site
Delay in payment of salaries
Injury to children and other pedestrians
Vandalism
Suggest 1 equipment needed to clear/strip the site.
Excavator
Shovel
Truck
Fork
Suggest 1 tool needed to clear/strip the site.
Excavator
Fork
Tractor
Hack saw