WorksheetsPROFESSIONAL PRACTICE 413
Total questions: 25
Worksheet time: 13mins
Which group classification belongs projects involving extensive detail such furniture design, built –in equipment, special fittings, screens, counters, interiors and other detailed parts of appurtenances of buildings or structures and landscaping designs?
Group 8
Group 2
Group 1
Group 4
a foreign architect practicing architecture in the Philippines for projects on Philippine soil must first secure a ____________ and a work permit from the______________________
Department of Labor and Employment (DOLE) ; Temporary / special permit (TSP)
Temporary / special permit (TSP) ; Department of Labor and Employment (DOLE)
Temporary / special permit (TSP) ; Department of Trade and Industry
Department of Trade and Industry; Temporary / special permit (TSP)
This phase consists of the preparation of schematic design studies derived from the Project Definition Phase, leading to conceptual plans.
Schematic Design Phase
Project Definition Phase
Design Development Phase
Contract Document Phase
Which group classification belongs projects involving alterations, renovations, rehabilitations, retrofit and expansion / additions to existing buildings belonging to Groups 1 to 5
Group 4
Group 6
Group 9
Group 10
A foreign architect practicing architecture in the Philippines for projects on Philippine soil must have a _______________ Architect.
Local Counterpart
Allied Foreign
Allied Proffessional
None of the above
Under the of SCOPE OF SERVICES, the architect prepares the complete Contract Documents consisting of detailed designs and construction drawings, setting forth in detail the work required for the architectural, structural, electrical, plumbing/ sanitary, mechanical, electronic and communication works prepared by the Architect and the respective professionals involved.
Project Definition Phase
Schematic Design Phase
Design Development Phase
Contract Document Phase
Under CONTRACT DOCUMENT PHASE, the architect prepares Technical Specifications describing type and quality of materials, finish, manner of construction and the general conditions under which the project is to be constructed. How many sets of construction drawings should the architect submit to the owner for obtaining a Building Permit?
5
6
7
8
In this phase, the Architect makes periodic visits to the project site to familiarize himself with the general progress and quality of work and to ascertain that the work is proceeding in accordance with the Contract Documents.
Contraction Phase
Design Development Phase
Contract Document Phase
Construction Phase
Under what project classification does buildings of moderate complexity of plan / design falls?
Group 2
Group 3
Group 4
Group 7
Housing Project involving the construction of several residential units on a single site with the use of one (1) set of plans / design, specifications and related documents falls under what type of Project Classification?
Group 2
Group 3
Group 4
Group 7
OWNER’S RESPONSIBILITIES: If the Owner observes or otherwise becomes aware of anything that may impair the successful implementation of the project, he shall give prompt a __________________ to the Architect..
Advice
Tax Receipt
Written notice
Notice to Proceed
Once the Architect has prepared all these documents, the Architect has completed the Detailed Design and Contract Documents Phase of his services, which is equivalent to ___________ of his work.
Ninety percent (90%)
Sixty percent (60%)
Fifty percent (50%)
Eighty percent (80%)
1.2 REGULAR DESIGN SERVICES OF AN ARCHITECT: In regular practice, the Architect acts as the Owner’s/ Client's/ Proponent’s ______ and/or Representative. He translates the Owner's needs and requirements to spaces and forms in the best manner of professional service.
CLIENT
ADVISER
ARCHITECT
ADVISOR
This phase involves the definition of the requirements of the project by the Owner. The Architect in turn informs the Owner of the technical requirements of the project and the concomitant professional fees.
PROJECT DEFINITION PHASE
SCHEMATIC DESIGN PHASE
DESIGN DEFINITION PHASE
CONTRACT DOCUMENT PHASE
On every phase of the design process, the architect should update the ___________ based on changes in scope, requirements or market conditions.
Agreement
SPPCC
Contract
Materials
The Architect does not assume any of the responsibilities and liabilities of the other professionals (RLPs).
True
False
I dont know
Maybe
Monumental buildings and other facilities such as Exposition & Fair Buildings Specialized decorative buildings
Mausoleums, Memorials, Museums
& Monuments Buildings of similar nature or use are classified under what group?
Group 3
Group 4
Group 5
Group 6
All given structures falls under Group 1; Bldgs of the simplest utilization and character which shall include but not be limited to the following: EXCEPT.
Industrial Buildings
Warehouses
Manufacturing Plants
Gymnasiums
7.4 Per Diem and Traveling Expenses: shall be chargeable to the Owner whenever the Architect or his duly authorized representative is required to perform services at a locality beyond ____ kilometers from his office.
100 km
50 km
5 km
10 km
When the suspension of construction exceeds a period of ________, the fee for the remaining works shall be doubled.
six (6) months
seven (7) months
nine (9) months
eight (8) months
If the Owner requires the services of specialist consultants, they shall be engaged with the consent of the Architect. The cost of their services shall be paid for separately by the Owner and shall be deducted from the Architect’s fee.
True
False
I dont know
Maybe
The Architect shall not be required to make exhaustive or continuous 8-hour on-site supervision to check on the quality of the work involved.
True
False
I dont know
Maybe
Who shall prepare change orders, gathers and turns over to the Owner written guarantees required.
Architect
Owner
Contractor
Engineer
What is SPP 203?
Specialized Architectural Services
Full-Time Supervision
Construction Management Services
Post Construction Services
In which scope of regular design services of Architects describing drawing construction such as Mechanical, sanitary, structural plans and Electrical.
Contract document phase
Design development phase
Schematic phase
Contract Document phase