wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

WAMS SOP Workshop

Total questions: 25

Worksheet time: 1hrs 5mins

Name
Class
Date
1.

Asset Criticality Rating (ACR) is assigning asset for criticality ratings based on their potential risk of failure.

a)

True

b)

False

2.

Why we need Asset Criticality Rating (ACR)?

a)

To prioritize assets according to its functions.

b)

To prioritize assets according to regions/departments.

c)

To prioritize assets for a total productive maintenance plan.

3.

In Asset Criticality Rating (ACR) definition, the ‘Rating Option (RO)’ must have how many options?

a)

1 to 7

b)

1 to 6

c)

1 to 5

4.

Asset Criticality Rating (ACR) are numbered from 1 to 9 only as per the requirement from TAMS-WAMS.

a)

True

b)

False

5.

If an asset is a disposable or not repairable type, which column of ‘Cost Category’ should be filled in the Asset Registration Template?

a)

Repair Cost

b)

Purchase Cost

c)

Neither Repair Cost nor Purchase Cost

6.

WAMS SOP document is established to replace which document?

a)

O&M TAMS Phase 2

b)

Strategic Asset Management Plan (SAMP)

c)

Emergency Response Procedure

d)

Procurement Manual

7.

Which of this Asset Lifecycle Management (ALM), interlinked with Guidelines for Inventory Control of Store?

a)

Asset Planning

b)

Asset Monitoring

c)

Asset Registration

d)

Asset Disposal

8.

Asset Disposal SOP has been documented for all capitalize water assets managed by Air Selangor in AMP.


Among listed below, please choose 3 types of asset category not included in the Asset Disposal SOP.

a)

Administration (Lamp, Desk, Cabinet)

b)

IT (Laptop, PC, Mouse)

c)

Fleet

d)

Production Asset (Pump, Motor)

9.

For new user registration, TAMS-WAMS priority access is given to?

a)

Supplier

b)

Vendor

c)

Internal Contractor

d)

Asset Owner

10.

Any complaints on TAMS-WAMS shall be made via...

a)

Air Selangor hotline (15300)

b)

TAMS Helpdesk

c)

PARSEL

d)

Yammer

11.

Below are the steps in Asset Disposal procedure, EXCEPT...

a)

Issue Work Order Disposal

b)

Obtain Netbook Value (NBV) from Finance

c)

Asset Retirement in TAMS-WAMS

d)

Fill in Asset Registration template

12.

Within how many days Work Request must be approved?

a)

1 day

b)

1 month

c)

3 days

d)

1 week

13.

Work Order can be Closed when Work Activity is still Open.

a)

True

b)

False

14.

Work Activity can be Closed when Service History is not completely answered (if Service History is set to YES).

a)

True

b)

False

15.

In Work Priority Guideline, Work Priority 3 indicates Related to Compliance or Acts.

a)

True

b)

False

16.

PM Trigger can be linked to Template Work Order with status Not Active.

a)

True

b)

False

17.

Required information for updating asset status in WAMS.

i. Current location

ii. Effective date

iii. Asset Status (Out of service/ Store)

a)

i and ii

b)

i and iii

c)

All of the above (i,ii,iii)

18.

Please choose the right sequence for process of asset registration in WAMS

i. Fill in asset registration template & sign off form

ii. Submit to Asset Coordinator, Asset Management Section via email

iii. Asset Coordinator to validate the asset registration template

iv. Register asset in WAMS

a)

i,ii,iv,iii

b)

i,ii,iii,iv

c)

iii,i,ii,iv

19.

Related Unit for asset registration is...

a)

Quality, Management and Asset Disposal Unit

b)

Asset Analysis, Monitoring & Improvement Unit

c)

Asset Administrator Unit

d)

Asset Coordinator Unit

20.

Asset can only record operational reading if the asset has a measurement type.

a)

True

b)

False

21.

Planner is given access to change the information of badge number in TAMS-WAMS.

a)

True

b)

False

22.

Source of Custom report template document can be obtained from (Please choose 2)...

a)

BI Publisher

b)

Oracle Analytics Visualization

c)

Field Service Management

d)

Risk Assessment (IMSIRA)

23.

What can we review from asset information template?

a)

Asset description, location and attributes

b)

Asset description, location, work order, Asset condition score

c)

Asset description, location, Asset criticality and asset condition score

d)

Asset description, location, work order, Asset condition score, work activity

24.

We can request custom report template through change request.

a)

True

b)

False

25.

OUAV enable user to customize their own analysis base on their preference.

a)

True

b)

False