wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Topic 6.0 SDLC

Total questions: 70

Worksheet time: 1hrs 10mins

Name
Class
Date
1.
What does SDLC stand for?
a)
Software Development Love Cycle
b)
Software Development Life Cycle
c)
Saturdays Do Live Cautiously
d)
System Dongle Life Cycle
2.

It is the most important stage in SDLC

a)

Deployment

b)

Building

c)

Defining

d)

Planning

3.
Which of these are performed in the Analysis phase?
a)
Approve all project requests.  
b)
Build a prototype. 
c)
Perform a detailed analysis of the old system. 
d)
Review and allocate resources to the project. 
4.
When should users be trained on a new system?
a)
During the Analysis phase. 
b)
During the Implementation phase. 
c)
During the Development phase. 
d)
During the Evaluation phase. 
5.
in Analysis Phase, the main purpose of the Preliminary Investigation (feasibility study) is .....
a)
to determine the exact nature of the problem or improvement and decide whether it is worth pursuing
b)
to determine the users’ wants, needs, and requirements;
c)
to develop all of the details of the new or modified information system
6.
SDLC stands for...
a)
System development life cycle. 
b)
Software development litigation cycle. 
c)
System development life conditions. 
d)
Software development life cycle. 
7.
When should users be trained on a new system?
a)
During the Analysis phase. 
b)
During the Implementation phase. 
c)
During the Development phase. 
d)
During the Evaluation phase. 
8.
Which of these are performed in the Analysis phase?
a)
Approve all project requests.  
b)
Build a prototype. 
c)
Perform a detailed analysis of the old system. 
d)
Review and allocate resources to the project. 
9.
in Analysis Phase, the main purpose of the Preliminary Investigation (feasibility study) is .....
a)
to determine the exact nature of the problem or improvement and decide whether it is worth pursuing
b)
to determine the users’ wants, needs, and requirements;
c)
to develop all of the details of the new or modified information system
10.
(1) Review and Approve the project requests;
(2) Prioritize the project requests;
(3) Allocate resources such as money, people, and equipment to approved projects;
(4) Form a project development team for each approved project.
These activities are found in
a)
Planning Phase
b)
Analysis Phase
c)
Implementation Phase
d)
Operation, Support, and Security Phase
11.
Conducting preliminary investigation is done in which phase?
a)
Planning
b)
Analysis
c)
Design
d)
Implementation
12.
Acquire hardware and software is done in which phase?
a)
Planning
b)
Analysis
c)
Design
d)
Implementation
13.
Developing details of system is done in which phase?
a)
Planning
b)
Analysis
c)
Design
d)
Implementation
14.
Install and test new system is done in which phase?
a)
Planning
b)
Analysis
c)
Design
d)
Implementation
15.
Prioritizing project request is done in which phase?
a)
Planning
b)
Analysis
c)
Design
d)
Implementation
16.
Developing programs is done in which phase?
a)
Planning
b)
Analysis
c)
Design
d)
Implementation
17.
Converting to new system is done in which phase?
a)
Planning
b)
Analysis
c)
Design
d)
Implementation
18.
Monitoring system performance is done in which phase?
a)
Planning
b)
Analysis
c)
Maintenance
d)
Implementation
19.
Train users is done in which phase?
a)
Planning
b)
Analysis
c)
Design
d)
Implementation
20.
Performing maintenance activities is done in which phase?
a)
Planning
b)
Maintenance
c)
Design
d)
Implementation
21.
Reviewing project request is done in which phase?
a)
Planning
b)
Analysis
c)
Design
d)
Implementation
22.
Assessing system security is done in which phase?
a)
Planning
b)
Analysis
c)
Design
d)
Maintenance
23.
Allocating resources is done in which phase?
a)
Planning
b)
Analysis
c)
Design
d)
Implementation
24.
Forming team for project development is done in which phase?
a)
Planning
b)
Analysis
c)
Design
d)
Implementation
25.

It is the most important stage in SDLC

a)

Deployment

b)

Building

c)

Defining

d)

Planning

26.

It is a process that consists of a series of planned activities to develop or alter the Software Products

a)

Software Development Life Cycle

b)

Life Cycle

c)

Development Process

d)

Graphical Representation

27.

Give at least 3 stages of SDLC

a)

Planning

b)

Deployment

c)

Building

d)

Scanning

e)

Arrangement

28.

This is based on feedback whether the product may be release as it is or with suggested enhancements in the targeting market segment.

a)

Deployment in the Market and Maintenance

b)

Testing in the Product

c)

Planning and Requirement Analysis

d)

Developing the Product

29.

What are the three (3) general guidelines for System Development

a)

Grouping tasks into phases

b)

Must involve users

c)

Set up rules and procedures

d)

Make a budget

30.

What is the third step in System Development Life Cycle (SDLC)

a)

decorate

b)

design

c)

detached

d)

decompose

31.

Who participates in the system development life cycle?

a)
b)
c)
d)
32.

During which phase are the systems set up for monitoring the three main elements of the project plan (scope, schedule, and costs)?

a)

Building and testing phase

b)

Implementation or publishing phase

c)

Design phase

d)

Planning and analysis phase

33.

which planning tool is this - visually representing a project's tasks and the dependencies connected to each one.

a)
Spry Chart
b)
Gantt Chart
c)
Bar Graph
d)
PERT Tool
34.
which planning tool is this - a timeline that is used as a project management tool
a)
Spry Chart
b)
Gantt Chart
c)
Bar Graph
d)
PERT Tool
35.

A programmer would be a useful person to employ in which stage?

a)

Planning

b)

Design.

c)

Implementation.

d)

Analysis.

36.

Which of these are performed in the Analysis phase?

a)

Determine the main problem 

b)
Build a prototype. 
c)
Perform a detailed analysis of the old system. 
d)
Review and allocate resources to the project. 
37.

Which of these are performed in the Planning phase?

a)

Prioritize project requests.  

b)
Build a prototype. 
c)

Review and approve project requests

d)

Allocate resources to the project. 

e)

Form a project development team

38.

Which of these is the correct order of the SDLC?

a)

Maintenance, Planning, Design, Analysis, Implementation

b)

Analysis, Planning, Design, Maintenance, Implementation

c)

Planning, Analysis, Design, Implementation, Maintenance

d)

Planning, Analysis, Implementation, Design, Maintenance

39.
What happens in the Analysis Stage?
a)
Look at the existing system and find areas to improve
b)
Create the new system and test it
c)
Place the new system into the company for use
d)
Decide how well the new system is working
40.
"I asked questions verbally to all the employees of the accounts department at Greensteds School, to find out how their systems work." What research method is described above?
a)
Questionnaires
b)
Interviews
c)
Collecting Documents
d)
Observation
41.
"While at the supermarket, one of the workers gave me a handout containing questions that I had to answer and return. " Which research method is described above
a)
Handouts
b)
Questionnaire
c)
Receipt
d)
Evaluation
42.
in Analysis Phase, the main purpose of the Preliminary Investigation (feasibility study) is .....
a)
to determine the exact nature of the problem or improvement and decide whether it is worth pursuing
b)
to determine the users’ wants, needs, and requirements;
c)
to develop all of the details of the new or modified information system
43.
Acquire hardware and software is done in which phase?
a)
Planning
b)
Analysis
c)
Design
d)
Implementation
44.
Developing details of system is done in which phase?
a)
Planning
b)
Analysis
c)
Design
d)
Implementation
45.

These are methods to conduct Research in the Requirement Analysis stage except?

a)

Observation

b)

Interviews

c)

Reviewing documents

d)

Identify suitable hardware

46.

which one is correct for System Analyst.

a)

Person responsible for designing and developing an information system (IS)

b)

A person that performs functions specific to the company/organization. This person will develop based on user needs

47.

What are the three basic types of documents to identify technical specifications of acquiring hardware and software

a)

RFQ

b)

RFP

c)

RFI

d)

RFT

48.

How many steps are there in acquiring hardware and software in Design phase

a)

2

b)

3

c)

4

d)

5

49.

What happens in the design phase?

a)

The code is produced

b)

Making changes when the software has been created

c)

Planning the solution, look and feel of the software interface

d)

Ensuring the requirements are understood

50.

The purpose of A prototype is to test the proposed design.

a)

True

b)

False

51.

What is "prototype"?

a)

The final product.

b)

One important activity during the explore phase.

c)

Sample version of a product.

52.
Install and test new system is done in which phase?
a)
Planning
b)
Analysis
c)
Design
d)
Implementation
53.
Developing programs is done in which phase?
a)
Planning
b)
Analysis
c)
Design
d)
Implementation
54.
Converting to new system is done in which phase?
a)
Planning
b)
Analysis
c)
Design
d)
Implementation
55.
Train users is done in which phase?
a)
Planning
b)
Analysis
c)
Design
d)
Implementation
56.
Performing maintenance activities is done in which phase?
a)
Planning
b)
Maintenance
c)
Design
d)
Implementation
57.

The user stops using the old system and begins using the new system on a certain date. Which conversion is this?

a)

Direct conversion

b)

Parallel conversion

c)

Phased conversion

d)

Pilot conversion

58.

Consists of running the old system along side the new system for a specified time. Which conversion is this?

a)

Direct conversion

b)

Parallel conversion

c)

Phased conversion

d)

Pilot conversion

59.

Larger systems that have multiple sites. Each location converts at a separate time. Which conversion is this?

a)

Direct conversion

b)

Parallel conversion

c)

Phased conversion

d)

Pilot conversion

60.

Only one location in the organization uses the new system. The rest will wait until a

specific date (green light) given and will convert simultaneously. Which conversion is this?

a)

Direct conversion

b)

Parallel conversion

c)

Phased conversion

d)

Pilot conversion

61.
What happens in the implementation phase?
a)
The code is tested against the specfication
b)
Making changes when the sotware has been created
c)
Planning the solution, look and feel of the software interface
d)
The deliverables of the implementation stage are created e.g. the code
62.
Monitoring system performance is done in which phase?
a)
Planning
b)
Analysis
c)
Maintenance
d)
Implementation
63.
Performing maintenance activities is done in which phase?
a)
Planning
b)
Maintenance
c)
Design
d)
Implementation
64.
Assessing system security is done in which phase?
a)
Planning
b)
Analysis
c)
Design
d)
Maintenance
65.

Which stage in SDLC is missing?

(a)  

66.

Technical writers generally provide ____________ for the new

system.

a)

programs

b)

network

c)

analysis

d)

documentation

67.
Choose the suitable reason for initiating a System Development Project
A. To correct an error in existing system.
B. Instruction from government  eg: GST in resit.
C. Improve Hardware and Software.
D. Impress the Company Directors
a)
A, B and C
b)
A, B and D
c)
A, C and D
d)
All of the above
68.
In this phase, a steering committee is involve in reviewing, prioritizing, allocating resource and appointing project team.
Choose the person who is not considered as a part of the steering committee.
a)
Civil Engineer
b)
Non management User
c)
Managers
d)
System Analyst
69.

What is the purpose of system test?

a)

To verifies that each individual program or object works by itself

b)

To transform the requirements into complete and detailed system design specifications.

c)

To verifies that all programs in an application work together properly

70.

Identify and state the suitable phase of System Development Life Cycle (SDLC) for the following statement


-Aiman Zafran is involved in a department which eliminates errors in the running system.-

a)

design

b)

maintenance

c)

planning

d)

implementation