Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Project vs. PBL

Total questions: 23

Worksheet time: 12mins

Name
Class
Date
1.

is pre-planned and clear

a)

Project-Based Learning

b)

Project

2.

the audience is generally outside the school

a)

Project-Based Learning

b)

Project

3.

can be outlined in details on one piece (or even two pieces) of paper by the teacher

a)

Project-Based Learning

b)

Project

4.

the ‘teacher work’ mainly occurs after the project is complete

a)

Project-Based Learning

b)

Project

5.

Are more about the end-product and less about the learning and process

a)

Project-Based Learning

b)

Project

6.

Input from peers, teachers, community members, experts, and others can help guide and improve the project

a)

Project-Based Learning

b)

Project

7.

The audiences for projects are generally in the school

a)

Project-Based Learning

b)

Project

8.

The ‘teacher work’ is done mainly before and during the process itself

a)

Project-Based Learning

b)

Project

9.

is based on directions and criteria

a)

Project-Based Learning

b)

Project

10.

can be done at home without teacher guidance or collaboration

a)

Project-Based Learning

b)

Project

11.

depends on background knowledge, learner choice, technology tools, support from others, and dozens of other factors that result in a process of learning that produces very different results and ‘projects’

a)

Project-Based Learning

b)

Project

12.

‘turned in’ rather than ‘published,’ presented, or otherwise managed on an ongoing basis

a)

Project-Based Learning

b)

Project

13.

often based on a driving question and ongoing inquiry, discovery, and iteration

a)

Project-Based Learning

b)

Project

14.

less open-ended and more uniform

a)

Project-Based Learning

b)

Project

15.

includes ‘need to knows’ and progress checkpoints

a)

Project-Based Learning

b)

Project

16.

In a high school math class, students are asked to do research on a famous mathematician and make a presentation about him or her.

a)

Project

b)

Project-Based Learning

17.

After a two-week unit on the history of the 1960s that ended with a test, students spend two days staging a mock protest and hippie gathering, with costumes, props, and music.

a)

Project

b)

Project-Based Learning

18.

Students consider the driving question, “Why did civilizations fall from their Golden Ages, and what lessons can we learn from what happened?” as they research various ancient civilizations and create museum exhibits to share their answers.

a)

Project

b)

Project-Based Learning

19.

Students make posters at home to illustrate ways to save water and energy, and put them up on the walls of the classroom.

a)

Project

b)

Project-Based Learning

20.

Students investigate how waste in local waterways contributes to the problem of plastic in the ocean. They propose solutions to the problem and present them to city officials.

a)

Project

b)

Project-Based Learning

21.

Students launch bottle rockets at the end of a physics/math unit, to apply what they have learned.

a)

Project

b)

Project-Based Learning

22.

Students create mobiles with various geometric shapes, which are hung in the classroom.

a)

Project

b)

Project-Based Learning

23.

In a middle school English Language Arts class, students create a fan fiction website, including a feature that enables editing and giving feedback so other students can submit their writing.

a)

Project

b)

Project-Based Learning