wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

PROFESSIONAL PRACTICE 2 UE MIDTERM EXAM

Total questions: 30

Worksheet time: 23mins

Name
Class
Date
1.

Professionalism It is the discipline concerned with

what is morally right and wrong

a)

TRUE

b)

FALSE

2.

The Architect shall always endeavor to protect the Contractors interests but never at the expense of higher public interests and public welfare.

a)

TRUE

b)

FALSE

3.

The __________ may reject or condemn material, equipment, or workmanship which is not in conformity with the Contract Documents.

a)

Contractor

b)

Owner

c)

Architect

d)

Consultants

4.

All market discounts shall be credited to the Architect.

a)

TRUE

b)

FALSE

5.

the Architect shall be retained as a professional adviser in a competition, accept employment as an Architect for the competition project, except as ____________.

a)

Project

Manager

b)

Construction

Supervisor

c)

Consulting

Architect

d)

Architect of

Records

6.

Whenever the nature of work involved examples of our architectural heritage, the Architect must look at all possibilities of renovation.

a)

TRUE

b)

FALSE

7.

The Architect must have sufficient information on the nature and scope of the project to enable him/her to prepare a _____________.

a)

Actual

Construction

Cost

b)

Fee

Proposal

c)

Probable

Construction

Cost

d)

Bill of Quantities

8.

the architect shall undertake the construction of a project even when the plans were prepared by him/her when it conforms with pertinent sections of the "Standards of Professional Practice".

a)

TRUE

b)

FALSE

9.

the Architect shall not ask for any other returns in whatever form from any interested source other than the Contractor.

a)

TRUE

b)

FALSE

10.

The Architect’s work starts at the inception of the project when the Owner outlines his requirements to the Contractor. 

a)

TRUE

b)

FALSE

11.

Consults with the Owner to ascertain the conceptual framework and related requirements of the project and confirms such requirements with him. 

a)

Design

Phase

b)

Pre-Design

Phase

c)

Design

Development

Phase

d)

Project Definition

Phase

12.

______________ is the first phase of design.

a)

Pre-Design

Phase

b)

Design

Phase

c)

Schematic

Design

Phase

d)

Design

Developement

Phase

13.

In _______ phase the architect and owner will work together to select materials including interior finishes and products such as windows, doors, fixtures, appliances, etc.

a)

Pre-Design

Phase

b)

Schematic Design

Phase

c)

Design

Development

Phase

d)

Design Phase

14.

The architect and engineers finalize all the technical design.

a)

Design

Development

Phase

b)

Post-Construction

Phase

c)

Construction

Document

Phase

d)

Design

Phase

15.

The architect will periodically visit the job site to see progress and ensure the Project Manager is following the plans.

a)

TRUE

b)

FALSE

16.

The Construction Administration phase of

architectural services is the final phase.

a)

TRUE

b)

FALSE

17.

All designs, drawings, models, specifications and other contract documents and copies thereof, prepared, duly signed, stamped and sealed and furnished as instruments of service, are the intellectual property and documents of the Owner.

a)

TRUE

b)

FALSE

18.

During the progress of work, the ______ shall furnish the Architect a copy of the records of expenses being incurred on the construction.

a)

Contractor

b)

Project

Manager

c)

Owner

d)

Constrcuction

Supervisor

19.

Prepares the Bid Documents.

a)

Bidder

b)

Contractor

c)

Architect

d)

Owner

20.

In this method:

-Contractors do not compete against each other.

-owners/clients are not provided comparative pricing.

a)

Bidding

b)

Negotiation

c)

Procurement

d)

Low Bid

Selection

21.

Refers to the task or function of ensuring that a construction contract (the contract between the client and the contractor) is executed in accordance with the terms of the contract.

a)

Bidding

and Negotiation

b)

Contract

Signing

c)

Construction

Contract

Supervision

d)

Construction

Contract

Adminsitration

22.

Makes decisions on all claims of the Owner and Contractors on all matters relating to the execution and progress of work; Interpreting the Construction Contract.

a)

Project

Manager

b)

Architect of

Record

c)

Sub-Contractors

d)

Architect of Construction

Supervision

23.

Should more extensive inspection or full-time (8-hour) construction supervision be required by the Client, a separate full-time Contractor shall be hired and agreed upon by the Owner and the Architect subject to the conditions provided in the SPP Document on Full -Time Supervision. 

a)

TRUE

b)

FALSE

24.

The owner shall conduct the necessary inspections to determine the date of substantial and final completion and issue the final Certificate of Payment to the Contractor.

a)

TRUE

b)

FALSE

25.

In most cases, the negotiated approach provides the owner with the least value for their money.

a)

TRUE

b)

FALSE

26.

Bidders will be asked to pay for the Bidding Documents.

a)

TRUE

b)

FALSE

27.

The Foreman shall report to the Client defects and

deficiencies noted in the work of Contractors

a)

TRUE

b)

FALSE

28.

Bidding and negotiations involves organizing a bidding process, selection of contractor, and negotiating a construction contract.

a)

TRUE

b)

FALSE

29.

Bidding Documents shall reflect the:

Minimum requirements or specifications required.

a)

TRUE

b)

FALSE

30.

Ethics is The conduct, aims, or qualities

that characterize a professional.

a)

TRUE

b)

FALSE