WorksheetsPROFESSIONAL PRACTICE 2 UE MIDTERM EXAM
Total questions: 30
Worksheet time: 23mins
Professionalism It is the discipline concerned with
what is morally right and wrong
TRUE
FALSE
The Architect shall always endeavor to protect the Contractors interests but never at the expense of higher public interests and public welfare.
TRUE
FALSE
The __________ may reject or condemn material, equipment, or workmanship which is not in conformity with the Contract Documents.
Contractor
Owner
Architect
Consultants
All market discounts shall be credited to the Architect.
TRUE
FALSE
the Architect shall be retained as a professional adviser in a competition, accept employment as an Architect for the competition project, except as ____________.
Project
Manager
Construction
Supervisor
Consulting
Architect
Architect of
Records
Whenever the nature of work involved examples of our architectural heritage, the Architect must look at all possibilities of renovation.
TRUE
FALSE
The Architect must have sufficient information on the nature and scope of the project to enable him/her to prepare a _____________.
Actual
Construction
Cost
Fee
Proposal
Probable
Construction
Cost
Bill of Quantities
the architect shall undertake the construction of a project even when the plans were prepared by him/her when it conforms with pertinent sections of the "Standards of Professional Practice".
TRUE
FALSE
the Architect shall not ask for any other returns in whatever form from any interested source other than the Contractor.
TRUE
FALSE
The Architect’s work starts at the inception of the project when the Owner outlines his requirements to the Contractor.
TRUE
FALSE
Consults with the Owner to ascertain the conceptual framework and related requirements of the project and confirms such requirements with him.
Design
Phase
Pre-Design
Phase
Design
Development
Phase
Project Definition
Phase
______________ is the first phase of design.
Pre-Design
Phase
Design
Phase
Schematic
Design
Phase
Design
Developement
Phase
In _______ phase the architect and owner will work together to select materials including interior finishes and products such as windows, doors, fixtures, appliances, etc.
Pre-Design
Phase
Schematic Design
Phase
Design
Development
Phase
Design Phase
The architect and engineers finalize all the technical design.
Design
Development
Phase
Post-Construction
Phase
Construction
Document
Phase
Design
Phase
The architect will periodically visit the job site to see progress and ensure the Project Manager is following the plans.
TRUE
FALSE
The Construction Administration phase of
architectural services is the final phase.
TRUE
FALSE
All designs, drawings, models, specifications and other contract documents and copies thereof, prepared, duly signed, stamped and sealed and furnished as instruments of service, are the intellectual property and documents of the Owner.
TRUE
FALSE
During the progress of work, the ______ shall furnish the Architect a copy of the records of expenses being incurred on the construction.
Contractor
Project
Manager
Owner
Constrcuction
Supervisor
Prepares the Bid Documents.
Bidder
Contractor
Architect
Owner
In this method:
-Contractors do not compete against each other.
-owners/clients are not provided comparative pricing.
Bidding
Negotiation
Procurement
Low Bid
Selection
Refers to the task or function of ensuring that a construction contract (the contract between the client and the contractor) is executed in accordance with the terms of the contract.
Bidding
and Negotiation
Contract
Signing
Construction
Contract
Supervision
Construction
Contract
Adminsitration
Makes decisions on all claims of the Owner and Contractors on all matters relating to the execution and progress of work; Interpreting the Construction Contract.
Project
Manager
Architect of
Record
Sub-Contractors
Architect of Construction
Supervision
Should more extensive inspection or full-time (8-hour) construction supervision be required by the Client, a separate full-time Contractor shall be hired and agreed upon by the Owner and the Architect subject to the conditions provided in the SPP Document on Full -Time Supervision.
TRUE
FALSE
The owner shall conduct the necessary inspections to determine the date of substantial and final completion and issue the final Certificate of Payment to the Contractor.
TRUE
FALSE
In most cases, the negotiated approach provides the owner with the least value for their money.
TRUE
FALSE
Bidders will be asked to pay for the Bidding Documents.
TRUE
FALSE
The Foreman shall report to the Client defects and
deficiencies noted in the work of Contractors
TRUE
FALSE
Bidding and negotiations involves organizing a bidding process, selection of contractor, and negotiating a construction contract.
TRUE
FALSE
Bidding Documents shall reflect the:
Minimum requirements or specifications required.
TRUE
FALSE
Ethics is The conduct, aims, or qualities
that characterize a professional.
TRUE
FALSE