1.

If you were called to a small job that involved a lot of travel, you may decide that it's not worth your while. This would be calculated under...

a)

Batch Costing

b)

Activity-Based Costing

c)

Life-Cycle Costing

d)

Travel Costing

2.

Calculating the cost of a building over its entire life span, not just the construction phase is known as...

a)

Batch Costing

b)

Activity-Based Costing

c)

Life-Cycle Costing

d)

Travel Costing

3.

What is the SI unit for Temperature?

a)

Meter

b)

Second

c)

Ampere

d)

Kelvin

4.

What is the SI unit for electrical current?

a)

Meter

b)

Kilogram

c)

Ampere

d)

Mol

5.

What is the SI unit for length?

a)

Kilogram

b)

Meter

c)

Ampere

d)

Kelvin

6.

Litres would measure what?

a)

Volume

b)

Capacity

c)

Length

d)

Time

7.

A Caliper may be used to gain an...

a)

accurate size of an object

b)

accurate measure of distance between properties

c)

accurate measurement of incline

d)

accurate measurement of decline

8.

The amount of carbon produced in the manufacture of an appliance is known as its...

a)

Carbon footprint

b)

Overall carbon

c)

Carbon measure

d)

Embodied carbon

9.

The amount of carbon a building produces through usage is known as its...

a)

Carbon measure

b)

Whole life carbon footprint

c)

Carbon capacity

d)

Carbon climate

10.

If a site measurement is given as 50m with a tolerance of ± 0.5%, what is the permissible range of measurement?

a)

48.75 - 52.25

b)

49.75 - 50.25

c)

49.10 - 50.90

d)

49.85 - 50.15

11.

Inaccurate measurements could lead to...

a)

Damage to pipework

b)

Incorrect interior design specification

c)

The wrong substructure dimensions being laid

d)

Lack of commissioning paperwork

12.

An internal space measures 6M x 7M x 3M, what is the volume of that space?

a)

126 Meters squared

b)

120 Meters cubed

c)

120 Meters squared

d)

126 Meters cubed

13.

How much does 26 Litres of water weigh?

a)

260 KG

b)

2600 KG

c)

26 KG

d)

2.6 KG

14.

What is the British Standard for construction drawings?

a)

BS 1192

b)

BS 1996

c)

BS 8000

d)

BS 9999

15.

On a scale drawing at 1:20, a measurement of 95mm represents what length in the real world?

a)

190 M

b)

19 M

c)

1.5 M

d)

1.9 M

16.

A cistern measuring 0.8M x 1.2M x 1.8M is completely full of water. How much will the water in this cistern weigh?

a)

1728 KG

b)

1.7 KG

c)

1.728 KG

d)

17.28 KG

17.

The most appropriate tool to use when reading a scale drawing is a...

a)

Laser measure

b)

Spirit level

c)

Scale rule

d)

Measuring wheel

18.

You have been asked to tile a bathroom floor. A box of tiles costs £25 and each box covers 6 meters squared. The floor space measures 5M x 5M. How much money will you need to spend on tiles?

a)

£100

b)

£125

c)

£65

d)

£115

19.

An estimate for the carbon emissions created by the day to day functions of a home can be referred to as it's...

a)

Operational Carbon

b)

High Level Carbon

c)

Low Level Carbon

d)

Unseen Carbon

20.

The recommended depth for loft insulation is 270mm for glass fibre, but what measurement is recommended for rock wool?

a)

200 mm

b)

225 mm

c)

250 mm

d)

275 mm