Protection Method Part 1

Total questions: 25

Worksheet time: 13mins

Name
Class
Date
1.

The Burden of CT is...........?

a)

The load of voltage transformer

b)

The load of DB

c)

The load of flicker test.

d)

The load of current transformer

2.

A Class 5P20 CT means 5 = % error, P = Metering class, 20 means = 20 times of rated current

a)

TRUE

b)

FALSE

3.

The false operation of the protection relays connected to CT is caused because of.....?

a)

Wrong connection of main power.

b)

Disconnection of CT burden

c)

Wrong connection of CT poles

d)

All of mentioned

4.

In CT the primary current flows from Primary 2 (P2) to Primary 1 (P1)

a)

TRUE

b)

FALSE

5.

During electrical design, the persone who decide the rate of MCB is .......

a)

The manager

b)

The project owner

c)

you

d)

The designer

6.

The cicuit breaker is a reusable protection methods.

a)

TRUE

b)

False

7.

The Crocodile test lead is comply with GS38.

a)

TRUE

b)

FALSE

8.

To track potential breakdown we must keep history of maintenance activities

a)

TRUE

b)

FALSE

9.

Isolation in accordance with procedure is required before carrying out protection system Maintenance works.

a)

TRUE

b)

FALSE

10.

Before working on a circuit, you must ........................... the power supply

a)

Isolate

b)

switch on

c)

Hold

d)

open

11.

The maximum setting of a motor overload is finding by motor full load voltage

a)

TRUE

b)

FALSE

12.

Which devise in below provide protection against earth fault and over current

a)

RCBO

b)

RCCB

c)

MCB

d)

fuse

13.

Protection unit on power supply is called....?

a)

Flicker Test

b)

Crowbar unit

c)

MCB

d)

RCD

14.

SELV required an earth connection

a)

TRUE

b)

FALSE

15.

What is the BURDEN of CT.

a)

The load of RCD

b)

The voltage of current transformer

c)

The load of current Transformer

d)

The current of current Transformer

16.

What is the recognized method for CT polarity test

a)

Polarity test

b)

Primary injection test

c)

Continuity test

d)

Electrical test

17.

All exposed metal in electrical circuit should be ....

a)

Earthed

b)

Connected together

c)

Kept away

d)

Painted

18.

What meter use for CT Flicker test

a)

Voltmeter

b)

Ammeter

c)

Ohmmeter

d)

All mentioned

19.

RCD testing is carried out with supply present

a)

TRUE

b)

FALSE

20.

Tripping current (It) for 100mA RCD to operate in 150ms is...

a)

200mA

b)

220mA

c)

110mA

d)

300mA

21.

Base on BS-7671, which device below is not classed as a basic protection method?

a)

Fuse

b)

Isolator

c)

RCD

d)

Barriers

22.

According to the British standards, Which of following is not cartridge fuse

a)

BS-3036

b)

BS-1362

c)

BS-1361

d)

BS-88

23.

It is necessary to keep record of maintenance history activities, in order to ....?

a)

Clean the area

b)

Track potential breakdown

c)

To build up the power system

d)

To help isolate the circuit

24.

Why it is important to keep CPC (Circuit Protection Conductor) connection secure all the time?

a)

To insure cut-of the power

b)

To insure operation of MCB

c)

To isolate the system

d)

To insure operation of circuit protection device

25.

Which of the following is fuse open to atmosphere?

a)

BS 1361

b)

BS 7071

c)

BS 1362

d)

BS 3036