wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Construction & The Built Environment T-Levels

Total questions: 23

Worksheet time: 12mins

Name
Class
Date
1.

An individual operating as a self-employed worker who takes on smaller contracts such as plastering the rooms of a house or extension, would be classes as a....

a)

Main Contractor

b)

Public Limited Company

c)

Sole Trader

d)

Partnership

2.

When discussing company types, what does the acronym SME stand for?

a)

Small or Medium Sized Enterprise

b)

Small or Major Sized Enterprise

c)

Small or Medium Sized Entrepreneur

d)

Small or Medium System Enterprise

3.

A companies reputation, their workforce and equipment inventory, and their financial resources, are all factors that are taking into consideration when a company tenders for a job. What is another factor?

a)

The type of transport they use to get to jobs

b)

Their preferred method of working

c)

Their administrative capabilities

d)

The holiday allowance they offer staff

4.

Which member of the construction industry visits workplaces to ensure that all necessary Building Regulation Approved Documents are being adhered to?

a)

The Builder

b)

The Building Control Officer

c)

The HSE

d)

The Site Manger

5.

If a customer wants an office block constructed, what type of client are they?

a)

Residential

b)

Industrial

c)

Health

d)

Commercial

6.

A large infrastructure project, such as a bridge being built, would be classed as which type of construction?

a)

Commercial

b)

Residential

c)

Industrial

d)

Utilities & Transport

7.

What percentage of the UK's total economic output comes from the construction industry?

a)

6%

b)

8%

c)

10%

d)

16%

8.

Enhanced commuter travel, improved human networking and the economical movement of goods are all benefits of having a robust...

a)

Construction industry

b)

Communication system between trades

c)

Infrastructure

d)

Relationship with the client

9.

Which factor below could impact the growth of the construction industry?

a)

Political change

b)

Advancements in technology

c)

Environmental considerations

d)

All of the above

10.

What is one method of ensuring that the planning stage of a large construction project is economical and efficient?

a)

BIM Level 2

b)

Guessing labour requirements

c)

Hoping for the best

d)

Working as a sole trader

11.

What are the two types of tender common to the construction industry?

a)

Open & Closed

b)

Open & Shut

c)

In & Out

d)

On & Off

12.

What is the role of a Civil Engineer?

a)

Designs substructure systems

b)

Designs and oversees construction of buildings and infrastructure.

c)

Designs and oversees construction of private dwellings

d)

Designs digital drawings through BIM Level 2

13.

What is the role of a Building Services Engineer?

a)

Designs and oversees construction of buildings and infrastructure

b)

Creates drawing on CAD

c)

Design, installation, and maintenance of electrical, heating and ventilation systems

d)

Manages services and facilities

14.

A stores assistant on site would be classed as a...

a)

Non-important operative

b)

Skilled worker

c)

Non-skilled operative

d)

Joiner

15.

The acronym CPD stands for...

a)

Continuous Personal Development

b)

Continuous Professional Development

c)

Constant Professional Development

d)

Career Professional Development

16.

The three types of CPD are formal, informal and...

a)

On-going

b)

Open

c)

Chartered

d)

Necessary

17.

What does the acronym CDE stand for?

a)

Career Data Environment

b)

Central Data Environment

c)

Common Data Establishment

d)

Common Data Environment

18.

What does the acronym DPoW stand for?

a)

Digital prospect of Works

b)

Digital Plan of Works

c)

Daily Plan of Works

d)

Developmental Plan of Works

19.

What does the acronym EIR stand for?

a)

Employer's Information Requirements

b)

Employer's Institution Requirements

c)

Employer's Installation Requirements

d)

Employer's Information Regulations

20.

What does the Acronym PESTLE stand for?

a)

Political, Economic, Social, Technological, Legal, Environmental

b)

Personal, Economic, Social, Technological, Legal, Environmental

c)

Political, Environmental, Social, Technological, Legal, Environmental

d)

Political, Economic, Social, Terminology, Legal, Environmental

21.

When considering any construction work, the most vital acronym to consider would be...

a)

EIR

b)

PESTLE

c)

DPoW

d)

BIM

22.

What is another term for the modular construction method?

a)

Immersive

b)

Panelised

c)

Mechanical

d)

Volumetric

23.

Which term is used in the tendering process?

a)

Metadata

b)

Curtailment

c)

Prime cost

d)

Client need