This process selects from a list of potential sites on that suits best in the given use and requirements of the project.
Development Sustainability Process
Site Selection Process
Site Planning
Site Analysis
It influences the privacy, social contact among people, and freedom of movement of an individual or a group of people.
Density
Zoning
Transit System
Utilities
It is a confined view usually directed toward a terminal or a dominant feature.
View
Vista
Foreground
View Station
Phrase used to characterize development that meets the needs of the present generation without compromising the needs of future generations.
Sustainable Development
Advocacy Planning
Agricultural Surplus
Sustainable Land Use Planning
These are imaginary lines that join points of equal elevation on the surface of the land above or below a reference surface such as the mean sea level.
Topography
Contours
Slope
Map
What is the best way to provide for the convenience of both people in wheelchair and blind persons?
Railings
Tactile surface/ blocks in the immediate vicinity of crossings
Light controlled crossings with pedestrians phases and audible signals
Brightly painted zebra crossing
What is the minimum opening in a room ?
10% of wall area
12% of wall area
15% of wall area
20% of wall area
What is the preferred design for a stair considering users of crutches?
Slanted thread
Open Riser Stairs
Slanted Nosing
Right Angle Stairs
What should be provided in the immediate vicinity of crossings as an aid to the blind?
Tactile surface
Pavers with slot openings
Planters and landscapes
0.30 m kick plates
What is the least dimension of a parking slot for the disabled?
2.70 m
3.00 m
3.70 m
3.80 m
It is the instructions that supplements or modify drawings, specs. & general conditions of the contract.
Special provisions
Supplementary specs
Drawings
Specifications
A compensation type is based on technical hours expended by consultants, technical staff, and architects.
Professional fee plus expenses
% of construction cost
Multiple of direct personnel expense
Fixed fee
What does SPP 201 discusses about?
Post - construction services
Specialized Architectural services
Professional Architectural consulting Services
Pre-Design services
_______ is the penalty for unpaid due Professional fee within the contract time.
Interest Payment
Penalty
Liquidated damages
Surcharge
The UAP can revoke any professional license for a cause.
True
False
Maybe
In some occasion