Quiz Review Intro to Construction Documents - Part 1

Total questions: 25

Worksheet time: 2hrs 5mins

Name
Class
Date
1.
A site plan ____.
a)
Does not show features such as trees and driveways
b)
Shows the location of the building from an aerial view
c)
Is drawn after the floor plan is drawn, before the HVA is designed
d)
Includes information about plumbing fixtures and equipment
2.
The latest revision date on a set of construction drawings can be found ____.
a)
Inside the detail
b)
In the schedule
c)
In the legend
d)
In the title block
3.
If you are not sure what a particular symbol means, you should try looking in the ______.
a)
Legend
b)
Title Block
c)
Alphabet of Lines
d)
Section Cut
4.
The ____ of a drawing tells the size of the drawn object compared to the actual size.
a)
Legend
b)
Title
c)
Scale
d)
Revision number
5.
What kind of a plan details the materials to be used in the construction of a building?
a)
Civil plan
b)
Structural plan
c)
Mechanical plan
d)
Architectural plan
6.
Part of a drawing usually located in one of the corners that will provide information on what the drawing is showing.
a)
Legend
b)
Revision number
c)
RFI
d)
Title block
7.

_____________ plans are used for work that has to do with construction in or on the earth.

a)

Civil

b)

Architectural

c)

Mechanical

d)

Structural

8.

Civil plans are also called ________ plans or plot plans.

a)

indoor

b)

floor

c)

area

d)

site

9.

_____________ plans are made up of several different drawings including floor plans, roof plans, elevation drawings, detail drawings, and more.

a)

Structural

b)

Mechanical

c)

Architectural

d)

Civil

10.

When a drawing is made looking down on an object from above it is often referred to as _________ view

a)

sky

b)

plan

c)

above

d)

over

11.

Elevation drawings are______ views of the building.

a)

top

b)

plan

c)

side

d)

isometric

12.

Section drawings are cross-sectional views that show the __________ of an object or building.

a)

inside

b)

outside

c)

roof

d)

floor

13.

Detail drawings are ___________ views of special features to make it clearer how the parts of the feature go together and make the details clearer.

a)

reduced

b)

plan

c)

mechanical

d)

enlarged

14.

__________ plans explain the materials to be used for the walls and a wall framing plan that shows how the walls are to be framed and whether the framing is to be wood or steel.

a)

Mechanical

b)

Structural

c)

Architectural

d)

Civil

15.

_______________ plans are engineered plans for motors, pumps, piping systems and piping equipment.

a)

Mechanical

b)

Structural

c)

Architectural

d)

Civil

16.

HVAC stands for...

a)

Hot Vents and Controls

b)

Hardness Variance and Considerations

c)

Heating Ventilation and Air Conditioning

d)

Hammered Venting and Closures

17.

What part of a title block identifies the project name?

a)

Sheet Title

b)

Corporate Logo

c)

Legend

d)

Revision Block

18.

The ratio of the size of the object as drawn to the object’s actual size is called the __________.

a)

inversion

b)

sizing

c)

reduction

d)

scale

19.

What is the main reason you need to make sure you are working from the newest plan revision?

a)

Because Mr. Nelson said so.

b)

That is traditionally what is done.

c)

Because small changes in one place can make a big difference somewhere else.

d)

It really is not important at all.

20.

What part of a construction document identifies the symbols and line types used in the document?

a)

Title Block

b)

Revision Block

c)

Legend

d)

Architect's Stamp

21.

_____________________ define the quality of work to be done and describe the materials to be used and clarify information that cannot be shown on the drawings.

a)

Specifications

b)

Detail Drawings

c)

Legends

d)

Revision Blocks

22.

This _______________ is used to record any changes to the drawing.

a)

Title Block

b)

Legend

c)

Drawing Area

d)

Revision Block

23.

A ______________ identifies each circuit breaker position and its electrical capacity.

a)

Mechanical Plan

b)

Floor Plan

c)

Fire Protection Plan

d)

Panel Schedule

24.

______________ include the locations of the electric meter, distribution panel, switchgear, convenience outlets and special outlets.

a)

Panel Schedules

b)

Electrical Plans

c)

Mechanical Plans

d)

Fire Protection Plans

25.

The purpose of the border on a construction document is to...

a)

leave space for company advertising.

b)

leave space for general notes to be printed.

c)

ensure that information is not lost when the document is reproduced.

d)

ensure that the drawing areas do not get mixed up.