WorksheetsPDE QUIZ BEE
Total questions: 20
Worksheet time: 12mins
These Vishay Opto locations have R&D, EXCEPT for
Taiwan
Singapore
Malaysia
Philippines
APQP means
Advanced Planning for Quality of Products
Advanced Planning for Qualification of Products
Advanced Product Quality Planning
Advanced Process Qualification of Products
At which phase in the APQP do we submit samples for Reliability Loading
Phase III
Phase V
Phase II
Phase IV
At which phase in the APQP do we initiate PPAP
Phase III
Phase I
Phase II
Phase IV
ppk means
process capability index
process capability
process performance index
process performance
Six Sigma means a yield of no less than
99.997%
99.9999%
99.9997%
99.999%
Which of these is NOT part of 5S?
Shine
Sort
Segregate
Standardize
Who is our DCCO in Opto?
Cassago
Wilson
Norico
Gaertner
Who is our EHSMS Representative?
Mr. Lang
Arnel Buergo
Lloyd Magat
Jennifer Marquez
Who is our EHSMS Chairperson?
Mr. Lang
Arnel Buergo
LLoyd Magat
Jennifer Marquez
In our rule of thumb for FMEA & Special Characteristics, findings of Special Characteristics are defined by:
Severity x Occurrence = S x O ≥ 50
Severity x Occurrence = S x O ≥ 30
Severity x Occurrence = S x O ≥ 15
Severity x Occurrence = S x O ≥ 25
Which of these is NOT part of the SEVEN QC TOOLS?
Pareto chart
Log sheet
Control chart
2 sample T-test
Enumerate all the 6Ms in a Fishbone Diagram
(a)
This quality tool is useful in identifying the "vital few" that can impact your performance metric, based on the 80-20 rule
Ishikawa diagram
Scatter plot
Pareto Chart
Histogram
This Japanese term refers to an industry method, meaning mistake/error-proofing
Kanban
Poka Yoke
Ishikawa
Kaizen
This required manufacturing document shows the MEASUREMENT TECHNIQUE for EACH PRODUCT CHARACTERISTIC, SAMPLING SIZE & FREQUENCY, & LEVEL OF ERROR PROOFING
Control Plan
FMEA
NPICL
None of the Above
This required document summarizes the required process and production specs, documentation specs and status, as well as product characteristics and performance prior to approval for Mass Production.
Control Plan
FMEA
NPICL
None of the above
At APQP Phase IV, ENGINEERING shall:
Support and Sustain Assembly of Volume Run, Data Collection, Yield Analysis, Report Yield Performance
TRUE
FALSE
Marc Zandman is the
Executive Chair of Vishay Intertechnology
Son of the late Dr. Felix Zandman
All of the above
The name of our company, "Vishay," comes from
The hometown of Dr. Felix Zandman in Israel
The hometown of Dr. Felix Zandman near the German-Polish border
The town of the first plant in Germany
