wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Waterfall Model Quiz

Total questions: 18

Worksheet time: 9mins

Name
Class
Date
1.

The Waterfall Model was the first Process Model to be introduced.

a)

True

b)

False

2.

The Waterfall Model is also referred to as what?

a)

Linear-sequential life cycle model

b)

Non linear-sequential life cycle model

c)

Circular-sequential life cycle model

d)

Non Sequential life cycle model

3.

In a waterfall model, each phase must be completed before what?

a)

It does not matter

b)

The next phase can begin

c)

All of the above

4.

What software development approach was the earliest that was used in software development?

a)

Agile Model

b)

Waterfall model

c)

Scrum Model

5.

What is the first activity under the waterfall model?

a)

Software Testing

b)

Design

c)

User (business) requirements definition

d)

Support and maintenance

6.

What is the last activity under the waterfall model?

a)

Software Testing

b)

Design

c)

User (business) requirements definition

d)

Support and maintenance

7.

What is the full meaning of UAT?

a)

User Acceptance Testing

b)

Using Accept Tester

c)

Unit Acceptance Testing

d)

Universal Acceptance Testing

8.

What is the full meaning of UAT?

a)

User Acceptance Testing

b)

Using Accept Tester

c)

Unit Acceptance Testing

d)

Universal Acceptance Testing

9.

What can be employed to assist in the definition and validation of the requirements?

a)

Software development

b)

Prototyping

c)

User requirements

d)

Security testing

10.

The process of determining the requirements, analyzing and validating them, and managing them throughout the project lifecycle is termed as what?

a)

Software implementation

b)

Software engineering

c)

Requirements engineering

11.

What is considered as a statement of what the software development organization will provide to meet the business requirements?

a)

System requirements of the product

b)

User requirement specification

c)

Requirements engineering

12.

What are the two categories of system requirements?

a)

Functional and Non-functional requirements.

b)

Needs and design

c)

Requirements and design

d)

Application and verification

13.

What requirements define the functionality that is required of the system,

a)

Functional requirements.

b)

Non-Functional requirements.

c)

User Requirements

d)

Application requirements

14.

What requirements will generally include security, reliability, availability, performance and portability requirements?

a)

Functional requirements.

b)

Non-Functional requirements.

c)

User Requirements

d)

Application requirements

15.

What phase of the waterfall model consists of engineering activities to describe the architecture or structure of the system?

a)

Requirements.

b)

Specification analysis

c)

Design

d)

Maintenance

16.

The creative process concerned with how the system will be implemented falls under what phase?

a)

Requirements

b)

Specification analysis

c)

Security

d)

Design

17.

In what phase is the software development team expected to carry out coding activities?

a)

Implementation

b)

Specification analysis

c)

Maintenance

d)

Design

18.

Who carries out unit testing?

a)

The programmer

b)

The project manager

c)

End Users