LEED Process & Project Surroundings: LEED Green Associate Part 2

Total questions: 63

Worksheet time: 35mins

Name
Class
Date
1.

What accounting methodology is used to evaluate the economic performance of a product or system over its useful life?

a)

Cradle-to-cradle

b)

Life cycle costing

c)

Water Budget

d)

Simple Box Energy Modelling

e)

Life cycle assessment

2.

A school building consumes electricity from the grid at night while contributing energy back to the grid during the day from on-site solar panels resulting in the school having no electricity costs. This is an example of:

a)

Zero waste

b)

Net-zero energy

c)

Carbon neutrality

d)

Water balance

3.

Which of the following are salient features of LEED Interpretations? (Choose 3)

a)

There is an initial fee

b)

Reviewed by USGBC

c)

Reviewed by GBCI

d)

Applicable to multiple projects

e)

CIRs are published in an online database

4.

The owner of an office project wants to pursue LEED Certification for his new construction project that is half built. Which of the following is true regarding the project’s likelihood to earn LEED Certification using LEED New Construction Rating System?

a)

The project should contact USGBC

b)

The project can pursue LEED Certification

c)

The project team should submit a CIR

d)

The project is not likely to pursue LEED Certification

5.

What should guide a LEED Project from registration to certification of a project?

a)

LEED Online

b)

Landscape design

c)

Plumbing codes

d)

LEED Reference Guide

e)

LEED Reference standards

6.

What are three important factors of the LEED Green Building Rating System? (Choose 3)

a)

It is prepared by product manufacturers

b)

It is market driven

c)

It is consensus based

d)

It is mandated by the U.S Government

e)

It is voluntary

7.

What is the purpose of having a LEED AP on a project?

a)

To meet the prerequisites

b)

To streamline the LEED Process

c)

To serve as the project administrator

d)

To submit all project data for certification

8.

Which of the following are salient features of LEED Addenda? (Choose 3)

a)

Addenda’s are published once a year

b)

Reviewed by USGBC committee

c)

Addenda incorporate changes and improvements to LEED Rating Systems and Reference Guides

d)

LEED Addenda are applicable to all LEED Projects

e)

Addenda’s are published as frequently as quarterly

9.

A LEED Project is pursuing the following credits: SS Credit Places of Respite, SS Credit Direct Exterior Access, MR Credit PBT Source Reduction – Mercury and MR Credit Design for Flexibility. Which of the following project adaptations under BD+C does this project fall?

a)

Retail

b)

Core and Shell

c)

Schools

d)

New Construction

e)

Healthcare

10.

Which of the following projects would not be eligible for LEED for Existing Buildings: Operations & Maintenance Certification?

a)

An owner occupied building certified under LEED for Commercial Interiors

b)

A tenant occupied building certified under LEED for Commercial Interiors

c)

A twelve month old school building that has not earned any LEED Certification

d)

A commercial building that doesn’t have any tenants yet and is unoccupied

11.

What does the weighting and level of importance of a LEED Credit depend on?

a)

Cost of implementation

b)

The ease of which the credit can be earned

c)

Environmental and human health concerns

d)

Quantity of resources consumed

12.

If a building has already earned LEED for New Construction Certification, what additional certifications could the building earn in the future? Choose 2

a)

LEED Neighborhood Development

b)

LEED Commercial Interiors

c)

LEED Core & Shell

d)

LEED EB: Operations & Maintenance

13.

A LEED Project is pursuing the following credits: SS Credit Places of Respite, SS Credit Site Master Plan, Building Product Disclosure and Optimization – Material Ingredients, IEQ Prerequisite Minimum Acoustic Performance. Which of the following project BD+C adaptations does this project fall under?

a)

Schools

b)

Core and Shell

c)

New Construction

d)

Retail

e)

Hospitality

14.

Which of the following are salient features of Project CIRs? (Choose 3)

a)

LEED project team members need not pay for Project CIRs

b)

There is an initial fee

c)

Reviewed by GBCI

d)

Applicable to multiple projects

e)

Applicable to only one project

15.

Economic prosperity, environmental stewardship and social responsibility define a project’s:

a)

Minimum Program Requirements

b)

Innovation Strategies

c)

Triple bottom line

d)

Sustainability

16.

What statement is true regarding a facility manager?

a)

A facility manager would not be part of an integrated project team

b)

The facility manager has sole responsibility for designing a building recycling plan

c)

A facility manager would be most involved in a project for LEED for New Construction

d)

A facility manager would be most involved in a project for LEED for Existing Buildings: Operations and Maintenance

17.

Projects under which of the following LEED Rating Systems has an option for precertification?

a)

LEED for Existing Buildings: Operations and Maintenance

b)

LEED for Commercial Interiors

c)

LEED for Core and Shell

d)

LEED for Schools

e)

LEED for New Construction

18.

A Core and Shell project in Santa Monica, California is pursuing Regional Priority credits and is searching the USGBC database to explore the six available credits to choose four credits. Which RP Group should the project download

a)

RP Credits applicable for ID+C Projects

b)

RP Credits applicable for Core and Shell Project Types

c)

RP Credits applicable for New Construction

d)

RP Credits applicable for BD+C Projects

19.

What is the term for the analysis of the environmental aspects and potential impacts associated with a product, process, or service?

a)

Life-cycle costing

b)

Energy Analysis

c)

Life-cycle assessment

d)

Energy Audit

20.

How many points can a project earn under innovation?

a)

2

b)

3

c)

4

d)

6

21.

Which of the following variables affect LEED Registration Cost? (Choose 2)

a)

Time when the project team decides to register

b)

Substantial completion of the project

c)

Project’s size

d)

Location of the Project – Inside the U.S. or Outside the U.S

e)

Project’s rating system

22.

A potential School project team is considering LEED Certification for their new school building. Which of the following credits must the project implement in order to earn LEED Platinum Level Certification? (Choose 3)

a)

MR Prerequisite PBT Source Reduction – Mercury

b)

EA Prerequisite Building Level Energy Metering

c)

MR Prerequisite Storage and Collection of Recyclables

d)

EQ Prerequisite Minimum Acoustic Performance

e)

EQ Credit Acoustic Performance

23.

The LEED Credit Checklist allows project teams to mark potential credit achievement as:

a)

Yes/No

b)

Anticipated/Awarded/Denied

c)

Yes/Maybe/No

d)

Pursuing/Not Pursuing

24.

What is a primary reason that a LEED Project can have higher development costs compared to conventional development?

a)

Green building goals were not set in the predesign phase

b)

Rising material costs

c)

Team members working together instead of separately

d)

New green building technologies were used

25.

What intense workshop is used to establish green building goals across all aspects of the building design, drawing on the expertise of all participants?

a)

Charrette

b)

Facility manager meeting

c)

LEED roundtable

d)

Technical Advisory Group meeting

26.

The process of green building begins with the conceptual idea of the project and continues until:

a)

The schematic design is completed

b)

Construction phase

c)

The project building is reused, or recycled

d)

The construction documents are prepared

e)

Ownership change

27.

A building owner’s project includes a major HVAC renovation, significant envelope modifications, and major interior rehabilitation. The owner will occupy 20% of the building’s leasable square footage. What LEED Rating System would be most appropriate for this project?

a)

LEED for New Construction

b)

LEED for Existing Buildings: Operations and Maintenance

c)

LEED for Commercial Interiors

d)

LEED for Core and Shell

28.

The mechanical engineer for a registered LEED Project submitted a project CIR. How can he check the status of a project CIR?

a)

From the GBCI website

b)

From the LEED website

c)

He should submit an inquiry

d)

From the LEED Formal Inquiries page

29.

Which of the following is not a credit category for LEED for Neighborhood Development?

a)

Neighborhood Pattern and Design

b)

Green Infrastructure and Buildings

c)

Awareness and Education

d)

Smart Location and Linkage

30.

What LEED Rating System extends beyond the building footprint to its landscape as well as infrastructure and its local and regional context?

a)

LEED for Homes

b)

LEED for Schools

c)

LEED for Retail

d)

LEED for Neighborhood Development

31.

What are the benefits of becoming a tenant or owner of a building that is certified under LEED for New Construction if the project team wants to also certify under LEED for Commercial Interiors?

a)

There are no benefits

b)

There is no registration fee

c)

Certification fees are reduced

d)

The project is better positioned to earn the additional certification(s)

e)

There are no certification fees

32.

Which of the following options allow project teams to obtain technical guidance on how LEED Requirements – Minimum Program Requirements, Prerequisites and Credits – pertain to their projects? (Choose 2)

a)

Project CIR

b)

Credit Appeal

c)

LEED Interpretation

d)

Precertification

e)

Addenda

33.

A project’s scope of work will include systems upgrades, minor space use changes, and minor facility alterations. What LEED Rating System would be most appropriate?

a)

LEED for Core & Shell

b)

LEED for New Construction

c)

LEED O+M

d)

LEED for Schools

34.

What amount of time do people in the United States spend on average indoors?

a)

60%

b)

90%

c)

80%

d)

70%

e)

50%

35.

A multi-family building that is three stories would be certified under what rating system?

a)

LEED for Core and Shell

b)

LEED for Homes + Multi-Family Low-Rise

c)

LEED for New Construction

d)

LEED for Commercial Interiors

36.

Sustainable design strategies are effectively implemented only by using a:

a)

Conventional approach

b)

Flexible approach

c)

Incremental approach

d)

Whole building approach

37.

what is not covered under the LEED for Core and Shell Rating System? (Choose 2)

a)

HVAC system

b)

Tenant fit out

c)

Base building structure

d)

Building Envelope

e)

Furniture, furnishings, and equipment (FF&E)

38.

A new construction project was registered after a LEED Addenda for BD+C was published. Which of the following is true regarding the project?

a)

Project teams must submit a CIR

b)

Project teams must follow Addenda published prior to their projects registration date.

c)

Project teams are encouraged to follow Addenda published prior to their projects registration date.

d)

Project teams need not follow Addenda published prior to their projects registration date.

39.

Which of the following credits are only applicable for LEED BD+C – Core and Shell Projects?

a)

SS Credit Light Pollution Reduction

b)

LT Credit Bicycle Facilities

c)

LT Credit Green Vehicles

d)

SS Credit Site Master Plan

e)

SS Credit Tenant Design and Construction Guidelines

40.

After project registration for a commercial project how can the project team use the LEED Certification Mark?

a)

The LEED Certification Mark can be used in press releases

b)

The LEED Certification Mark can be used to indicate precertification

c)

The LEED Certification Mark can be used in advertisements or marketing materials

d)

The LEED Certification Mark cannot be used

41.

What must a project do to earn LEED Certification after selecting a rating system?

a)

Satisfy all prerequisites for the selected rating system and earn a minimum number of points

b)

Satisfy relevant prerequisites for the selected rating system and earn a minimum number of points

c)

Pay the relevant fees and appoint a LEED Project Administrator

d)

Earn a minimum number of points only

42.

The submittal of a Credit Interpretation Request (CIR) should include: (Choose 3)

a)

One specific inquiry

b)

Plans and Drawings

c)

A payment of $220

d)

Cut-sheets

e)

Literature not in excess of six hundred words

43.

Which of the following is a Minimum Project Requirement (MPR) for LEED Certification?

a)

A minimum occupancy rate of three hundred Full Time Equivalents (FTEs)

b)

Making the project building area less than 2% of the site area

c)

The project must be in a permanent location on existing land.

d)

A minimum occupancy rate of twenty five Full Time Equivalents (FTEs)

44.

How many points would a project earn for having three LEED APs as principal participants on a project?

a)

0

b)

1

c)

3

d)

2

45.

What steps would be included in the pre-design phase of a green building project? (Choose 2)

a)

Establish project goals and green building criteria

b)

Site selection

c)

Document green materials and systems

d)

Prepare project schedule

46.

What is a stakeholder meeting?

a)

A meeting where engineers work together to discover new synergies

b)

A meeting with everyone that has a vested interest in the outcome of a project

c)

An intense workshop to solve a problem or plan the design of something that includes the project team and stakeholders

d)

A meeting where research is conducted about materials

47.

What major concepts are integral to green building and sustainability? (Choose 3)

a)

Integrated process

b)

Life cycle approach

c)

Systems thinking

d)

Open systems

48.

The portion of the project site submitted for LEED Certification is referred to as the:

a)

Property Area

b)

Property Boundary

c)

LEED Boundary

d)

Project Boundary

49.

What term refers to the investigation and evaluation of the environmental impacts of a given product or service caused or necessitated by its existence?

a)

Simple box Energy Modelling

b)

Soft cost

c)

Life cycle assessment

d)

Hard cost

e)

Life cycle costing

50.

What tool provides cost-effective streamlined certification processes for multiple building certifications?

a)

LEED Online

b)

ENERGY STAR Target Finder

c)

ENERGY STAR Portfolio Manager

d)

LEED Volume Program

51.

What is not true about a closed system in the built environment?

a)

Used resources are released outside the system

b)

All aspects of closed ecosystem are highly integrated to ensure maximum efficiency

c)

There is no waste

d)

Materials in a closed system are used for other purposes at the end of their useful life

52.

A declarant is the person on the project team who:

a)

Is technically qualified to verify the information on the LEED Credit Forms and is authorized by the project administrator to sign the form

b)

Assigns credits to each of the team members through LEED Online

c)

Submits Credit Interpretation Requests (CIRs)

d)

Registers the project

e)

Creates the project narrative on LEED Online

53.

A project complying with all prerequisites will earn:

a)

Silver Certification

b)

Zero points

c)

Gold Certification

d)

Platinum Certification

54.

Identify the process that is related to high performance building systems that will save money over the life of a project?

a)

Life cycle assessment

b)

Energy modeling

c)

Value engineering

d)

Life cycle costing

55.

Green Raters are relevant to:

a)

All LEED Projects

b)

LEED BD+C Projects

c)

LEED for Homes Rating System Projects

d)

LEED Projects needing help

56.

A owner of an existing building wants to improve its ongoing sustainable building operations. Which rating systems should the project utilize?

a)

LEED Homes

b)

LEED BD+C

c)

LEED O+M Existing Buildings

d)

LEED Neighborhood Development

57.

The LEED Project Boundary may not include land that is owned by a party other than that which owns the LEED Project unless:

a)

The land is associated with and supports normal building operations for the LEED Project Building

b)

The land is part of a larger campus project

c)

The land will be included in a future LEED Certification

d)

The land will be donated for the purposes of earning an ID Point

e)

The land is a public property

58.

The mechanical engineer for a registered LEED Project wants to submit a project CIR for a LEED Credit that he has been assigned by the project administrator. Where and how can he submit the project CIR?

a)

He should submit the CIR to LEED Project Administrator who will then use LEED Online to submit the CIR

b)

He should submit the CIR along with the payment through LEED Online

c)

He should mail the CIR with payment to GBCI

d)

He should submit the CIR to LEED Project Administrator

59.

What are the key criteria that define green building performance?

a)

Credits

b)

Innovative designs

c)

Prerequisites

d)

Minimum program requirements

60.

What factor impacts the cost of earning LEED Building Certification?

a)

The type of land the building was built on

b)

The number of stories the building has

c)

Square footage of the building

d)

The number of Full Time Equivalents (FTEs) that will occupy the finished building

61.

What are the goals of the Minimum Program Requirements? Choose 3

a)

Decrease the cost of LEED Certification Fees

b)

Reduce certification process challenges

c)

Protect the integrity of the LEED Program

d)

Give clear guidance to customers

e)

Verify buildings are meeting environmental goals

62.

Which of the following is an example of value engineering?

a)

Replacing a parking lot material with less costly crushed gravel that has higher SRI

b)

Integrating LEED Guidelines into Engineering and Design of the project

c)

Selecting Window systems with higher upfront costs but lower life cycle costs

d)

Choosing an insulation system that has higher costs and lower impact on the environment over a material that lower costs and a greater environmental impact

63.

What are acceptable ways to reference LEED in product literature? (Choose 2)

a)

ABC Carpet flooring contributes to satisfying certain LEED Credits under Materials and Resources Category

b)

ABC Carpet flooring is a LEED Product

c)

ABC Carper flooring complies with certain credits within the Materials and Resources Credit Category in LEED

d)

ABC Carpet flooring is a LEED Certified Product

e)

ABC Carpet flooring is LEED Qualified Product