Which of the following must be addressed in order for a project to satisfy the requirements of MR Prerequisite Storage and Collection of Recyclables? (Choose 3)

a)

Provide dedicated areas accessible to waste haulers and building occupants for the collection and storage of recyclable materials for the entire building

b)

Provide dedicated areas accessible to building occupants for the collection and storage of recyclable materials for the entire building

c)

Recyclable materials must include mixed paper, e-waste, corrugated cardboard, glass, plastics, and metals

d)

Recyclable materials must include mixed paper, corrugated cardboard, glass, plastics, and metals

e)

Provide safe collection, storage, and disposal of two of the following: batteries, mercury containing lamps, and electronic waste

2.

A retailer with existing stores in town has opened a similar store in the same town. Which of the following must be addressed in order for the project to satisfy the requirements of MR Prerequisite Storage and Collection of Recyclables? (Choose 3)

a)

Conduct a waste stream study to identify the retail projects top five recyclable waste streams, by either weight or volume, using consistent metrics

b)

Use historical information from their other locations to identify the retail projects top five recyclable waste streams, by either weight or volume

c)

Provide dedicated areas accessible to waste haulers and building occupants for the separation, collection, and storage of recyclable materials for at least the top four recyclable waste streams identified by the waste study

d)

Provide dedicated areas accessible to waste haulers and building occupants for the separation, collection, and storage of recyclable materials for at least the top three recyclable waste streams identified by the waste study

e)

Provide safe collection, storage, and disposal if If any of the top four waste streams are batteries, mercury containing lamps, or electronic waste

3.

Which of the following should be considered during the design phase when designing appropriately sized storage areas to satisfy the requirements of MR Prerequisite Storage and Collection of Recyclables? (Choose 3)

a)

Storage areas should be easily accessible to building occupants

b)

Storage areas should be easily accessible to building occupants, including visitors, full-time occupants, operations staff, and waste haulers

c)

Take appropriate measures for safe collection, storage, and disposal of hazardous waste streams like batteries, mercury containing lamps, and e-waste

d)

Locate and highlight central collection and storage areas for recyclables on submitted floor plans

e)

Prepare a presentation to education building occupants and visitors on building recycling program

4.

The requirements for MR Prerequisite – Storage and Collection of Recyclables includes which of the following. (Choose 3)

a)

Provide dedicated areas accessible to building occupants only for the collections and storage of recyclable materials for the entire building

b)

Provide dedicated areas accessible to waste haulers and building occupants for the collection and storage of recyclable materials for the entire building

c)

Recyclable materials may be include solely mixed paper, corrugated card board, glass, plastics, and metals

d)

Recyclable materials may include 50% of mixed papers, corrugated card board, glass, plastics, metals, and 10% batteries

e)

Take appropriate measures for the safe collection, storage, and disposal of two of the following: batteries, mercury containing lamps, and electronic waste.

5.

Which of the following should be done by projects without available recycling infrastructure and where recycling service is unavailable to satisfy the requirements of MR Prerequisite Storage and Collection of Recyclables? (Choose 2)

a)

Storage areas should be easily accessible to building occupants

b)

The project is exempt from the prerequisite

c)

Project should still establish accessible recycling areas

d)

Consider alternative means of recycling, such as reuse or donation until a recycling service becomes available

e)

Locate and highlight central collection and storage areas for recyclables on submitted floor plans

6.

Which of the following factors influence the recycling efforts within buildings?

a)

Lack of convenient, physical spaces for recycling

b)

Ignorance about recycling

c)

Non-availability of recycling programs in town

d)

Lack of education

7.

Documentation Submittal for MR Prerequisite Storage and Collection of Recyclables, include which of the following:

a)

Describe the dedicated recycling storage areas for the project and demonstrate that the safe storage and the collection has been provided from the batteries, mercury containing lamps, and e-waste

b)

Provide a floor plan(s) highlighting the recycling storage areas for the project

c)

Demonstrate that the recycling storage areas are sized at minimum of 500 square feet and located appropriately

d)

Submittal must include a five year contract with approved vender

8.

A project team is planning to include the methodology and results of waste stream study as part as documentation for MR Prerequisite Storage and Collection of Recyclables. Which of the following rating system best describe the project?

a)

New Construction

b)

Core and Shell

c)

Schools

d)

Healthcare

e)

Retail

9.

A healthcare project team decides to include mercury containing lamps and certain types of electronic waste under the scope while designing the spaces for collection and storage of recyclables to meet MR Prerequisite Storage and Collection of Recyclables Requirements. Which of the following credits and prerequisites will have a positive affect due to this?

a)

MR Prerequisite PBT Source Reduction – Mercury

b)

MR Credit PBT Source Reduction – Mercury

c)

MR Credit PBT Source Reduction – Lead, Cadmium, and Copper

d)

MR Credit Furniture and Medical Furnishings

e)

MR Credit Design for Flexibility

10.

What of the following should be included in a construction waste management plan for the demolition of an existing building to earn MR Prerequisite Construction and Demolition Waste Management Planning?

a)

Area of the building footprint

b)

Where to dispose of any PCB’s

c)

Location of collection of recyclables for building occupants

d)

The removal of any CFC based refrigerants

11.

What are examples of waste diversion for construction waste management? (Choose2)

a)

Recycling

b)

Disposal in landfills

c)

Incineration

d)

Reuse

12.

A project team is brainstorming various strategies to reduce construction waste. Which of the following is not a strategy to reduce construction waste?

a)

Recycle materials

b)

Increase the size of the building footprint

c)

Sell unused materials

d)

Use salvaged materials

13.

A project team for a school project will reuse the shell of an existing building and recycle the rest of the construction and demolition debris. Which of the following MR Credits will this have a positive affect? (Choose 2)

a)

MR Credit Furniture and Medical Furnishings

b)

MR Credit Building Life-Cycle Impact Reduction

c)

MR Prerequisite Storage and Collection of Recyclables

d)

MR Credit Construction and Demolition Waste Management

14.

Which of the following must a project submit via LEED Online as the Submittal for MR Prerequisite Construction and Demolition Waste Management Planning?

a)

Establish waste diversion for the project by identifying at least five targeted for diversion

b)

Volume of the construction waste heading to the landfill (%) and total waste diverted

c)

A final report detailing all major waste stream generated including disposal and diversion rates

d)

A tentative report with major waste stream forecasted but no requirement for specifies

15.

What should be included in a construction waste management plan in order to achieve MR Prerequisite Construction and Demolition Waste Management Planning?

a)

Which existing building materials, if any, will be reused

b)

The distance products were purchased from the construction site

c)

If any construction waste materials to be recycled will be commingled or separated

d)

New technologies and materials that will help reduce waste

16.

A project team is brainstorming various strategies to reduce construction waste. Which of the following are strategies to reduce construction waste?

a)

Select sustainable building materials

b)

Haul unused materials to a landfill

c)

Use FSC Certified Materials

d)

Give unused materials to a salvage yard

17.

A project team is tabulating waste that would qualify for MR Credit Construction and Demolition Waste Management. Which of the following construction and demolition debris cannot be included? (Choose 2)

a)

Concrete

b)

Rocks

c)

Drywall

d)

Steel

e)

ADC’s

18.

A project team is brainstorming effective construction waste management strategies to qualify for MR Credit Construction and Demolition Waste Management. Which of the following strategies would qualify? (Choose 3)

a)

On-site separation

b)

Architectural salvage

c)

Use of construction waste to infill mining pits

d)

Leaving items on the curb for people to pick up

e)

ADC’s

19.

A project team is considering using on-site separation as a strategy for effective construction waste management. Which of the following non-mandatory actions will help the project in effective implementation of the above strategy to earn MR Credit Construction Waste Management? (Choose 2)

a)

Providing orientation to contractors and sub contractors before construction starts

b)

Providing orientation to contractors and sub contractors before building occupancy

c)

Providing orientation to building occupants before building occupancy

d)

Using multilingual or symbol based signage for on-site source separation areas

20.

A project located in Manhattan, NY has limited storage area for waste containers. Which of the following waste management strategies would you recommend for this project to earn MR Credit Construction Waste Management?

a)

On-site separation

b)

Commingled collection

c)

Leaving items on the curb for people to pick up

d)

Dumping in the ocean

21.

A project located in Austin, TX is considering waste to energy as a diversion strategy to earn MR Credit Construction Waste Management. Which of the following must be true for this strategy in order to qualify as a viable diversion strategy? (Choose 2)

a)

Project teams must demonstrate that reuse and recycling strategies were exhausted before sending waste material to energy facilities

b)

The combustion of wood or “wood derived fuel” is considered waste to energy

c)

The project team should follow the applicable European Commission Waste Framework Directive and European Commission Waste Incineration Directive

d)

The project team should contact USGBC before construction starts to see if this strategy will qualify before proceeding

22.

Which of the following statements is true for a campus project with multiple buildings trying to achieve MR Prerequisite Construction and Demolition Waste Management Planning? (Choose 2)

a)

All buildings in the group may be documented as one

b)

All buildings in the group must be documented as separate

c)

Campus buildings may develop one comprehensive plan for construction waste

d)

Campus buildings must develop separate plan for construction waste

23.

A healthcare project team for a major renovation project reusing existing mercury containing equipment and lamps is brainstorming ideas to reduce mercury containing products and devices and mercury release through product substitution, capture, and recycling. As a first step, which of the following should the healthcare project do to achieve MR Prerequisite PBT Source Reduction – Mercury? (Choose 2)

a)

Inventory existing mercury containing equipment and lamps

b)

Incorporate mercury limits into project specifications

c)

Develop phase out and upgrade plan

d)

Develop a plan for separate plan for construction waste.

e)

Track products during construction

24.

A healthcare project is reusing existing mercury containing equipment and lamps. The project team is conducting an Inventory existing mercury containing equipment and lamps. Which of the following must be done as part of the inventory?

a)

List the maximum mercury content allowed for the mercury containing lamps

b)

List the maximum mercury content allowed for the mercury containing lamps and identify lamps that do not comply with the prerequisite criteria

c)

Develop phase out and upgrade plan

d)

Incorporate mercury limits into project specifications

25.

A healthcare project should do which of the following in addition meeting the requirements of Prerequisite PBT Source Reduction – Mercury to earn MR Credit PBT Source Reduction – Mercury? (Choose 2)

a)

Specify and install fluorescent lamps with low mercury content

b)

Specify and install fluorescent lamps with long lamp life

c)

Do not specify or install circular fluorescent lamps or probe start metal halide lamps

d)

Use probe start metal halide lamps

e)

Specify circular fluorescent lamps

26.

A medical military facility project requires complying with Unified Facilities Criteria (UFC 4-501-01) for certain lamps. Which of the following statements is true for the project to achieve Prerequisite PBT Source Reduction – Mercury if the prerequisite criteria and UFC 4-501-01 conflict?

a)

All affected lamps where a conflict with UFC 4-501-01 may be excluded from the prerequisite

b)

All lamps used in military facility projects are exempt

c)

The project should develop a phase out plan for lamps containing mercury

d)

Only lamps used in operation rooms, dental treatment rooms, and dental labs are exempt

27.

A medical facility is considering mercury free alternatives to low-wattage fluorescent lamps, such as LED or LEC in order to meet Prerequisite PBT Source Reduction – Mercury. Which of the following must be true for the project to use this strategy?

a)

Mercury free alternatives should be at least as energy efficient as comparable mercury containing lamps.

b)

All mercury free alternatives qualify for this prerequisite

c)

Mercury free alternatives should energy efficient as comparable mercury containing lamps

d)

None of the above

28.

The requirements for Option 1 – Historic Building Reuse of the MR Credit Building Life Cycle impact reduction includes which of the following?

a)

Maintaining the existing building structure, envelope and interior non-structural elements of a historic building or contributing building in a historic district

b)

The building or historic building must not be listed or eligible for listing in the local, state, or national register of historic places

c)

Maintain the existing building structure and the interior non-structural elements of a historic building but not a envelope or contributing building in a historic district

d)

Do not demolish any part of historic building or contributing building in a historic district

29.

The requirement for Option 2 – Renovation of Abandoned or Blighted of the MR Credit Building Life Cycle impact reduction include which of the following?

a)

Maintain at least 75% by surface area,of the existing building structure, enclosure, and interior structural elements

b)

The building must be renovated to a state of productive occupancyThe building must be renovated to a state of sufficient occupancy

c)

The building must be renovated to a state of productive occupancy

d)

Up to 50% of the building surface area may be excluded because of deterioration or damage

30.

The requirement for Option 3 – Building and Material Reuse of the MR Credit Building Life Cycle Impact Reduction include which of the following ? (Choose 2)

a)

Reuse or salvage building materials from on-site only as a percentage of the surface area

b)

Reuse or salvage building materials from off site or on-site as a percentage of the surface area

c)

Include structural elements (excluding windows), enclosure materials, and permanently installed interior elements such as walls, doors, floor coverings, celling systems

d)

Include material contributing toward the credits toward MR Credits Building Product Disclosure and Optimisation – Sourcing of Raw Materials

e)

Maintain at least 75% by surface area, of the existing building structure, enclosure and interior structural elements

31.

A project is pursuing MR Credit Building Life Cycle Impact Reduction using Option 3 Building and Material Reuse. Which of the following determine the number of points the projects can earn using this option?

a)

Percentage of completed project area reused

b)

Percentage of completed project surface area reused

c)

Percentage of surface area of the existing building structure

d)

Percentage of completed project surface area reused and less demolished surface area

32.

A project is pursuing MR Credit Building Life Cycle Impact Reduction using Option 4 – Whole Building Life Cycle Assessment. Which of the following should the project do? (Choose 3)

a)

For a new construction (buildings or portion of buildings ), conduct a life cycle assessment of the project’s structure, and enclosure that demonstrates a minimum of 5% reduction, compared with a baseline

b)

In at least three of the six impact categories listed below, one of which must be global warming potential

c)

The baseline and proposed building must be of a comparable size, function and orientation, and operating energy performance as defined in EA Prerequisite Minimum Energy Performance

d)

For a new construction (buildings or portion of buildings), conduct a life cycle assessment of the project’s structure and enclosure that demonstrates a minimum of 15% reduction, compared with a baseline

e)

Use the same assessment software tool and data sets to evaluate both the base line building and proposed building and report all import listed categories. Data sets must be compliant with ISO

33.

A project pursuing MR Credit Building Life Cycle Impact Reduction us counting building materials demolished to create courtyards to increase daylighting may as retained in credit calculations. The project’s new courtyards meets the requirements of EQ Credits Daylight and Quality Views. Which of the following project types best represent the project?

a)

Healthcare

b)

Schools

c)

Warehouse

d)

Core and Shell

34.

An existing buildings with additions may not be able to use which of the options for the existing portions of the building to earn the credit MR Credit Building Life Cycle Impact Reduction?

a)

Option 1. Historic Building Reuse

b)

Option 2. Renovation of Abandoned or Blighted Building

c)

Option 3. Building and Material Reuse

d)

Option 4. Whole Building Life Cycle Assessment

35.

Which types of building reuse can count towards Building Life Cycle Impact Reduction Credit?

a)

Buildings Older than 1950

b)

Historic Buildings

c)

Abandoned Buildings or those considered to be a “blight”

d)

Brick

e)

Furniture

36.

Which of the following provides detailed information on the chemical composition, health effects, safety procedures, and other characteristics of products and materials?

a)

FSC

b)

Material Safety Data Sheets (MSDS)

c)

HPD’s

d)

EPD’s

37.

A project pursuing MR Credit Building Product Disclosure and Optimization – Environmental Product Declarations is using Option 1. Environmental Product Declaration to comply with credit requirements. Which of the following products have the greatest impact towards credit achievement?

a)

Products with a publicly available, critically reviewed life cycle assessment conforming to ISO 14044

b)

Industry wide (generic) EPD

c)

Product Specific Type III EPD

d)

Products with Multi-Attribute Optimization

38.

A project is pursuing MR Credit Building Product Disclosure and Optimization – Environmental Product Declarations using Option 1. Environmental Product Declaration. What should the project teams do in order to earn this credit?

a)

Use at least twenty different permanently installed products sourced from at least five different manufacturers that meet one of the disclosure criteria

b)

Use at least ten different permanently installed products sourced from at least five different manufacturers that meet one of the disclosure criteria

c)

Use at least twenty different permanently installed products that meet one of the disclosure criteria

d)

Use at least ten different permanently installed products that meet one of the disclosure criteria

39.

A project is pursuing MR Credit Building Product Disclosure and Optimization – Environmental Product Declarations using Option 2. Multi-Attribute Optimization. What should the project teams do in order to earn this credit?

a)

Use at least twenty different permanently installed products sourced from at least five different manufacturers that meet one of the disclosure criteria

b)

Use at least ten different permanently installed products sourced from at least five different manufacturers that meet one of the disclosure criteria

c)

Use products that comply with one of the credit criteria for 50%, by cost, of the total value of permanently installed products in the project

d)

Use products that comply with one of the credit criteria for 20%, by cost, of the total value of permanently installed products in the project

40.

A project is pursuing MR Credit Building Product Disclosure and Optimization – Environmental Product Declarations using Option 2. Multi-Attribute Optimization. What should the project teams do in order to qualify for exemplary performance?

a)

Use at least twenty different permanently installed products sourced from at least five different manufacturers that meet one of the disclosure criteria

b)

Purchase 95%, by cost, of permanently installed building products that meet the required attributes

c)

Purchase 75%, by cost, of permanently installed building products that meet the required attributes

d)

Use products that comply with one of the credit criteria for 20%, by cost, of the total value of permanently installed products in the project

41.

A project is pursuing MR Credit Building Product Disclosure and Optimization – Environmental Product Declarations using Option 1. Environmental Product Declaration (EPD). What should the project teams do in order to earn an exemplary point under this credit?

a)

Use at least forty different permanently installed products sourced from at least five different manufacturers that meet one of the disclosure criteria

b)

Use at least twenty different permanently installed products sourced from at least five different manufacturers that meet one of the disclosure criteria

c)

Use products that comply with one of the credit criteria for 50%, by cost, of the total value of permanently installed products in the project

d)

Use products that comply with one of the credit criteria for 20%, by cost, of the total value of permanently installed products in the project

42.

A project pursuing MR Credit Building Product Disclosure and Optimization – Environmental Product Declarations is using Option 2. Multi-Attribute Optimization to comply with credit requirements. Which of the following products have the greatest impact towards credit achievement?

a)

Third party certified products that demonstrate impact reduction below industry average in global warming potential, depletion of the stratospheric ozone layer and eutrophication

b)

Third party certified products that demonstrate impact reduction below industry average in global warming potential and depletion of the stratospheric ozone layer

c)

Product Specific Type III EPD

d)

Products sourced (extracted, manufactured, purchased) within one hundred miles (160km) of the project site

43.

A project pursuing MR Credit Building Product Disclosure and Optimization – Environmental Product Declarations using Option 2 – Multi-Attribute Optimization should refer which of the following sources to verify the reductions claimed in the multiple impact categories?

a)

USGBC Website

b)

Manufacturer’s website

c)

ISO

d)

Third Party Certification Agencies

44.

Which of the following is to true regarding structural components for a project pursuing MR Credit Building Product Disclosure and Optimization?

a)

Structure and enclosure materials may not constitute more than 30% of the value of compliant building products

b)

Structure and enclosure materials may not constitute more than 20% of the value of compliant building products

c)

Structure and enclosure materials may not constitute more than 10% of the value of compliant building products

d)

Structure and enclosure materials may not constitute more than 50% of the value of compliant building products

45.

Which of the following is a standardised way of communicating the environmental effects associated with a product or systems raw material extraction, energy use, chemical makeup, waste generation, and emissions to air, soil, and water?

a)

Material safety data sheet (MSDS)

b)

Environmental product declarations (EPD’s)

c)

International Organization for Standardization (ISO) standards

d)

Health Product Declaration (HPD)

46.

Which of the following defines how to standardize EPD’s for a specific product type and define scope, system boundary, measurement procedures, impact measures and other technical requirements?

a)

Material safety data sheet (MSDS)

b)

A product category rule (PCR)

c)

International Organization for Standardization (ISO) standards

d)

Health Product Declaration (HPD)

47.

Which of the following are acceptable for industries without established PCR’s to adhere with MR Credit Building Product Disclosure and Optimization – EPD Requirements?

a)

Manufacturers should provide Material Safety Data Sheet (MSDS)

b)

Manufacturers may provide life cycle assessments in accordance with ISO

c)

Manufacturers have to establish a PCR

d)

Industries must have established PCR’s to meet MR Credit Building Product Disclosure and Optimization – EPD Requirements

48.

Which of the following must be true for the scope of EPD’s to adhere with MR Credit Building Product Disclosure and Optimization – EPD Requirements?

a)

The scope of any EPD must be at least cradle-to-gate

b)

The scope of any EPD must be at least cradle-to-grave

c)

The scope of any EPD must be at least gate-to-gate

d)

The scope of any EPD must be at least cradle-to-cradle

49.

Program Operators should use which of the following standards for EPD’s to qualify for MR Credit Building Product Disclosure and Optimization – Environmental Product Declarations Credit Requirements?

a)

EPD’s that follow International Organization for Standardization (ISO) standards

b)

Any EPD program

c)

Industry wide EPD’s

d)

Health Product Declaration (HPD)

50.

Which of the following must be true if a project included furniture for MR Credit Building Product Disclosure and Optimization calculations?

a)

All furniture must be included consistently in all cost based credits

b)

All furniture must be included consistently in all MR Credits

c)

Furniture is not required to be included in credit calculations

d)

Furniture should not be included in credit calculations

51.

Which of the following is true if a project includes piping, pipe insulation, ducts, and duct insulation for MR Credit Building Product Disclosure and Optimization calculations?

a)

All mechanical, plumbing, and electrical equipment (MEP), categorized as CSI Master Format divisions 11, 21-28 are excluded from MR Credits

b)

If some of these products are included in credit calculations, not all products of that type must be included for credit calculations

c)

If some of these products are included in credit calculations, all products of that type must be included for credit calculations

d)

None of the above

52.

Which of the following is true if a project includes special equipment, such as elevators, escalators, process equipment, and fire suppression, systems for MR Credit Building Product Disclosure and Optimization Calculations?

a)

All mechanical, plumbing, and electrical equipment (MEP), categorized as CSI MasterFormat divisions 11, 21-28 are excluded from MR Credits

b)

Special equipment, such as elevators, escalators, process equipment, and fire suppression, systems, is excluded from the credit calculations

c)

If some of these products are included in credit calculations, all products of that type must be included for credit calculations

d)

None of the above

53.

Which of the following is true if a project includes formwork for concrete for MR Credit Building Product Disclosure and Optimization Calculations

a)

Products purchased for temporary use on the project, like form work for concrete can be included

b)

Products purchased for temporary use on the project, like form work for concrete are excluded

c)

If some of these products are included in credit calculations, all products of that type must be included for credit calculations

d)

None of the above

54.

Which of the following is true for a healthcare project, pursuing MR Credit Medical Furniture and Furnishings and MR Credit Building Product Disclosure and Optimization?

a)

Freestanding furniture items can be counted in any Building Product Disclosure and Optimization Credits

b)

Freestanding furniture items can be counted in any Building Product Disclosure and Optimization Credits as long as it is consistent

c)

Freestanding furniture items included in MR Credit Medical Furniture and Furnishings cannot be counted in any Building Product Disclosure and Optimization Credits

d)

None of the above

55.

Which of the following items are considered pre-consumer recycled items?

a)

Steel beams created from metal reclaimed from the manufacturing line

b)

Carpets made from nylon that include scraps reclaimed from production

c)

Demolition debris used on another project

d)

Cotton insulation manufactured from factory reject denim jeans

56.

Selecting products that have been developed with a sustainable design is an example of:

a)

Recycling

b)

Waste diversion

c)

Reuse

d)

Source reduction

57.

Which of the following is used to determine if a product is pre-consumer or post-consumer recycled content?

a)

ASHRAE 62.1

b)

Local Codes

c)

USGBC Calculators

d)

ISO 14044

58.

Which of the following materials if reused would be considered pre-consumer recycled content? (Choose 3)

a)

Walnut shells

b)

Construction and demolition debris

c)

Milk jugs

d)

Sawdust

e)

Sunflower seed hulls

59.

Purchasing products with less packaging is an example of which of the following strategies?

a)

Source reduction

b)

Commingled recycling

c)

Waste diversion

d)

Construction waste management

60.

A material which will be part of the permanent building is made of recycled glass obtained and manufactured within five hundred miles of project. This will contribute to which of the following?

a)

Regional materials only

b)

Both regional and recycled materials

c)

Neither regional nor recycled materials

d)

Recycled materials only

61.

A material that can be recycled into a new product at the end of its useful life would be what type of product?

a)

Cradle to grave

b)

Cradle to cradle

c)

Renewable

d)

Passive

62.

A project team uses a door found on-site for a major renovation project and turned into a table. This would qualify as which of the following?

a)

Regional material

b)

Rapidly renewable material

c)

Pre-consumer content

d)

Commingled material

63.

A project pursuing MR Credit Building Product Disclosure and Optimization – Sourcing of Raw Materials is using Option 1. Raw Material Source and Extraction Reporting to comply with credit requirements. Which of the following products have the greatest impact towards credit achievement?

a)

Products sourced from manufacturers with self declared reports

b)

Third-party verified corporate sustainability reports (CSR) which include environmental impacts of extraction operations and activities associated with the manufacturers product and the products supply chain

c)

Product Specific Type III EPD

d)

Products with Multi-Attribute Optimization

64.

A project pursuing MR Credit Building Product Disclosure and Optimization – Sourcing of Raw Materials is using Option 1. Raw Material Source and Extraction Reporting to comply with credit requirements. The project identified three products that are re-used and also have recycled content in it. Which of the following must be true for the project to utilize these products towards credit achievement?

a)

The products qualify for both “recycled content” as well as “reuse” for credit achievement

b)

The products can only qualify for either “recycled content” or “reuse” for credit achievement

c)

The project should submit a CIR

d)

o    The products cannot be used towards credit achievement

65.

Which of the following are acceptable CSR frameworks that meets the requirements of MR Credit Building Product Disclosure and Optimization – Sourcing of Raw Materials using Option 1. Raw Material Source and Extraction Reporting? (Choose 3)

a)

Global Reporting Initiative (GRI) Sustainability Report

b)

ASHRAE Report

c)

U.N. Global Compact: Communication of Progress

d)

ISO 26000: 2010 Guidance on Social Responsibility

e)

USGBC Report

66.

Which of the following standards must be referenced to comply with biobased material to meet the requirements of MR Credit Building Product Disclosure and Optimization – Sourcing of Raw Materials using Option 1. Raw Material Source and Extraction Reporting? (Choose 1)

a)

Sustainable Agriculture Networks Sustainable Agriculture Standard

b)

Forest Stewardship Council

c)

The Rainforest Alliance

d)

ASTM

e)

International Standards ISO 14021–1999

67.

Which of the following “re-use” methods qualify as “Material reuse” to meet the requirements of MR Credit Building Product Disclosure and Optimization – Sourcing of Raw Materials using Option 1. Raw Material Source and Extraction Reporting? (Choose 3)

a)

Forest Stewardship Council certified products

b)

Salvaged products

c)

Refurbished products

d)

Reused products

e)

Product with pre-consumer recycled content

68.

A project pursuing MR Credit Building Product Disclosure and Optimization – Sourcing of Raw Materials is using Option 2. Leadership Extraction Practices to comply with credit requirements. Which of the following products have the greatest impact towards credit achievement?

a)

Products meeting extended producer responsibility criteria

b)

Products meeting bio-based materials criteria

c)

Products meeting wood products criteria and sourced (extracted, manufactured, purchased) within one hundred miles (160 km) of the project site

d)

Products with Multi-Attribute Optimization

69.

A project is pursuing MR Credit Building Product Disclosure and Optimization – Sourcing of Raw Materials using Option 2. Leadership Extraction Practices to comply with credit requirements. What should the project teams do in order to earn an exemplary credit under this option?

a)

Use at least forty different permanently installed products sourced from at least five different manufacturers that meet one of the disclosure criteria

b)

Use at least twenty different permanently installed products sourced from at least five different manufacturers that meet one of the disclosure criteria

c)

Use products that comply with one of the credit criteria for 75%, by cost, of the total value of permanently installed products in the project

d)

Use products that comply with one of the credit criteria for 20%, by cost, of the total value of permanently installed products in the project

70.

A project is pursuing MR Credit Building Product Disclosure and Optimization – Material Ingredients using Option 1. Material Ingredient Reporting to comply with credit requirements. Which of the following materials would comply? (Choose 3)

a)

Use at least twenty different permanently installed products sourced from at least five different manufacturers that meet one of the disclosure criteria

b)

Use at least ten different permanently installed products sourced from at least five different manufacturers that meet one of the disclosure criteria

c)

Use at least twenty different permanently installed products that meet one of the disclosure criteria

d)

Use at least ten different permanently installed products that meet one of the disclosure criteria

71.

A project is pursuing MR Credit Building Product Disclosure and Optimization – Material Ingredients using Option 1. Material Ingredient Reporting to comply with credit requirements. Which of the following materials would comply? (Choose 3)

a)

The end use product has a published, complete Health Product Declaration

b)

The end use product has been certified at the Cradle to Cradle v2 Basic Level

c)

The end use product has been certified at the Cradle to Cradle v3 Bronze Level

d)

The end use product has been certified at the Cradle to Grave v3 Bronze Level

e)

A product with EPD

72.

A project is pursuing MR Credit Building Product Disclosure and Optimization – Material Ingredients using Option 3. Product Manufacturer Supply Chain Optimization to comply with credit requirements. Which of the following materials would comply? (Choose 3)

a)

If any ingredients for a product are assessed with the GreenScreen List Translator

b)

Products sourced from manufacturers who engage in validated and robust safety, health, hazard, and risk programs which at a minimum document at least 99% (by weight) of the ingredients

c)

Products sourced from manufacturers who engage in validated and robust safety, health, hazard, and risk programs which at a minimum document at least 75% (by weight) of the ingredients

d)

Products sourced from product manufacturers with independent third party verification of their supply chain that verifies safety and stewardship information about the chemical ingredients is publicly available

e)

A product with EPD

73.

A project is pursuing MR Credit Building Product Disclosure and Optimization – Material Ingredients using Option 3. Product Manufacturer Supply Chain Optimization to comply with credit requirements. Which of the following must be submitted at credit documentation?

a)

Documentation of supply chain optimization

b)

MR building product disclosure and optimization calculator or equivalent tracking tool

c)

Documentation of chemical inventory through Health Product Declaration

d)

Cradle to Cradle certification labels, manufacturers’ lists of ingredients with GreenScreen assessment

74.

A healthcare project is pursuing PBT Source Reduction – Lead, Cadmium, and Copper. Which of the following should the project teams do specify Lead?

a)

Specify products with the “lead free” label as defined by the Safe Drinking Water Act (SDWA)

b)

Specify and use lead-free roofing and flashing

c)

Specify and use electrical wire and cable with lead content less than five hundred parts per million

d)

None

e)

Specify Lead used for radiation shielding and copper used for MRI Shielding

75.

A healthcare project is pursuing PBT Source Reduction – Lead, Cadmium, and Copper. Many pipes, faucets, and other plumbing products are labelled “lead-free” and comply with the U.S. Safe Water Drinking Act. Which of the following statements is true for the project’s ability to earn this credit?

a)

The “lead-free” compliance with U.S Safe Water Drinking Act is adequate for compliance with this credit

b)

The “lead-free” compliance with U.S Safe Water Drinking Act is not adequate for compliance with this credit

c)

The project should use the EPA Compliance Path

d)

None

e)

Specify Lead used for radiation shielding and copper used for MRI Shielding

76.

A healthcare project is specifying interior and exterior paints that are GreenSeal compliant. Which of the following credits will have a positive affect due to this? (Choose 2)

a)

EQ Credit Low Emitting Materials

b)

MR Credit Furniture and Medical Furnishings

c)

MR Credit PBT Source Reduction – Lead, Cadmium, and Copper

d)

MR Credit PBT Source Reduction – Mercury

77.

A healthcare project undergoing major renovation of an existing hospital is pursuing PBT Source Reduction – Lead, Cadmium, and Copper. Which of the following materials can be excluded from credit requirements? (Choose 3)

a)

Existing products and materials that are not included in the scope of work

b)

Existing Roofing

c)

Existing Electrical cable

d)

Piping in newly renovated areas