wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

BLT141_FINAL EXAM

Total questions: 35

Worksheet time: 24mins

Name
Class
Date
1.

A stretched element used in a concrete member of structure to impart pre-stress to the concrete.

a)

Tendon

b)

Cable

c)

Reinforcement

2.

A group of tendons form a pre-stressing cable

a)

Wire

b)

Cable

c)

Tendon

3.

Internal stresses are induced in a member to counteract the external stresses which are developed due to the external loads or service loads. What do you call this?

a)

Pre-stress

b)

Reinforcement

c)

Pre-tensioned

4.

A method of pre-stressing concrete by tensioning the tendons against hardened concrete. In this method, the pre-stress is imparted to concrete by bearing.

a)

Post-tensioning

b)

Reinforcement

c)

Pre-tensioned

5.

A device generally used to enable the tendon to impart and maintain pre-stress in concrete.

a)

Hydraulic

b)

Wire

c)

Anchorage

6.

When two different materials are bound together so strongly that they act together as a single unit from a structural point of view

a)

Combined construction

b)

Composite construction

c)

Reinforced Concrete

7.

What is CHB stands for?

a)

Concrete Hallow Blocks

b)

Concrete Hollow Blocks

c)

Concrete Hallow Bricks

8.

A method of pre-stressing concrete in which the tendons are tensioned before the concrete is placed.

a)

Reinforcing

b)

Post-tensioning

c)

Pre-tensioning

9.

Steel framing and pre-fabricated steel floor decks are just some of the examples of what type of construction?

a)

Composite Construction

b)

Pre- Engineered Building

c)

Pre-cast

10.

A type of tensile structures in which the all the member are in linear tensile forces.

a)

Three-dimensional Tensile Structures

b)

Linear Tensile Structures    

c)

Surface-Stressed Tensile Structures

11.

A type of tensile structures in which a compilation of elements that are primarily in tension, with the compression being transferred to a central mast and down into the ground.

a)

Three-dimensional Tensile Structures

b)

Linear Tensile Structures    

c)

Surface-Stressed Tensile Structures

12.

This structure is the same as other 2 tensile structure, but the surface members are tension bearing members. Fabric tensile structures are the great examples this.

a)

Three-dimensional Tensile Structures

b)

Linear Tensile Structures    

c)

Surface-Stressed Tensile Structures

13.

In Pre Engineered Building, It is an assembly of built-up I-Shaped steel members & that framing consist trusses or castellated beams etc

a)

Primary frame

b)

sandwich panels

c)

secondary structural elements

14.

Concrete is mixed and poured directly into a mold on-site.

a)

Reinforced concrete

b)

Pre-cast 

c)

Cast-in-place

15.

The buildings which are engineered at a factory and assembled at site, usually a steel structures.

a)

Pre-cast

b)

Post Engineered Buildings

c)

Pre Engineered Buildings

16.

Why do we need to vibrate a freshly poured concrete?

a)

  To harden the concrete

b)

To avoid honeycomb

c)

To level the surface

17.

It is one of the most extensively used walling materials in the Philippines.

a)

Dry walls

b)

Concrete Hollow Blocks

c)

Masonry walls

18.

Disadvantages of Pre Engineered Buildings.

a)

Insulation cost

b)

Rusting / Corrosion Sensitive

c)

Both of the two options

19.

A thin shelled arrangements made out of triangles connected together to form a sphere.

a)

Shell structure

b)

Geodesic structure

c)

Membrane structure

20.

Disadvantages of Geodesic Dome.

a)

Unusable space

b)

Both options given

c)

Customized doors & windows

21.

The Architect who Invented the Geodesic Dome.

a)

Buckminster Fuller

b)

Frank Lloyd Wright 

c)

Charles Rennie Mackintosh

22.

This is a light weight constructions using shell elements . These elements are typically curved and are assembled to large structures.

a)

Geodesic Structure

b)

Shell Structure

c)

Membrane structure

23.

The framing material mainly used in Pre-Engineered Building.

a)

Concrete

b)

Steel

c)

Wood

24.

The having a slight arc or bend induced in a beam.

a)

Camber

b)

Tilt-up     

c)

Deflection

25.

A sort of spatial structures made of tensioned membranes.          

a)

Membrane structure

b)

Shell Structure

c)

Geodesic Structure

26.

Steel framing and pre-fabricated steel floor decks are just some of the examples of what type of construction?

a)

Composite Construction

b)

Pre- Engineered Building

c)

Pre-cast

27.

A method of pre-stressing concrete in which the tendons are tensioned before the concrete is placed.

a)

Reinforcing

b)

Post-tensioning

c)

Pre-tensioning

28.

A stretched element used in a concrete member of structure to impart pre-stress to the concrete.

a)

Tendon

b)

Cable

c)

Reinforcement

29.

The system of structural components which separate the stories of a building.

a)

Floor System

b)

Column

c)

Beams

30.

The main reason why we need to provide a drop panel or column capital when using a flat slab floor system.

   

a)

Columns tend to be twisted

b)

Columns tend to get raptured.

c)

Columns tends to punch-though the floor.

31.

What type of building system used in the given structure?

a)

Pre Engineered Building

b)

Pre-cast

c)

Pre Engineered Building

32.

What type of building system used in the given image?

a)

Tensile Structure

b)

Shell Structure

c)

Membrane Structure

33.

What type of building system used in the given image?

a)

Geodesic Structure

b)

Shell Structure

c)

Membrane Structure

34.

What is the Name of the Building?

a)

Biosphere

b)

TELUS World of Science

c)

Disney's EPCOT Center

35.

What type of building system used in the given structure?

a)

Pre Engineered Building

b)

Pre-cast

c)

Post Engineered Building