wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Design T-Levels

Total questions: 25

Worksheet time: 13mins

Name
Class
Date
1.

Wellbeing, quality of life, helping the community, and environmental sustainability, are benefits of...

a)

Good design

b)

Poor design

c)

Good aesthetic qualities

d)

Poor aesthetic qualities

2.

Which Approved Document Building Regulation deals with the conservation of fuel and power?

a)

Part A

b)

Part L

c)

Part P

d)

Part G

3.

Poor design can...

a)

Reduce saleability

b)

Reduce efficiency

c)

Negatively impact the community

d)

All of these

4.

Vernacular architecture/ construction means the appearance of a building changes to suit the traditional building style of a particular area...

a)

True

b)

False

5.

Which initiative was set up to help reduce carbon emissions and create more sustainable homes?

a)

CSR

b)

BIM

c)

Codes for Sustainable Homes (2006)

d)

Building Regulations

6.

Land previously used for industrial or commercial purposes is commonly known as a...

a)

Industrial site

b)

Greenfield site

c)

Wasteland

d)

Brownfield site

7.

Land that has not previously been built on is commonly known as a...

a)

Greenfield site

b)

Brownfield site

c)

Construction site

d)

Conservation area

8.

Up to 25% of heat loss in homes occurs through which part of the building's envelope?

a)

The walls

b)

The roof

c)

The front door

d)

The floor

9.

When discussing safety, what does the design acronym ERIC stand for?

a)

Exterminate, Reduce, Isolate, Control

b)

Eliminate, Reduce, Isolate, Conserve

c)

Eliminate, Reduce, Isolate, Control

d)

Eliminate, Recycle, Isolate, Control

10.

A risk is : anything that could cause damage or harm

A hazard is : the chance, probability or outcome of any hazard

a)

True

b)

False

11.

What are the four key considerations for national infrastructure design principles?

a)

Climate, People, Places, Value

b)

Climate, Poverty, Places, Value

c)

Change, People, Places, Value

d)

Climate, People, Prices, Value

12.

Prefabrication and modular construction are examples of modern construction methods.

a)

True

b)

False

13.

SIPs are commonly used on modern construction projects, but what are they?

a)

Super Insulated Panels

b)

Structural Insulated Panels

c)

Safety Insulated Panels

d)

Site Insulated Panels

14.

Which design organisation lays out the process of briefing, designing, construction and operating building projects into eight stages?

a)

Part L

b)

RIBA

c)

CSR

d)

Code for Sustainable Homes (2006)

15.

What does the acronym RIBA stand for?

a)

Royal Institute for Building Architects

b)

Royal Institute for Branded Architects

c)

Royal Institute for British Architects

d)

Royal Institute for Bored Architects

16.

Building Regulation Approved Document Part F covers...

a)

Conservation of Fuel & Power

b)

Electrical Safety

c)

Working at Heights

d)

Ventilation

17.

Heritage buildings are listed as Grade 1, Grade 2 and Grade 2*. Which bracket is described here- buildings of exceptional interest, of the highest significance.

a)

Grade 1

b)

Grade 2

c)

Grade 2*

d)

Ask Alkan

18.

What key role does a Clerk of Works undertake throughout the design and build phases of a construction project?

a)

Acts as an onsite representative for the Architect

b)

Acts as an onsite representative for the Quantity Surveyor

c)

Acts as an onsite representative for the Buyer

d)

Acts as an onsite representative for the Site Manager

19.

What are the 6 Ps of Project Planning?

a)

Plausible Planning and Preparation Prevents Poor Performance

b)

Peter's Planning and Preparation Prevents Poor Performance

c)

Professional Planning and Preparation Prevents Poor Performance

d)

Proper Planning and Preparation Prevents Poor Performance

20.

Planning permission laws changed in 2008. Before that time, what was the limit on extension size before planning permission was required?

a)

10 m2

b)

20 m2

c)

30 m2

d)

40 m2

21.

What must be sought from the local planning authority before work can begin on any listed building that will affect its appearance?

a)

A Programme of Works

b)

Planning Permission

c)

Listed Building Consent

d)

Tree Consents

22.

It is an offence under the Wildlife and Countryside Act 1981 not to declare the presence of...

a)

Noisy neighbours

b)

Japanese Knotweed

c)

A record of extensions

d)

Planning permission certificates

23.

What does the acronym SSSI stand for?

a)

Species of Special Scientific Interest

b)

Sites of Special Social Interest

c)

Sites of Special Scientific Interest

d)

Sites of Special Scientific Investigation

24.

What does the acronym BREEAM stand for?

a)

Building Research Establishment Environmental Assessment Method

b)

Building Research Eco Environmental Assessment Method

c)

Building Research Establishment Environmental Achievability Method

d)

Building Research Establishment Environmental Assessment Management

25.

Which act aims to reduce CO2 emissions in the UK by at least 80% by 2050?

a)

Climate Challenge Act 2008

b)

Climate Cheat Act 2008

c)

Climate Chart Act 2008

d)

Climate Change Act 2008