1.

When a Client calls upon the Architect to give oral or written advice and direction, to attend conferences, to make evaluations and appraisals regarding a contemplated project and similar activities, the Architect renders valuable inputs whether or not the Client pursues the project.

a)

Feasibility Studies

b)

Architectural Research

c)

Consultation

d)

Promotional Services

2.

In the project classification, which of the following building types is not part of group 5?

a)

Stadia

b)

Museums

c)

Specialized decorative buildings

d)

Monumental buildings and other facilities

3.

Refers to the orderly arrangement within a piece of land or property on which vertical structures such as buildings, monuments and the like, as well as horizontal developments such as rights-of-way (ROWs), open spaces and activity spaces are to be proposed.

a)

Site and Physical Planning Services

b)

Comprehensive Development Planning Services

c)

Site Development Planning Services

d)

Structural Lay-outing Services

4.

One of the services that can be provided by an Architect under Fulltime Supervision.

a)

Construction Supervision Services

b)

Site Preparation Services

c)

Consultation

d)

Filing of documents

5.

The Construction Manager (CM) can be _________________________.

a)

an independent individual

b)

a member of the staff of the Owner

c)

a firm hired by the Owner to manage the construction of a particular project

d)

all of the above

6.

One of the post-construction services of an Architect on Building maintenance is to ____________________________________________.

a)

maintain orderly entrances, exits and parking areas

b)

monitor security services

c)

innovate schemes to attain maximum building occupancy

d)

assist the proper third parties in seeing to it that all equipment (air-conditioning, sprinkler system, generators, transformers, telecommunications equipment, etc.) are properly maintained and in good working condition

7.

The range of professional services that covers Pre-design Services, Regular Design Services, Specialized Architectural Services, Construction Services and Post-Construction Services.

a)

Comprehensive Architectural Services

b)

Regular Design Services

c)

Construction Services

d)

Complete Architectural Design Services

8.

Design-Build Services simplifies and expedites the process of project delivery while providing creative cost-effective solutions.

a)

True

b)

False

9.

Specialist personnel who may be consulted by the Jurors during the conduct of the Architectural Design Competition to permit them to obtain all necessary relevant information.

a)

Professional Advisors

b)

Technical Advisors

c)

Specialist Advisors

d)

Competition Advisors

10.

PCA stands for _______________.

a)

Philippine Consulting Architect

b)

Philippine Code of Architects

c)

Professional Consulting Architect

d)

Philippine Construction Authority

11.

In Design-build services with guaranteed Maximum PCC, the project construction cost is guaranteed by the architect not to exceed what percentage of the estimated project construction cost.

a)

8%

b)

10%

c)

12%

d)

15%

12.

Under SPP 209, this means the cost of the project which included but is not limited to the construction cost, fees for professional services, the cost of land, right-of-way, legal administrative and other related expenses of the client.

a)

Probable Construction Cost

b)

Construction Cost

c)

Project Cost

d)

Cost plus expenses

13.

This refers to the range of professional services that covers Pre-design services, Specialized Architectural Services, Construction Services and Post-Construction Services.

a)

Comprehensive Architectural Services

b)

Design-build Services

c)

Post-Construction Services

d)

Architectural Design Competition

14.

Promptly examine and render decisions pertaining to documents submitted by the architect is one of the responsibilities of?

a)

Owner

b)

Construction Manager

c)

Project manager

d)

Contractor

15.

Under what phase of Standards of Professional Practice of 2010 does the project undergoing if the architectural plans, technical specifications for utilities, and other details are already done and securing building permit from the office of the building official.

a)

Post-Construction Phase

b)

Design development Phase

c)

Construction Phase

d)

Contract Document Phase

16.

When project is still manageable in size, the architect was then assisted by the Construction Inspector. What is the traditional name/call for the Construction Inspector?

a)

Foreman

b)

Timekeeper

c)

Clerk of Work

d)

Construction Clerk

17.

Billing the tenants for rentals and utilities is under what scope of work in building and facilities administration?

a)

Business Advice and Management

b)

Business Marketing and Assistance

c)

Business Strategies and Development

d)

Business Development and Management

18.

Refers to a coalition of purely Filipino professional consultants or consulting firms; or Filipino professional consultants or consulting firms in collaboration with foreign professional consultants and/or foreign consulting firms authorized to render consultancy services.

a)

UAP

b)

Consulting Architectural Firm

c)

Consortium

d)

Consulting Firms

19.

The Consulting Architect in this area of practice must have much more than the basic knowledge of building materials and finishes, construction methodologies, building envelopes including cladding and roofing systems, architectural fenestrations and architectural hardware, fixtures and fittings.

a)

Architectural Interiors

b)

Forensic Architecture

c)

Building Components

d)

Building Design Systems

20.

It is a detailed analysis of the site involves the identification of a site’s development potentials through the proper utilization of land. The analysis covers the context of the site as well as that of its surrounding environment and the development controls that apply to the site and its environs.

a)

Site utilization and Land-use studies

b)

Site Analysis

c)

Site Selection and Analysis

d)

Site Feasibility

21.

A method of selection for an architect most often used by an individual person undertaking a relatively small project.

a)

Comparative Selection

b)

Design Selection

c)

Direct Selection

d)

Architectural Design Competition

22.

When was “The 2010 Standards of Professional Practice” approved?

a)

July 27, 2011

b)

March 9, 2010

c)

July 27, 2010

d)

March 9, 2011

23.

The body formed by the owner and approved by the professional advisor, to assist the professional advisor and the jury in the administrative conduct of the Architectural Design Competition.

a)

Competition Secretary

b)

Competitor Secretariat

c)

Competition Secretariat

d)

Competitor Secretary

24.

Which activity is included in the contract document phase of the Architect’s regular design services?

a)

Check samples, schedules, and shop drawings

b)

Assist owner in obtaining proposals from contractors

c)

Prepares forms for contract letting and bidding

d)

Assist Owner on documents for Government approval

25.

Ar. Piolo Hidalgo was tasked to create flyers, miniature model, and presentation for the Proposed Condominium Project in order to generate funds for its Construction. As per SPP Document, what type of service is she providing?

a)

Promotional Management

b)

Additional Services

c)

Promotional Services

d)

Business Promotions

26.

The public interest is upheld when a majority of people agree with the planning decision.

a)

True

b)

False

27.

If you are compelled to be a witness in a hearing on a planning matter you cannot provide evidence that contradicts the position taken by your employer.

a)

True

b)

False

28.

As a public sector planner working on policy development for the downtown, you can provide paid planning advice to a developer in a neighbourhood 10 kilometres from the downtown but in the same municipality in which you work.

a)

True

b)

False

29.

Registered Professional Planners must practice in accordance with professional standards. Which one of the following statements about our professional standards is NOT ACCURATE?

a)

Professional standards help the public be assured the practice of planning is professional, accountable and ethical.

b)

Professional standards are consistent and will not change over time.

c)

Professional standards serve as a guide to the knowledge, skills and attitudes required to practice planning.

30.

You are a planner working in the private sector and utilize open data downloaded from the municipal open data portal to determine recent development applications for a client on the surrounding context of their project site. A month later, a new client requests that you compile information on a site in the next city block of the same municipality. You use the open data source and build from the previous file to compile recent development applications within a 10-block radius. Does your use of this data for both clients result in a breach of the professional code to respect your clients’ right to confidentiality?

a)

Yes

b)

No

31.

You are working as a consultant for a non-profit housing organization with a small budget. They want a minor variance on a semi-detached house for a small addition in the backyard. Coincidentally, you have recently helped write a similar application for an identical house in the same neighbourhood. To save your client money, you submit the report verbatim but with a new address, but you don't tell them. Have you upheld your obligation to your client?

a)

Yes

b)

No

32.

The CIP Code of Professional Conduct is the ________ standard of conduct for registered professional planners. Select the correct word/phrase to fill in the blank.

a)

suggested

b)

required

c)

minimum

d)

maximum

33.

You are a private sector planner arranging for a community meeting regarding a planning project. You learn that the date available to most key players falls on a religious holiday not relevant to the key stakeholders. Should you reschedule the meeting to ensure the holiday can be respected?

a)

Yes

b)

No

34.

You are a huge fan of your local professional hockey team, whose tickets are very expensive. Lucky you—the corporation that owns the franchise hires you as a consultant to advise on where they should locate their new practice facility. There are three potential sites, two of which might be contentious in your community. The corporation offers you a driver to visit the three sites and, at the end of the site-visit day, they offer you free tickets for a game that evening in the corporate box. Can you ethically accept these tickets?

a)

Yes

b)

No

35.

You are scouting a location for an upcoming public meeting with a focus on millennials in cities. You notice the bathrooms in the facility are not accessible for people using mobility devices. Which of the following actions is the least acceptable as a professional planner?

a)

Ruling out this venue.

b)

Asking the public to signal in advance if they have mobility concerns

c)

Renting it because your target community is young

d)

Recruiting others to help participants navigate the accessibility challenges

36.

The Planning Act in your province requires that the official notice for mandatory public meetings be placed in the “newspaper of record.” You think this requirement is old-fashioned, ineffective and a waste of money. Today, planners have the option to:

(1) place an ad in the newspaper of record;

(2) use social media to e-blast the public meeting; or

(3) use bulk mail to send meeting notices to all residents.

Which is the best course of action according to the Code of Professional Conduct?

a)

(1), (2) and (3)

b)

(1) and (3)

c)

(1) and (2)

d)

(1)

37.

You are an urban planner for a large metropolitan area. Council has asked licensing and standards staff to craft a new policy that would, in part, restrict the ability of homeowners to operate a short-term rental property in the city. As a member of the planning department, you are not directly involved in the file, but you own a short-term rental that would be rendered illegal under the proposed regulations. How do you best uphold the Code of Professional Conduct?

a)

Transfer ownership to your spouse/partner

b)

Sell the property

c)

Notify your supervisor of a potential conflict of interest

d)

Provide your planning opinion but ask that the report to council not reference you as a source

38.

The provincial government in the province in which you are working has released new planning reforms through a parliamentary bill that will come into force in one week’s time. You are in the process of preparing a planning justification report for your client’s development application. Some, but not all, of the new planning provisions will affect your planning justification. Your client has requested that the development application be submitted as soon as possible; i.e., three days before the new bill comes into force. In the opinions provided in your planning justification report, you should:

a)

Ignore the new legislation and provincial policies as they are not yet in force.

b)

Ignore the current legislation and provincial policies as they will not be in force once the application is processed.

c)

Refer to both sets of policies and their implications for the proposed development.

d)

Advise your client to wait until the new legislation is in place and have no regard for the current legislation.

39.

This method of compensation is frequently used where there is continuing relationship involving a series of projects.

a)

Professional Fee Plus Expenses

b)

Lump Sum or Fixed Fee

c)

Per Diem, Honorarium Plus Reimbursable Expenses

d)

Mixed Methods of Compensation

40.

The SPP provides for more than one method of compensation on a project. Each project should be examined to determine the most appropriate method of compensation.

a)

Professional Fee Plus Expenses

b)

Lump Sum or Fixed Fee

c)

Per Diem, Honorarium Plus Reimbursable Expenses

d)

Mixed Methods of Compensation

41.

This method may be applied to government projects since they entail more paper work and time-consuming efforts.

a)

Professional Fee Plus Expenses

b)

Lump Sum or Fixed Fee

c)

Per Diem, Honorarium Plus Reimbursable Expenses

d)

Mixed Methods of Compensation

42.

Directly and professionally responsible and liable for the construction supervision of the project.

a)

Construction Supervision Group (CSG)

b)

Architect and his Specialist Consultants (SCs)

c)

Architect-in-charge of construction (Aicc)

d)

Consulting Architect

43.

The ___ is in a better position to interpret his drawings and documents and to assure conformity by the Contractor. He can assign his staff to undertake the fulltime supervisory work to perform the works as enumerated in the Architect’s Guidelines

a)

Construction Supervision Group (CSG)

b)

Architect and his Specialist Consultants (SCs)

c)

Architect-of-record (Aor)

d)

Consulting Architect

44.

Normally recommended by the Architect based on their performance, and hired by the Owner.

a)

Construction Supervision Group (CSG)

b)

Architect and his Specialist Consultants (SCs)

c)

Architect-in-charge of construction (Aicc)

d)

Consulting Architect

45.

This technique is applied in the cost management process to minimize the negative effect of simplified operations associated with many cost-reduction programs.

a)

Architectural Programming

b)

Site utilization and Land-use studies

c)

Value Management

d)

Architectural Research

46.

An analysis of the space requirements of the project based on organizational structure and functional set-up pinpoints linkages and interaction of spaces. The formulation of the space program will serve as the basis for the development of the architectural plan / design.

a)

Space planning

b)

Architectural Programming

c)

Value Management

d)

Space Management Studies

47.

Another common practice is consultation between an Architect and a firm of other disciplines, under the extended terms of the Owner-Architect Agreement.

a)

By Association, Consultation or Networking

b)

Architect’s Own Staff

c)

individual Architect

d)

architectural firm

48.

Shall refer solely to the National Government of the Republic of the Philippines

a)

Board

b)

State

c)

Commission

49.

Used when undertaking a relatively small project.

a)

Direct Selection

b)

Negotiation

c)

Comparative Selection

d)

Evaluation & Ranking

50.

May be conducted by committees representing institutions, corporations or public agencies.

a)

Direct Selection

b)

Negotiation

c)

Comparative Selection

d)

Evaluation & Ranking